Structure Replacement Project - Single Span Bridge Structure Over Cedar Creek
Closed State & local contract opportunity Posted
- Solicitation number
- 66M67
- State
- Illinois
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- IDOT Contracts Office dot.de-contracts@illinois.gov (217) 782-7806
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Illinois Department of Transportation (IDOT) is requesting bids for a structure replacement project on FAP Route 619 (IL 71) in LaSalle County, with bids due September 18, 2026 at 12:00 p.m. via the iCX-Integrated Contractors Exchange system. This is a federal-aid construction contract subject to a 49 CFR Part 26 DBE participation goal of 7.00%, requiring submission of a completed DBE Utilization Plan (form SBE 2026) and applicable DBE Participation Statements documenting either achievement of the goal or good faith effort to meet it.
The scope includes removing and replacing the existing single-span bridge structure (SN 050-0124) with a double box culvert (new SN 050-2063) carrying traffic over Cedar Creek; roadway removal and reconstruction above the proposed structure; roadway resurfacing; paved shoulder widening; guardrail upgrades with HMA stabilization; slope and ditch grading; and field entrance improvements. The work site is located approximately 3.0 miles west of I-39 near Cedar Point in LaSalle County. Utility conflicts are anticipated with Frontier Communications and Metro Communications; existing utilities include electrical service from Ameren Illinois and water service from Cedar Point Water Company.
The contract specifications incorporate the Standard Specifications for Road and Bridge Construction (Adopted January 1, 2022, Revised January 1, 2026), applicable recurring special provisions, supplemental specifications, and special provisions addressing materials, labor, traffic control, utilities, and quality assurance. The contract includes provisions for compensable delay costs, working day adjustments, and payment adjustments based on delays exceeding specified thresholds. Contract award will be made to the lowest responsive and responsible bidder. No estimated contract value is stated in the available documents.
Opportunity text
This is a structure replacement project. The work to be performed under this contract consists of removing and replacing the existing single span bridge structure (SN 050-0124) carrying IL 71 over Cedar Creek with a double box culvert (new SN 050-2063). Additional work includes roadway removal and reconstruction above the proposed structure, roadway resurfacing, paved shoulder widening, guardrail upgrades with HMA stabilization, slope and ditch grading, and field entrance improvements. Location: This project is located on FAP Route 619 (IL 71) approximately 3.0 mile west of I-39 near Cedar Point in LaSalle County.
Files
| File | Type | Posted |
|---|---|---|
| ILDOT 66M67-045.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity