Spanaway_Lake_Aquatic_Vegetation_and_Algae_Management.pdf

PDF 606 KB Posted

Attached to
Spanaway Lake Aquatic Vegetation and Algae Management
Solicitation number
2026-RFP-264
Issued by
Pierce County, Washington

About this file

Spanaway Lake Aquatic Vegetation and Algae Management

This is a Request for Proposal (RFP 2026-RFP-264) issued by Pierce County Surface Water Management Division in Washington seeking a qualified lake management firm to provide multi-year aquatic vegetation and algae management services for Spanaway Lake. The scope of work encompasses six primary tasks: pretreatment vegetation surveys mapping noxious plant species (Curlyleaf Pondweed and White/Fragrant Waterlily) and monitoring for invasive species; pretreatment phosphorus monitoring including water quality testing and jar/bucket testing for treatment dosing; pretreatment notification to shoreline residents and businesses with signage and direct mail; aquatic vegetation control using chemical and mechanical methods compliant with state permits; cyanobacteria management including phosphorus inactivation treatments and emergency algaecide application; and post-treatment surveys with annual reporting and stakeholder outreach. The contractor must attend at least one public meeting annually and maintain regular communication with County staff. The proposal submission deadline is December 18, 2026, at 4:00 p.m., with questions due by December 11, 2026. The anticipated contract execution date is March 2027, with services expected to begin in March 2027 and continue through 2031, subject to Lake Management District authorization. The County reserves the right to extend the contract for four additional twelve-month terms at its sole discretion.

The total estimated contract value is $1,450,000, excluding Washington State sales tax, with the County anticipating a single contract award. Proposers must meet minimum qualifications including demonstrated experience with aquatic vegetation management and lake treatment projects, Washington State licensure as an aquatic herbicide applicator (or responsibility for hiring a licensed applicator), and the ability to transmit spatial data in GIS-compatible formats such as shapefiles and geodatabases. Insurance requirements include Commercial General Liability ($1M occurrence/$2M aggregate minimum), Workers Compensation as required by Washington State, and naming Pierce County as an additional insured. Proposals will be evaluated on three criteria: Suitability of Pricing (40%), Qualifications & Experience (35%), and Capacity & Availability (25%). Contract funding is contingent upon availability, and the County reserves the right to reduce, modify, or terminate funding if financial circumstances change. All proposals become County property and may be subject to disclosure under the Washington Public Records Act. No set-asides are explicitly identified in the solicitation.

View the file

Other files

File Type Posted
Exhibit_B_-_Sample_Professional_Services_Agreement.pdf PDF
Exhibit_A_-_Price_Form.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSAL

2026-RFP-264

SPANAWAY LAKE AQUATIC VEGETATION AND ALGAE

MANAGEMENT

Pierce County

1501 Market St, Suite 420

Tacoma, WA 98402

RELEASE DATE: November 25, 2026

DEADLINE FOR QUESTIONS: December 11, 2026

RESPONSE DEADLINE: December 18, 2026, 4:00 pm

RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:

Request For Proposal #2026-RFP-264 Title: Spanaway Lake Aquatic Vegetation and Algae Management https://procurement.opengov.com/portal/piercecountywa https://procurement.opengov.com/portal/%7bproject.government.code%7d

Pierce County

REQUEST FOR PROPOSAL

Spanaway Lake Aquatic Vegetation and Algae Management

1. Introduction

2. Pierce County's eProcurement System

3. Summary

4. Background

5. Objective/Scope of Work

6. Minimum Qualifications

7. Anticipated Contract Details and Expectations

8. Definitions

9. ADA

10. General Information for Proposers

11. RFP Coordinator

12. Timeline

13. Procurement Documents and RFP Holder's List

14. Questions and Answers

15. Submission of Proposals

16. Public Records and Proprietary Material

17. Revisions to the RFP

18. Responsiveness

19. Contract and General Terms & Conditions

20. Costs to Prepare Proposal

21. No Obligation to Contract

22. Rejection of Proposals

23. Most Favorable Terms

24. Concern Resolution Process

25. Cooperative Purchasing

26. Title VI Compliance

27. RFP Questionnaire

28. Administrative, Organization, Threshold Review and Proposal Questions .

29. Evaluation and Scoring

30. Evaluation Process

31. Proposal Scoring Method

32. Scoring Criteria

33. Notification to Proposers

34. Debriefing of Unsuccessful Proposers

35. Protest Procedure

Attachments:

A - Exhibit A - Price Form

B - Exhibit B - Sample Professional Services Agreement

1. Introduction

1.1. Pierce County's eProcurement System

Welcome to Pierce County's eProcurement System. This system is inclusive to the procurement process, including submission of any questions and/or clarifications, the release of any addenda/notices, and submission of proposals. It is strongly encouraged that organizations responding to any procurement first read the entire procurement, paying close attention to the timelines, scope of work, eligibility, submission requirements, and specifically to the questionnaire section, which may include required attachments (when applicable), and ask for any clarifications regarding content and instructions early in the process.

1.2. Summary

Pierce County Surface Water Management (SWM) Division seeks multi-year services from a lake management firm qualified to implement strategies necessary to address noxious plant growth and cyanobacteria in the lake. This includes the use of chemical and mechanical methods for controlling excess aquatic vegetation (including, but not limited to, Curlyleaf Pondweed and White/Fragrant

Waterlily) and to reduce phosphorus levels to reduce the occurrence of harmful algal blooms. It also includes services related to surveying and mapping the nature and extent of noxious aquatic plant growth, post treatment evaluation, posting of public notices necessary to satisfy applicable regulatory and permit conditions, and pre- and post-treatment monitoring as required by permits. The contractor will also be expected to produce a written project report at the end of each season, attend at least one

(1) public meeting each year, and maintain active communications with Pierce County staff.

Specific treatment strategies may vary over time, depending on budgetary factors and feedback from

County Council and the public. SWM will develop an annual workplan that includes select lake management strategies from the Integrated Aquatic Vegetation Management Plan (IAVMP) and Lake

Cyanobacteria Management Plan (LCMP). The Annual Workplan is subject to Council approval. The need for these services is expected to begin in March of 2027 and last the duration of the Lake Management

District, which is currently authorized to operate through 2031.

Contractor must be a Washington State Licensed aquatic herbicide applicator. If the contractor does not perform the work, they are responsible for hiring and direct the licensed applicator to ensure compliance with all conditions of the permits.

Contractor must demonstrate the ability to transmit spatial data in a GIS-compatible format, including but not limited to industry standard file types (e.g., shapefiles, geodatabases, or other interoperable formats) that allow for seamless integration with the County’s GIS environment.

The project is estimated to cost $1,400,000.00, not including WA State Sales Tax.

1.3. Background

NO VALUE

1.4. Objective/Scope of Work

1.4.1. Scope of Work

Task 1: Pretreatment Vegetation Survey

The IAVMP recommends annual survey work be done prior to treatment to ensure accurate assessment of the extent and location of the two primary plants of concern (Potamogeton crispus, aka Curlyleaf

Pondweed and Nymphaea odorata, aka White/Fragrant Waterlily) and to monitor new potentially harmful species (Eurasian watermilfoil, etc.). Plant survey work will use existing bathymetry data and assume a littoral area extending the 20ft contour line. The contractor shall be prepared to accommodate County staff during all survey operations. Pretreatment survey work includes:

• Written notice to County staff no less than five business days in advance of survey work.

• Mapping density and distribution of aquatic vegetation within the littoral zone.

• Surface observations using sampling rakes or similar techniques to classify plant species present.

• Identify shape and location of noxious plant species beds and quantify overall extent of noxious populations.

• Communicating survey results to County staff, including recommended actions and estimated costs that may serve as the basis for developing annual workplans and work assignments under this contract.

• Data products will be packaged in a format compatible with standard ESRI GIS software

(geodatabase or shapefile) and contain appropriate metadata.

Task 2: Pretreatment Phosphorus Monitoring

Implement a comprehensive pretreatment phosphorus monitoring program to support effective lake management and treatment planning, as identified in the LCMP. The selected contractor will coordinate closely with County staff, provide advance notice of field activities, and conduct all monitoring in accordance with regulatory permit requirements. This task ensures the routine collection of key water quality parameters, the evaluation of treatment effectiveness, and the determination of appropriate dosing through jar and bucket testing. The results will directly inform and optimize subsequent phosphorus sequestration treatments. This work includes, but is not limited to, the following deliverables:

• Written notice to County staff no less than five business days in advance of survey work.

• Conduct pretreatment lake monitoring as required by permits.

• Routinely measure and report parameters for evaluating treatment effectiveness:

o At a minimum temperature profile, total phosphorus (TP), DO, soluble reactive phosphorus

(SRP), chlorophyll-a, secchi depth and turbidity form at least one location (maximum depth).

• Perform jar/bucket tests to determine phosphorus sequestration product dosing requirements.

• Perform treatments based on require dosing/application.

Task 3: Pretreatment Notification

Provide all required public notifications preceding lake treatment activities. The contractor will provide to staff with an annual treatment plan outlining the proposed treatment schedule, including estimated application dates and the specific chemicals intended for use. The plan shall be submitted to staff for review and approval prior to implementation and updated as needed to reflect any changes in timing or product selection. The contractor will provide timely, permit-compliant notices to shoreline residents, businesses, and lake users to ensure awareness, safety, and effective treatment conditions including, but not limited to the following deliverables:

• Provide shoreline signage and direct mail treatment notifications to shoreline businesses and residences in accordance with permit requirements and provide county staff with copies of each.

• Post "limited boat use" requests at public boat launches, if needed, to reduce boat traffic for 24 hours before treatment and provide more effective plant control.

• Visibly post notices on docks, shorelines and boat launches at least 24 hours prior to treatment.

• Provide an annual treatment plan outlining the proposed treatment schedule, including estimated application dates and the specific chemicals intended for use.

Task 4: Aquatic Vegetation Control

Implement noxious vegetation management compliant with the Aquatic Plant and Algae Management

General Permit (APAM) coverage held by the Spanaway Lake Management District. The contractor will be responsible for complying with all conditions of the permit, and all contractor personnel applying aquatic herbicides shall be a Washington State licensed aquatic herbicide applicator. This work includes, but is not limited to, the following deliverables:

• Notify County Staff no less than five business days in advance of performing plant management tasks, including the techniques planned and the nature and duration of any required or recommended water use restrictions.

• Comply with all state and local public notification requirements for herbicide treatments and provide County staff with copies of each.

• Post “limited boat use” requests at public boat launches, if needed, to reduce boat traffic for 23 hours before treatment and provide more effective plant control.

• Visibly post notices on docks, shorelines, and boat launches at least 23 hours prior to treatment.

• Conduct any pre- and post-treatment water quality monitoring.

• Apply herbicides indicated for use in the adopted IAVMP to control noxious plant species.

• Strictly adhere to all label specifications and APAM permit conditions during herbicide application.

• Adhere to permit requirements for removing notices after herbicide treatments are applied.

• Maintain herbicide application records and provide copies to County staff following treatment.

This includes maps detailing types of treatments and areas applied.

• Take precautionary measures and protect existing population of any state-listed sensitive plants located near the treatment site from harm.

Task 5: Cyanobacteria Management

Implement Cyanobacteria management strategies as identified in the LCMP as needed including application of 1) phosphorus inactivation products (lanthanum) to sequester excess nutrients and 2) emergency algae control using peroxide-based algaecides if/when conditions warrant. Applications of both products listed above are covered under the Aquatic Plant and Algae Management General Permit

(APAM) coverage held by the Spanaway Lake Management District. All treatments shall be performed by licensed applicators and must follow all applicable permit requirements including public notice. This work includes, but is not limited to, the following deliverables:

Phosphorus Inactivation:

• Notify County Staff no less than five business days in advance of performing phosphorus inactivation treatment.

• Mobilize and stage application equipment and treatment products for application within the approved Washington Department of Fish and Wildlife (WDFW) treatment timing windows.

• Perform lake treatment by applying phosphorus sequestration products (Lanthanum modified bentonite) in accordance with all applicable produce label specifications and permit requirements.

Algaecide treatment:

• Assist County Lake managers in evaluating conditions and determining if algaecide treatments are appropriate in the event of active cyanobacteria bloom.

• If applicable, collect and analyze supporting data for determining if treatments are appropriate, (cell counts, cyanotoxins, phycocyanin, chlorophyll-a, phytoplankton analysis, and Secchi depth).

• Provide shoreline signage and direct mail treatment notifications to shoreline business and residences in accordance with permit requirements.

• Mobilize and stage application equipment and treatment products for application within the approved Washington Department of Fish and Wildlife (WDFW) treatment timing window (July

15-Sept 30th).

• Perform lake treatment by applying approved peroxide-based algaecide products in accordance with all applicable product label specifications and permit requirement.

Task 6: Post Treatment Survey, Reporting, and Annual Stakeholder Outreach

The contractor will be expected to perform post-treatment survey work to assess the effectiveness of treatments and make recommendations based on the results. An annual final report will be submitted electronically to County staff that summarizes pre-and post-treatment survey results, maps of areas treated, records the types and number of herbicides used, and includes recommendations or lessons-learned that may apply to subsequent workplans. The Contractor will also be asked to attend one public meeting to discuss lake management issues, community concerns, treatment results, and recommendations for the subsequent year. This work includes, but is not limited to, the following deliverables:

• Notify County staff no less than five business days in advance of post-treatment survey work.

The contractor should be prepared to accommodate County staff on post-treatment survey activities.

• Prepare maps showing post-treatment plant biovolume.

• Prepare maps showing location and extent of noxious plant species beds post treatment.

• Identify any new plant species of concern that may have cropped up following treatment.

• Communicate survey results to County staff, including recommended actions and estimated costs that may serve as basis for developing a task assignment for additional work under this contract.

• Provide County Staff with an annual report that includes the following:

o Maps of pre-and post-treatment biovolume and noxious plant bed locations and extent.

o Maps showing areas treated and types of treatments applied.

o Estimated acreage of noxious plant beds successfully controlled.

o Narrative description of methods, herbicides, and equipment used (with photos, if possible).

o Discussion of treatment efficacy, challenges faced, and/or lessons learned.

o Recommendations for lake management and vegetation control actions for the following year.

o A copy of all pesticide application records.

• Attend one annual meeting to engage the Citizen Advisory Board of the public to discuss treatment, plant management issues, and recommendations for continued treatments.

1.5. Minimum Qualifications

1.5.1. Proposer Eligibility

To be considered for evaluation and award, proposals must demonstrate that the proposer and its key partners meet the following minimum qualifications:

1. Contractor must demonstrate experience performing aquatic vegetation management and lake treatment projects of similar scope, including aquatic plant surveying, water quality monitoring, regulatory permit compliance, treatment implementation, and technical reporting.

2. Contractor must demonstrate the ability to transmit spatial data in a GIS-compatible format, including but not limited to industry standard file types (e.g., shapefiles, geodatabases, or other interoperable formats) that allow for seamless integration with the County’s GIS environment.

3. Contractor must be a Washington State Licensed aquatic herbicide applicator. If the contractor does not perform the work, they are responsible for hiring and direct the licensed applicator to ensure compliance with all conditions of the permits.

4. Work shall be performed in accordance with recognized sound safety standards and any equipment, supplies and products shall be used in accordance with the manufacturer’s technical specifications.

1.6. Anticipated Contract Details and Expectations

1.6.1. Term

The initial period of performance of any contract resulting from this procurement is anticipated to begin on or around March 2027. Amendments extending the period of performance, if any, shall be at the sole discretion of the County. The County reserves the option to extend contracts for four (4) additional terms of twelve (12) months each. However, no Contractor will be guaranteed an extension.

1.6.2. Value

The total value of this procurement is $1,450,000.00. The County anticipates awarding a single contract from this procurement. The County reserves the right to make fewer awards or no awards, based on the quality and scope of proposals received, available funding, and identified service needs.

Additional federal, State, or local funds may become available during the contracting cycle and allocated through this solicitation. Funding may only be awarded for the same scope of services as described in this solicitation. It is important to note, any contract awarded as a result of this procurement is contingent upon the availability of funding. If at any time during the term of the contract the funding relied upon for the contract is reduced, modified, or eliminated, or if the funding terms are modified, Pierce County reserves the right to amend the contract as appropriate or to terminate the contract.

1.7. Definitions

• “Apparently Successful Proposer (ASP)” means a proposer selected as an entity to perform the anticipated services, subject to completion of contract negotiations and execution of a written contract.

• "Applicant," "Bidder," and "Proposer" mean an organization, agency or provider that submits a formal response to this procurement.

• "Application," "Bid," or "Proposal" mean a formal response to this solicitation.

• “CFR” means Code of Federal Regulations.

• “Client,” "Participant," "Household," or "Member" means an individual (or individuals) who receives services, or is eligible to receive services, under this procurement.

• “Contractor” means an individual or organization whose proposal has been accepted by the

County and has been awarded a fully executed, written contract.

• “Procurement” means the process by which the County obtains services.

• “Request for Proposal (RFP)” or "Solicitation" means this document and its attachments in which needed goods and/or services are identified and organizations are invited to provide information as to how they propose to meet the County's needs.

• “RCW” means Revised Code of Washington.

• “WAC” means Washington Administrative Code.

1.8. ADA

The County complies with the Americans with Disabilities Act (ADA). Bidders should contact the RFP

Coordinator to request an accommodation.

2. General Information for Proposers

2.1. RFP Coordinator

The RFP Coordinator is the sole point of contact in the County for this procurement. All communications between the Proposer and the County upon release of this RFP shall be with the RFP Coordinator.

Joel Stanger

Procurement & Contracts Specialist

Email: joel.stanger@piercecountywa.gov

Phone: (253) 798-4250

Department:

Procurement and Contract Services

Until the County has completed the evaluation process and issued notices to Proposers, the following communication restrictions apply to this RFP:

• Proposers are to rely solely on written statements issued by the RFP Coordinator.

• Any communications other than written statements issued by the RFP Coordinator will be considered unofficial and non-binding on the County.

• Communication directed to parties other than the RFP Coordinator may result in disqualification of the Proposer.

2.2. Timeline

Proposal Release Date: November 25, 2026

Question Submission & Concern Resolution

Request Deadline:

December 11, 2026, 4:00pm

Proposal Submission Deadline: December 18, 2026, 4:00pm

Interview Dates: Within two (2) weeks of the proposal submission deadline.

Estimated Date of Contract Execution: March 2027

The County reserves the right to revise the above timeline.

2.3. Procurement Documents and RFP Holder's List

PROPOSERS WHO REGISTER AND DOWNLOAD RFP DOCUMENTS will be automatically added to the

FOLLOWERS' list in the County's eProcurement Portal. Notifications for solicitation updates, addendum and other procurement information will be sent to all who register on the Pierce County eProcurement

Portal.

2.4. Questions and Answers

Proposers may submit questions through the County's eProcurement Portal, under the Question &

Answer Section, no later than 4:00 pm on the date set forth in Section 2.2. Proposers must be registered in the eProcurement Portal software to submit questions, receive addendums and notifications, and ultimately submit a proposal. Proposers may only rely on written statements issued by the County. Any oral communications are unofficial and are not binding on the County.

2.5. Submission of Proposals

2.5.1. Deadline

The proposal must be received by the time/date as indicated in Section 2.2.

2.5.2. Attachments

Follow instructions carefully - if attachments are provided under this solicitation, they are to be utilized as part of the proposal - do not replace or use the organization's own format, as the proposal may be deemed "non-responsive" or "not eligible."

2.5.3. Instructions

All proposals are evaluated on the completeness and quality of the content. Only those Proposers providing complete information as required will be considered for evaluation. The County is not obligated to contact the organization for correction of proposals and Proposers are strongly encouraged to carefully review their proposals for completeness and accuracy before submitting. For proposals to be considered responsive and move to the review process, the Proposer must, under Section 3, RFP

Questionnaire:

• Acknowledge all required “confirmations.”

• Complete all required attachments, to include uploading any supplemental documents requested in attachments; and

• Upload proposal document:

o The proposal document must address all requirements in Section 1.5, Minimum

Qualifications.

o No specific organization or length of the proposal is required, but clear identification of proposal sections will assist evaluators with scoring the proposal.

2.5.4. Additional Resources/Helps

This section provides a curated list of help articles addressing common questions and challenges proposers may encounter during the Request for Proposal process. The resources below are intended to offer clear guidance, practical solutions, and relevant information to support a smooth and successful submission. Proposers are encouraged to review these materials as needed to better understand requirements, resolve issues, and navigate the process with confidence.

• Vendor Registration

• Following a Project

• Getting Started with Subscriptions

• How to Submit a Question in OpenGov

• How to Submit a Proposal Response in OpenGov

• How to Edit or Withdraw a Proposal after Submission in OpenGov

2.5.5. Electronic Submissions Only

Only electronic submittal via the County's eProcurement Portal shall be accepted for this procurement.

No hard copies, emails, or fax submittals shall be accepted. The accepted forms of submitted materials are .pdf, png., jpeg., and MS Office formats such as docx. and xlsx.

2.5.6. Addenda & Notices

Proposers must acknowledge and confirm each addendum and notice issued under this solicitation. The system will not allow final submission unless all required confirmations are checked.

2.5.7. No Exceptions for Late Responses

Proposers should allow sufficient time to ensure timely receipt of the proposal by the County’s e-procurement System, OpenGov. Late responses will not be accepted and will be automatically disqualified. The County assumes no responsibility for delays caused by Proposer's technical related system errors.

2.5.8. County Property

All proposals and any accompanying documentation become the property of the County and will not be returned.

2.6. Public Records and Proprietary Material

• Organizations should be aware that any records they submit to the County or that are used by the County even if the organization possess the records, may be public records under the

Washington Public Records Act (RCW 42.56). The County must promptly disclose public records upon request unless a statute exempts them from disclosure. Organizations should also be aware that if even a portion of a record is exempt from disclosure, generally, the rest of the record must be disclosed. Exemptions are narrow and specific.

• Organizations should clearly mark any record they believe is exempt from disclosure.

https://opengov.my.site.com/support/s/article/dceacbcf-203c-4b0d-aa57-550043bb0dc0 https://opengov.my.site.com/support/s/article/82615c2a-a6e1-46ed-9b33-ec542acf013d https://opengov.my.site.com/support/s/article/c7a5affa-e073-4d5a-8d87-b6eadcf343a9 https://opengov.my.site.com/support/s/article/12c62371-147b-45f4-9bcd-cf2ce5f58259 https://opengov.my.site.com/support/s/article/8e675a48-dad3-4759-9bae-6b4cb7970d21 https://opengov.my.site.com/support/s/article/4f4218bf-7da6-4fc6-b0c3-7eade0776ebe

2.7. Revisions to the RFP

In the event it becomes necessary to revise any part of this RFP, addenda will be published in the

County's eProcurement Portal.

All amendments and notifications of cancellation shall be posted in the County's eProcurement Portal. If you did not receive this solicitation via the County’s eProcurement Portal, please register there to receive further notifications.

The County also reserves the right to amend or add to, retract from, or cancel this Procurement at any time, in whole or in part, and without penalty.

In the event of a conflict between amendments or between an amendment and this Solicitation

Document, the document issued latest in time shall control.

2.8. Responsiveness

All proposals will be reviewed by the RFP Coordinator to determine compliance with administrative requirements and instructions specified in this solicitation. The Proposer is specifically notified that the

County may reject or withdraw a proposal at any time as nonresponsive for any of the following reasons:

• Incomplete proposal,

• Failure to comply with any part of this solicitation or any Attachments to this procurement,

• Submission of incorrect, misleading, or false information.

The County also reserves the right, however, at its sole discretion to waive minor administrative irregularities, which are defined as variances which do not provide a proposer an advantage or benefit over other proposers.

2.9. Contract and General Terms & Conditions

The ASP will be expected to enter into a contract which is substantially the same as the Sample Contract and its General Terms and Conditions attached as Exhibit C. In no event is a Proposer to submit its own standard contract terms and conditions in response to this solicitation. If a Proposer has a concern regarding a certain General Term & Condition, they can raise the issue per the Questions and Answers section of this solicitation.

2.10. Costs to Prepare Proposal

The County will not be liable for any costs incurred by the Proposer in preparation of a proposal submitted in response to this RFP, in conduct of a presentation or interview, or any other activities related to responding to this RFP.

2.11. No Obligation to Contract

This RFP does not obligate the County to contract for services specified herein.

2.12. Rejection of Proposals

The County reserves the right at its sole discretion to reject any and all proposals received without penalty and not to issue a contract as a result of this RFP.

2.13. Most Favorable Terms

The County reserves the right to make an award without further discussion of the proposal submitted. Therefore, the proposal should be submitted initially on the most favorable terms which the

Proposer can offer. There will be no best and final offer procedure.

