Stormwater Master Drainage Plan & CIP
Closed State & local contract opportunity Posted
- Solicitation number
- #26008
- State
- Colorado
- Responses due
Opportunity facts
- Jurisdiction
- Points of contact
-
- Dana Davison ddavison@sterlingcolo.com (970) 522-9700
- Brett Locke locke@sterlingcolo.com (970) 522-9700
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Sterling is requesting proposals for a City-wide Stormwater Master Drainage Plan and Capital Improvement Program, with proposals due electronically through Bidnet by November 13, 2026 at 3:00 p.m. The source imposes no set-aside, preference, or sole-source restriction. Local presence appears only as an evaluation criterion.
The City lacks a master drainage plan and systemwide hydraulic model, and it faces recurring street flooding, standing water, and road base degradation. The engineering firm must convert legacy CAD data into an Esri geodatabase and build an EPA-SWMM hydraulic model covering 10-year pipe capacity and 100-year overland flow paths. The scope also includes identifying regional detention and outfall relief alternatives and producing a phased 1-, 5-, and 10-year prioritized CIP synchronized with planned street reconstruction. The City encourages proposers to recommend scope adjustments and may consider optional services priced separately. Required submissions include a signed cover letter, a technical proposal of 25 pages maximum in PDF with a Customer Support/Staffing Plan, proof of insurance (Commercial General Liability $1,000,000/$2,000,000, Professional Liability $1,000,000/$2,000,000, Workers' Compensation per Colorado law, and Comprehensive Automotive Liability $500,000), and at least three professional references.
The maximum budget is $220,000, inclusive of labor, field surveying, hydraulic modeling, subconsultants, and reimbursable expenses. Proposals exceeding this amount are deemed nonresponsive and are not evaluated. The initial term is anticipated to begin around late 2026, and the City holds sole discretion over any option or extension.
Evaluation criteria and weights are Design Experience and Technical Approach (25 points), Cost Proposal and Project Value (25 points), Project Team Qualifications (25 points), Relevant Project Experience (15 points), and References and Local Presence (10 points), for 100 points total.
The timeline runs as follows: the non-mandatory pre-proposal conference was held October 20, 2026 via Microsoft Teams, written questions were due October 23 with City responses by October 30, and staff and committee review runs November 16–24. Optional shortlist interviews follow in early December, with final selection and fee negotiations in mid-December and City Council award anticipated for late December 2026 or early January 2027. Proposals become public records under the Colorado Open Records Act after the Notice of Intent to Award, except for verified trade secrets and proprietary data marked and justified in a Confidential Contents Index.
Opportunity text
The City of Sterling (City) is requesting proposals from qualified engineering firms to develop a City-wide Stormwater Master Drainage Plan (SWMDP) and Capital Improvement Program (CIP). The City currently lacks a master drainage plan and systemwide hydraulic model, facing recurring street flooding, standing water, and road base degradation due to flat topography and undersized infrastructure
Files
| File | Type | Posted |
|---|---|---|
| biddoc.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity