Pierce County Surface Water Management Division is soliciting proposals under RFP 2026-RFP-264 for multi-year aquatic vegetation and algae management services at Spanaway Lake, with questions due December 11, 2026 and proposals due December 18, 2026 at 4:00 p.m. Proposers must be Washington State-licensed aquatic herbicide applicators, or be responsible for hiring and directing a licensed applicator if they do not perform the work directly.

Scope covers six task areas: pretreatment vegetation surveys mapping Curlyleaf Pondweed and White/Fragrant Waterlily; pretreatment phosphorus monitoring, including jar and bucket testing for treatment dosing; pretreatment notification to shoreline residents and businesses through signage and direct mail; chemical and mechanical vegetation control compliant with state permits; cyanobacteria management, including phosphorus inactivation and emergency algaecide application; and post-treatment surveys with annual reporting. The contractor must attend at least one public meeting annually, maintain regular communication with County staff, and transmit spatial data in GIS-compatible formats such as shapefiles and geodatabases. Required insurance includes Commercial General Liability of $1 million per occurrence and $2 million aggregate, with Pierce County named as additional insured. The annual workplan is subject to County Council approval.

The price form includes eleven service line items and four product line items covering aquatic herbicide, adjuvants and surfactants, Lanthanum Modified Bentonite, and peroxide-based algaecide, with product quantities to be determined. Estimated quantities serve only as a basis for proposal comparison. Each treatment target is estimated at approximately 50 acres. Prices must include labor, taxes, insurance, bonding, and ground freight, with Washington State sales tax applied separately.

The total estimated contract value is $1.45 million, excluding sales tax, with a single award anticipated. Services begin in March 2027 and run through 2031, subject to Lake Management District authorization, and the County may extend the contract for four additional twelve-month terms at its sole discretion. Contract funding is contingent on availability. The sample professional services agreement caps annual rate adjustments at the Seattle-Tacoma-Bellevue Consumer Price Index, not to exceed 5 percent, and requires monthly invoices within 15 calendar days. Prevailing wage compliance under RCW 39.12 applies if required.

Proposals will be evaluated on Suitability of Pricing (40%), Qualifications and Experience (35%), and Capacity and Availability (25%). All proposals become County property and may be subject to disclosure under the Washington Public Records Act.

Opportunity text

Pierce County Surface Water Management (SWM) Division seeks multi-year services from a lake management firm qualified to implement strategies necessary to address noxious plant growth and cyanobacteria in the lake. This includes the use of chemical and mechanical methods for controlling excess aquatic vegetation (including, but not limited to, Curlyleaf Pondweed and White/Fragrant Waterlily) and to reduce phosphorus levels to reduce the occurrence of harmful algal blooms. It also includes services related to surveying and mapping the nature and extent of noxious aquatic plant growth, post treatment evaluation, posting of public notices necessary to satisfy applicable regulatory and permit conditions, and pre- and post-treatment monitoring as required by permits. The contractor will also be expected to produce a written project report at the end of each season, attend at least one (1) public meeting each year, and maintain active communications with Pierce County staff.

Specific treatment strategies may vary over time, depending on budgetary factors and feedback from County Council and the public. SWM will develop an annual workplan that includes select lake management strategies from the Integrated Aquatic Vegetation Management Plan (IAVMP) and Lake Cyanobacteria Management Plan (LCMP). The Annual Workplan is subject to Council approval. The need for these services is expected to begin in March of 2027 and last the duration of the Lake Management District, which is currently authorized to operate through 2031.

Contractor must be a Washington State Licensed aquatic herbicide applicator. If the contractor does not perform the work, they are responsible for hiring and direct the licensed applicator to ensure compliance with all conditions of the permits.

Contractor must demonstrate the ability to transmit spatial data in a GIS-compatible format, including but not limited to industry standard file types (e.g., shapefiles, geodatabases, or other interoperable formats) that allow for seamless integration with the County's GIS environment.

The project is estimated to cost $1,400,000.00, not including WA State Sales Tax.