Studios Energy South Chiller Expansion
Closed State & local contract opportunity Posted
- Solicitation number
- ITN-16096
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 72012 Booster Or Circulating Pumps, In-Line
- 91468 Plumbing
- 93464 Plumbing Equipment And Fixtures, Maintenance And Repair
- 91230 Construction, Power Plant
- 91036 Heating, Air Conditioning, And Ventilation Maintenance And Repair Services (Including Installation)
- 96748 Machinery, All Types
- 96185 Utility Services, Water
- UNSPSC codes
- Point of contact
-
- Karina Rodrigues krodrigues@oversightdistrict.org (689) 254-3170
Opportunity details come from vendor.myfloridamarketplace.com. Updated .
About this opportunity
The Central Florida Tourism Oversight District (CFTOD) is requesting bids for the Studios Energy South Chiller Expansion project in Lake Buena Vista, Florida, with bids due June 26, 2026 and a mandatory pre-bid meeting on June 10, 2026 at 10:00 a.m. The District has established bid preferences for local vendors, veteran small businesses, and opportunity zone businesses on most solicitations.
The scope encompasses installation of a new owner-furnished chiller with piping, appurtenances, and controls; two new owner-furnished chilled water pumps with associated systems; two new owner-furnished condenser water pumps with associated systems; a new concrete cooling tower basin and separate concrete pump pit with field-erected cooling tower (contractor must coordinate with cooling tower manufacturer TEI); a 24-inch underground equalizer pipe connecting the new basin to the existing basin; all electrical systems including lighting and lightning protection for the cooling tower and pump area; new make-up water and overflow drain systems; a new fire protection system as a separate, alarmed branch from the existing dry valve system; removal and relocation of existing yard drain infrastructure; removal and relocation of existing sidewalks and fenceline along the cooling tower yard perimeter; and waterproofing of the new cooling tower basin. Place of performance is 397 Cypress Drive, Lake Buena Vista, Florida 32830.
The mandatory pre-bid meeting will be held at 5300 N Center Drive, Lake Buena Vista, Florida. Bids must be submitted electronically through the CFTOD's PlanetBids platform. Vendor registration on PlanetBids is free and required for bid submission and participation in the question process.
Opportunity text
This project includes the expansion of the Studios Energy South (SES) Chiller Plant, including the installation of new chillers, pumps, cooling tower systems, electrical and fire protection systems, associated piping and controls, site modifications, and related infrastructure improvements.
The construction site is located at 397 Cypress Drive - Lake Buena Vista, FL 32830.
SCOPE OVERVIEW:
A. Installation of new owner-furnished chiller and all associated piping, appurtenances, and controls;
B. Installation of (2) new owner-furnished chilled water pumps and all associated piping, appurtenances, and controls;
C. Installation of new concrete cooling tower basin, separate concrete pump pit, and all cooling tower piping, appurtenances, and controls. Cooling tower shall be field-erected by cooling tower manufacturer (TEI). Contractor shall be responsible for coordinating the installation of cooling tower with TEI. A 24" diameter underground equalizer pipe shall connect the new basin with the existing basin; new pipe shall connect to pipe installed in a previous project;
D. Installation of (2) new owner-furnished condenser water pumps and all associated piping, appurtenances, and controls;
E. All electrical systems supporting the above items #1-4 as well as lighting at new cooling tower and pump area and lightning protection at new cooling tower and pump area;
F. New make-up water and overflow drain systems at new cooling tower;
G. New fire protection system for new cooling tower. Fire protection system shall be a separate, alarmed branch from the existing dry valve system;
H. Removal and relocation of existing yard drain where new cooling tower basin is to be installed;
I. Removal of existing sidewalks along the east and south perimeter of the cooling tower yard and relocation of the fenceline;
J. Waterproofing of new cooling tower basin
Files