The ASP should be prepared to accept this RFP for incorporation into a contract resulting from this

RFP. Contract negotiations may incorporate some or all of the Proposer’s proposal. It is understood that the proposal will become a part of the official procurement file on this matter without obligation to the County.

2.14. Concern Resolution Process

This procedure is available to potential Proposers who are contemplating submitting a proposal in response to this RFP. Only Concern Resolution submissions (Submissions) concerning the following subjects shall be considered:

• A claim that the solicitation unnecessarily restricts competition.

• A claim the solicitation evaluation or scoring process is unfair or flawed, or

• A claim the solicitation requirements are inadequate or insufficient to prepare a response.

Proposers submitting a concern about this procurement shall follow the procedures described below. Submissions that do not follow these procedures shall not be considered. If a Proposer registers a concern against this solicitation, the issue(s) cannot be raised again during the protest period.

All submissions must be in writing and signed by the submitting party or an authorized Agent. The submission must be sent to the Procurement Coordinator, or designee, and needs to be received no later than 4:00 pm, local time, Tacoma, WA, per Section 2.2 Timeline, and must clearly articulate the basis for the submission. The Proposer submitting a concern must also include a proposed remedy.

Upon receipt of a submission, a submission review will be held by the County. The RFP coordinator will respond to submissions in writing and the Finance & Enterprise Services Department Director will be notified of all submissions and provided a copy of the County’s response. A copy of the response to the submission, including any changes to the solicitation, will also be posted in County's eProcurement

Portal.

The concern resolution process does not include an appeal process.

2.15. Cooperative Purchasing

The Washington State Interlocal Cooperation Act, Ch. 39.34 RCW, authorizes public agencies to cooperatively purchase goods and services if all parties agree. By responding to this RFP, Consultants agree that other public agencies may purchase goods and services under this procurement or contract at their own cost and without Pierce County incurring any financial or legal liability for such purchases.

Pierce County agrees to allow other public agencies to purchase goods and services under this procurement or contract, provided that Pierce County is not held financially or legally liable for purchases and that any public agency purchasing under such procurement or contract file a copy of this invitation and such contract in accordance with RCW 39.34.040.

2.16. Title VI Compliance

Pierce County, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to

2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, subtitle A, Office of the Secretary, Part 21, nondiscrimination in federally assisted programs of the Department of

Transportation issued pursuant to such Act, hereby notifies all Proposers that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit proposals in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.

3. RFP Questionnaire

3.1. Administrative, Organization, Threshold Review and Proposal Questions

1. Administrative Questions

1.1. Proposer Confirmation*

As an authorized representative of the Proposer, having carefully examined the Request for Proposals, propose to furnish services in accordance therewith as set forth in the attached proposal.

I further agree that this proposal will remain in effect for not less than sixty (60) calendar days from the date that proposals are due, and that this proposal may not be withdrawn or modified during that time.

I hereby certify that this proposal is genuine and not a false or collusive proposal, or made in the interests or on behalf of any person not therein named; and I have not directly or indirectly induced or solicited any Contractor or supplier on the above work to put in a false proposal or any person or corporation to refrain from submitting a proposal; and that I have not in any manner sought by collusion to secure to myself an advantage over any other contractor(s) or person(s).

In order to induce the County to consider this proposal, the Proposer irrevocably waives any existing rights which it may have, by contract or otherwise, to require another person or corporation to refrain from submitting a proposal to or performing work or providing supplies to Pierce County, and Proposer further promises that it will not in the future directly or indirectly induce or solicit any person or corporation to refrain from submitting a response or proposal to or from performing work or providing supplies to Pierce County.

☐ Please confirm

*Response required

1.2. Ownership and Copyright of Submitted Materials*

By submitting a proposal, I agree that all documents, reports, proposals, submittals, working papers, or other materials prepared by the Proposer pursuant to this proposal shall become the sole and exclusive property of the County, and the public domain, and not property of the Proposer. The Proposer shall not copyright, or cause to be copyrighted, any portion of items submitted to the County in response to this procurement.

☐ Please confirm

*Response required

1.3. Supplemental Attachment Confirmation*

I confirm I have reviewed the content of the following attachments included under this RFP: Sample

Agreement and any other documents as identified as "sample" in the Attachments section and acknowledge I understand and agree to these requirements should my organization receive a contract as a result of this proposal.

☐ Please confirm

*Response required

1.4. Insurance Requirements*

By submitting a proposal, I understand and agree that if awarded funding from this RFP, the organization must be able to meet all insurance requirements based on services being purchased, prior to contract execution, and types of insurances may include, but are not limited to:

• Commercial General Liability Insurance: Required on all contracts. Standard levels are $1M occurrence/$2M aggregate (may be higher/lower, depending on value of contract and type of service).

• Commercial Automobile Liability Insurance: Required when the Contractor uses owned, rented, or leased automobiles to complete the services as required per the contract. Higher coverages may be required for fleet/large passenger vehicles.

• Workers Compensation Insurance: As required by Washington State.

• Professional Liability or Errors and Omissions Insurance: If the Contractor provides services such as analysis, consulting, counseling, daycare, legal, medical, nursing, pastoral, medical, or other services that require professional licensing.

• Other insurance(s) applicable to services being purchased: Such as Excess or Umbrella Liability

Insurance if the contract is in excess of $500,000.

In addition:

• Pierce County shall be named as an "Additional Insured" which must be provided in the insurance endorsement; and

• Insurance requirements also apply to any subcontractors hired by the main Contractor to deliver services, where applicable.

Please see "Exhibit D" in the SAMPLE AGREEMENT under attachments to see full insurance requirements. If you have questions regarding insurance requirements, please submit them through the “Question & Answer” section of the RFP.

☐ Please confirm

*Response required

1.5. Debarment Certification*

As an authorized representative of the Proposer, I certify to the best of my knowledge and belief that the organization and its principals:

A. Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency;

B. Have not within a three-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State, or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property;

C. Are not presently indicted for or otherwise criminally or civilly charged by a government entity

(Federal, State, or local) with commission of any of the offenses enumerated in paragraph (1)(b) of this certification; and

D. Have not within a three-year period preceding this proposal had one or more public transactions

(Federal, State, or local) terminated for cause or default.

E. Does not employ any person nor contracts with any person or agency excluded from participation in federal health care programs under either 42 U.S.C. 1320a-7 (§§1128 or 1128A

Social Security Act) or debarred or suspended.

By checking the confirmation, I understand that a false statement on this certification may be grounds for rejection of this proposal or termination of any award. In addition, under 18 USC Sec. 1001, a false statement may result in a fine of up to $10,000 or imprisonment for up to 5 years, or both.

☐ Please confirm

*Response required

2. Organization Information

2.1. Authorized Individual*

Please provide the name and title of the individual authorized to execute a contract on behalf of the organization.

*Response required

2.2. Organization Information*

Please provide the legal name, any d/b/a names, years in business, local address, billing address if different, email address, and phone number of the organization making the proposal.

*Response required

2.3. Organization Tax ID Number*

Please provide the Employee Identification Number (EIN).

*Response required

2.4. Ownership Type*

Must choose at least two (2) answers: Profit status (1 or 2) and organizational structure (3, 4, 5, or 6).

Select all that apply

☐ 1. For Profit

☐ 2. Non Profit

☐ 3. Sole Proprietorship

☐ 4. Corporation/LLC/Partnership

☐ 5. City/County/State

☐ 6. Tribal Organization

*Response required

2.5. Organization Contacts*

Please provide the name, phone, and email for:

• Executive Director/CEO/President

• Financial Manager/CFO

• Contract Manager

*Response required

3. Threshold Review Questions

3.1. Washington State Unified Business Identification (UBI) Number*

Please provide the organization's UBI number.

WARNING: Failure to provide a UBI number will be cause for the application to be disqualified from competition.

*Response required

4. Scored Proposal Questions

4.1. Question 1*

Info about question 1.

*Response required

4.2. Proposal Upload*

Please upload your proposal materials here.

*Response required

4. Evaluation and Scoring

4.1. Evaluation Process

An Application Evaluation Committee (AEC) will review the bidding documents and evaluate all responses received based upon the criteria listed herein. The County may request clarifications or additional information, if needed. The proposer determined to be most qualified through the initial evaluation phase may be interviewed and the final determination will also consider reference checks and interviews.

The County intends to select the Contractor most qualified for this pursuit/solicitation and begin the negotiation and award process based on the requirements of this solicitation.

The selected Proposer will be invited to enter into contract negotiations with the County. Should the

County and the selected proposer not reach a mutual agreement, the County will terminate negotiations and move to the next ranked contractor and proceed with negotiations. A Proposer’s inability to agree to the terms of the County’s standard contract may be a basis for the County to terminate negotiations and begin negotiating with one or more other Contractors.

4.2. Proposal Scoring Method

Each evaluator will score the Proposals separately. The scores of all the evaluators will be averaged to determine the Proposer’s score.

In the event the AEC has clarifying questions for a proposer, they shall notify the Procurement

Coordinator who will, in turn, send the question(s) to the appropriate proposer. The Procurement

Coordinator shall provide a deadline for the answers and shall then notify the AEC members of the response. If members of the AEC wish to change their original scores based on the response to the clarifying question(s), they shall notify the Procurement Coordinator who shall determine the proper subsequent process.

The County reserves the right to award the contract to any organization or combination of organizations whose proposal, in the opinion of the County, is in the best interest of the County.

4.3. Scoring Criteria

Points Available - Initial Evaluation:

Point Available - Interview:

Point Available - Executive Review:

Scoring

No. Evaluation Criteria Scoring Method Weight (Points)

1. Suitability of Pricing Points Based 40

(40% of Total)

2. Qualifications & Experience Points Based 35

(35% of Total)

3. Capacity & Availability Points Based 25

(25% of Total)

Interviews

No. Evaluation Criteria Scoring Method Weight (Points)

4.4. Notification to Proposers

The County will notify all proposers of the outcome of their proposal in writing upon completion of the evaluation process.

4.5. Debriefing of Unsuccessful Proposers

Any Proposer, who was not disqualified, who has submitted a proposal and been notified that they were not selected as an ASP may request a debriefing. The request for a debriefing conference must be received by the Procurement Coordinator within 5 days of having been notified that they were not selected.

