Specifications For Inspection Of Electric Distribution Poles
Closed State & local contract opportunity Posted
- Solicitation number
- RFP-FKEC BID #26-12-0-2026/PD
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Adam Pierce procurement@fkec.com (305) 852-2431
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Florida Keys Electric Cooperative is requesting proposals for comprehensive inspection of distribution poles across its system over a seven-year term, with proposals due July 30, 2026. The work must comply with Florida Public Service Commission Rule 25-18.020, which mandates pole inspections at minimum eight-year intervals, and National Electrical Safety Code standards for strength and clearance — both are regulatory filters that define baseline scope.
The scope requires visual inspection and documentation of all distribution poles in the FKEC service territory divided into substantially equal annual increments over seven years. The contractor must develop and execute annual work plans that systematically cover the entire system while satisfying FKEC-specific inspection criteria as detailed in the bid package. The work is performed throughout the Florida Keys region in Monroe County.
The contract term is seven years. Pricing, specific contract values, set-asides, evaluation criteria, site visit requirements, and additional bid submission details are contained in the complete bid package documentation.
Opportunity text
This Statement of Work (SOW) establishes the scope, inspection methodology, and seven-year work plan for the inspection of distribution poles in the Florida Keys Electric Cooperative (FKEC) system. The intent of this program is to inspect the system in substantially equal annual increments over a seven-year period while satisfying applicable Florida Public Service Commission requirements, National Electrical Safety Code (NESC) standards, and the additional inspection criteria specified by FKEC. Florida PSC Rule 25-18.020 requires pole inspections at least every eight years and visual checks for compliance with NESC strength and clearance standards. Please see Bid Package for complete details.
Files
| File | Type | Posted |
|---|---|---|
| fkec OpenBids-DemandStar.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity