Solar Photovoltaic System
Open State & local contract opportunity Posted
- Solicitation number
- 41-01-26
- State
- Illinois
- Responses due
Opportunity facts
- Jurisdictions
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Peoria County, Illinois is soliciting proposals for a turnkey solar photovoltaic system project, with proposals due November 30, 2026. The solicitation was posted November 5, 2026, and it names no set-aside, preference, or sole-source restriction.
The required scope runs from design through end of life. It includes site investigation; structural, roof, and electrical assessments; system design and engineering; permitting; and utility interconnection. It also covers equipment procurement, installation, construction, and electrical work, plus coordination with the building owner, County personnel, and the existing roof warranty provider. Post-installation work includes utility approvals, inspection, testing, commissioning, and Authorization to Operate, followed by monitoring, operations and maintenance, warranty administration, and decommissioning or removal at agreement end, where applicable. Respondents must clearly identify any work or cost excluded from their proposals.
The listed jurisdictions are Peoria County (FIPS 17143) and Peoria City (FIPS 1714359000). The detailed scope of work is a 43MB attached PDF, titled "county of peoria solar photovoltaic sys 41-01-26.pdf."
Opportunity text
The proposed solar project, including as applicable: o Site investigation; o Structural assessment; 4 o Roof assessment; o Electrical assessment; o Solar system design; o Engineering; o Permitting; o Utility interconnection; o Equipment procurement; o Installation; o Construction; o Electrical work; o Coordination with the building owner and County personnel; o Coordination with the existing roof warranty provider; o Utility approvals; o Inspection; o Testing; o Commissioning; Authorization to Operate; o Monitoring; o Operations and maintenance; o Warranty administration; and o Decommissioning or removal at the end of the agreement, where applicable. Respondents shall clearly identify any work or cost that is excluded from their proposal.
Files
| File | Type | Posted |
|---|---|---|
| county of peoria solar photovoltaic sys 41-01-26.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity