Submersible Sewage Pumps
Closed State & local contract opportunity Posted
- Solicitation number
- 2026-SWB-33
- State
- Louisiana
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Kevin Smith ksmith6@swbno.org (504) 529-2837
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Sewerage and Water Board of New Orleans is soliciting bids under Invitation to Bid 2026-SWB-33 for approximately 150 110–115V submersible sewage pumps, with bids due November 12, 2026, at 11:00 a.m. CST. Bids are opened at 11:30 a.m. the same day in Procurement Conference Room 131 at 625 St. Joseph Street, New Orleans, with a Microsoft Teams teleconference option. Bids must be submitted in hard copy in sealed envelopes marked with the solicitation number, company name, address, and contact information.
Pumps must have a 2-inch maximum solids diameter, manual thermal protection, a 50-foot cord, a 1-horsepower rating, a continuous duty cycle, and a cast-iron body with a 303 stainless steel base. The bid package requires a Cover Sheet, Bid Form, Affidavits, and manufacturer specifications, and omitted documentation results in bid rejection. The awardee must keep sufficient stock for emergency needs and accept as-needed orders.
Delivery occurs within 15 working days of order placement, Monday through Friday from 7:00 a.m. to 2:00 p.m., by truck with liftgate to the Station D Loading Dock at 2800 Peoples Avenue, New Orleans, Louisiana 70122. Pallets must measure 48 by 40 inches and not exceed 56 inches in height.
The contract runs one year initially with two optional one-year renewals. Prices remain firm for 90 days after bid opening. Price adjustments may be requested between 90 and 120 days before a renewal date, subject to Board approval and indexed to the U.S. Bureau of Labor Statistics Producer Price Index. The Board may award to a single or multiple bidders, reject all bids, or award items separately, grouped, or on an all-or-none basis.
Written questions closed October 28, 2026, at 5:00 p.m., and responses were issued November 6, 2026. The mandatory site visit at the Station D dock was scheduled for November 4, 2026, at 10:00 a.m. and is now past.
Opportunity text
Submersible Sewage Pumps 110-115V Submersible Sewage Pump. SWBNO will order approximately 150 over a three (3) year period. The quantity listed is an estimate. Deliveries shall be made by truck with liftgate to the Sewerage and Water Boards New Orleans Station D Loading Dock, 2800 Peoples Avenue, New Orleans, Louisiana 70122.
Files
| File | Type | Posted |
|---|---|---|
| sewerage and water board_2026-SWB-33_20261022_115754.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity