About this opportunity
The Federal Highway Administration's Central Federal Lands Division is issuing a sources-sought notice for highway and bridge construction services on the Hayden Arch Bridge repair project in Wyoming, with responses due November 4, 2026 at 2:00 p.m. MST. This is a set-aside opportunity for small businesses, including HUBZone small businesses, women-owned small business concerns, 8(a) small businesses, and service-disabled veteran-owned small businesses.
The Hayden Arch Bridge spans the Shoshone River approximately 5 miles west of Cody, Wyoming at 5,060 feet above sea level and provides access to the Bureau of Reclamation's Buffalo Bill Dam Power Plant. The project scope includes concrete spall, crack, delamination, and patch repairs to the bridge superstructure and deck; reconstruction of bridge approaches; minor drainage improvements; signing and guardrail replacement; installation of a waterproofing membrane on the bridge deck; and construction of a temporary debris shield. Principal work items include soil erosion control, roadway aggregate (310 tons), asphalt concrete pavement (350 tons), membrane waterproofing (445 square yards), repair concrete work (38 to 80 square yards), concrete curbing (520 linear feet), and guardrail system installation (263 linear feet). The bridge will remain closed to public traffic throughout construction.
The estimated cost range is $2 million to $5 million. Anticipated advertisement is January 2027, with award expected in March 2027, notice to proceed in April 2027, and contract completion targeted for October 2027, representing a 120-day construction duration.
Interested firms must submit bonding capability letters for projects up to $5 million with aggregate bonding capacity information; demonstrate certification in applicable socioeconomic categories; provide proof of SAM registration; and submit a list of comparable road construction projects of equal or greater value and scope that included bridge approach reconstruction, drainage improvements, signing, guardrail replacement, and specified bridge repair work.
Inquiries: Laura Slauter or Jorey Deml at CFLContracts@dot.gov. Contracting office: 12300 West Dakota Avenue, Lakewood, Colorado 80228.
Opportunity text
237310 - Highway, Street, and Bridge Construction. The Hayden Arch Bridge is located on Hayden Arch Road approximately 5 miles west of Cody, WY. The bridge spans the Shoshone River at approximately 5,060 feet above sea level and provides access for the Bureau of Reclamation (BOR) to the Buffalo Bill Dam Power Plant. The PS & E includes one (1) base schedule with no options. The project scope includes repairs of the Hayden Arch Bridge, reconstruction of the bridge approaches, minor drainage improvements, signing, and guardrail replacement. Bridge repairs include concrete spall, crack, delamination, and patch repairs in the bridge superstructure and deck. The scope also includes installing a waterproofing membrane on the bridge deck and constructing a temporary debris shield underneath the bridge. The bridge will be closed to public traffic for the duration of construction.