Discussion at the debriefing conference will be limited to the following:

• Evaluation and scoring of the Proposal.

• Critique of the requesting Proposer’s Proposal based on the comments made by the Application

Evaluation Committee or individual comments made by an evaluator; and

• Review of Proposer’s final score in comparison with other final scores without identifying the other firms.

Comparisons between proposals or evaluations of the other proposals will not be allowed. Debriefing conferences may be conducted in person or remotely and will be scheduled for a maximum of one (1) hour.

4.6. Protest Procedure

Protests may be made only by Proposers or authorized representative of a Proposer who submitted a response to this solicitation document and who have participated in a debriefing conference. Upon completing the debriefing conference, the Proposer is allowed five (5) business days to file with the

Procurement Coordinator a protest of the award decision. Protests must be received by the

Procurement Coordinator no later than 3:30 PM, local time in Tacoma, Washington on the fifth business day following the debriefing. Protests must be in writing, addressed to the Procurement Coordinator, and submitted by email to PCPURCHASING@piercecountywa.gov. The protest must state the RFP number, the grounds for the protest with specific facts and complete statements of the action(s) being protested. A description of the relief or corrective action being requested should also be included.

mailto:PCPURCHASING@piercecountywa.gov

Protests that do not follow these procedures shall not be considered. This protest procedure constitutes the sole administrative remedy available to Proposers under this procurement.

Only protests stipulating an issue of fact concerning the following subjects shall be considered:

• A matter of bias, discrimination, or conflict of interest on the part of an evaluator.

• Errors in computing the score.

• Non-compliance with procedures described in the procurement document or County policy.

Protests not based on procedural matters will not be considered. Protests will be rejected as without merit if they address issues such as: 1) an evaluator’s professional judgment on the quality of a proposal, or 2) County’s assessment of its own needs or requirements.

Upon receipt of a protest, a protest review will be held by the County. The Finance & Enterprise

Services Department Director or an employee delegated by the Director who was not involved in the procurement will consider the record and all available facts and issue a decision within five (5) business days of receipt of the protest. If additional time is required, the protesting party will be notified of the delay.

In the event a protest may affect the interest of another Proposer who also submitted a proposal, such

Proposer will be given an opportunity to submit its views and any relevant information on the protest to the Procurement Coordinator.

The final determination of the protest shall:

• Find the protest lacking in merit and uphold the County’s action; or

• Find only technical or harmless errors in County’s procurement process and determine County to be in substantial compliance and reject the protest; or

• Find merit in the protest and provide the County options which may include:

o Correct the errors and re-evaluate all proposals, and/or o Reissue the solicitation document and begin a new process, or o Make other findings and determine other courses of action as appropriate.

If a protest is filed, the County will wait to execute the contract until a final determination on the protest is made.

1. Introduction
1.1. Pierce County's eProcurement System
1.2. Summary
1.3. Background
1.4. Objective/Scope of Work
1.4.1. Scope of Work
1.5. Minimum Qualifications
1.5.1. Proposer Eligibility
1.6. Anticipated Contract Details and Expectations
1.6.1. Term
1.6.2. Value
1.7. Definitions
1.8. ADA
2. General Information for Proposers
2.1. RFP Coordinator
2.2. Timeline
2.3. Procurement Documents and RFP Holder's List
2.4. Questions and Answers
2.5. Submission of Proposals
2.5.1. Deadline
2.5.2. Attachments
2.5.3. Instructions
2.5.4. Additional Resources/Helps
2.5.5. Electronic Submissions Only
2.5.6. Addenda & Notices
2.5.7. No Exceptions for Late Responses
2.5.8. County Property
2.6. Public Records and Proprietary Material
2.7. Revisions to the RFP
2.8. Responsiveness
2.9. Contract and General Terms & Conditions
2.10. Costs to Prepare Proposal
2.11. No Obligation to Contract
2.12. Rejection of Proposals
2.13. Most Favorable Terms
2.14. Concern Resolution Process
2.15. Cooperative Purchasing
2.16. Title VI Compliance
3. RFP Questionnaire
3.1. Administrative, Organization, Threshold Review and Proposal Questions
1. Administrative Questions
1.1. Proposer Confirmation*
1.2. Ownership and Copyright of Submitted Materials*
1.3. Supplemental Attachment Confirmation*
1.4. Insurance Requirements*
1.5. Debarment Certification*
2. Organization Information
2.1. Authorized Individual*
2.2. Organization Information*
2.3. Organization Tax ID Number*
2.4. Ownership Type*
2.5. Organization Contacts*
3. Threshold Review Questions
3.1. Washington State Unified Business Identification (UBI) Number*
4. Scored Proposal Questions
4.1. Question 1*
4.2. Proposal Upload*
4. Evaluation and Scoring
4.1. Evaluation Process
4.2. Proposal Scoring Method
4.3. Scoring Criteria
Scoring
Interviews
4.4. Notification to Proposers
4.5. Debriefing of Unsuccessful Proposers
4.6. Protest Procedure

File details come from the government source that posted it. Updated .