Snapfinger Wastewater Treatment Plant Phase 3A Construction Project
Closed State & local contract opportunity Posted
- Solicitation number
- PE-64400-NONST-2026-000000223
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 41103210 Laboratory ultraviolet UV sterilizers
- 47101523 Collection tanks
- 47101546 Grit removal system
- 47101549 Gravity filter
- 47101556 Water trough
- 47101563 Wastewater coalescer
- 47101565 Waste gas burner
- 47101567 Electrodialysis machine
- 47101543 Surface aerator
- 47101547 Surface washing device
Show all 44
- 47101562 Drum screen
- 47101564 Waste crusher
- 47101569 Wastewater plane screen
- 47101572 Disc screen
- 47101574 Sequencing batch reactor
- 95121642 Sewage pumping station
- 47101573 Flocculator
- 47101541 Ozone water treatment equipment
- 47101545 Rotating biological contactor RBC
- 47101528 Water treatment dryers
- 47101560 Filter underdrain equipment
- 47101553 Fiber filter
- 47101548 Filter control console
- 47101570 Oxidation ditch
- 48101619 Water sterilization system
- 20142600 Production control system instrumentation
- 47101517 Ultraviolet wastewater disinfection equipment
- 47101522 Packaged water treatment systems
- 47101525 Dewatering equipment
- 47101540 Chemical feeder
- 47101542 Air flotation equipment
- 47101550 Compression filter
- 47101551 Up flow filter
- 47101552 Moving bed filter
- 47101554 Jar tester
- 47101555 Baffle wall
- 47101557 Inclined plate settler
- 47101558 Foam breaker
- 47101559 Scum removal equipment
- 47101561 Adulteration treatment equipment
- 47101566 Multiple media filter
- 47101571 Chlorine gas neutralization unit
- 47101577 Flow arrangement wall
- 95121643 Sewage outfall
- Point of contact
-
- Victor Wills vwills@dekalbcountyga.gov (404) 371-2395
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
DeKalb County, Georgia is procuring a licensed General Contractor to execute the Snapfinger Wastewater Treatment Plant Phase 3A Construction Project. This comprehensive procurement requires the contractor to furnish all labor, materials, tools, equipment, and work necessary to deliver fully functional and operational plant treatment systems in strict accordance with executed contract documents, drawings, and specifications. The scope of work includes demolition and partial demolition of existing tankage and equipment; construction of a new 160 million gallon per day (mgd) influent pump station (IPS); improvements to the existing sludge thickening system; refurbishment of the recently decommissioned aerated grit facility; and conversion of recently decommissioned process tanks into additional wet weather equalization storage. The contractor must possess an active General Contractor license and demonstrate the capability to manage complex wastewater infrastructure projects within the defined timeframe. The opportunity was posted on February 2, 2026, with a proposal submission deadline of March 12, 2026.
The procurement documentation provided does not specify set-aside designations, disadvantaged enterprise restrictions, incumbent vendors, or budget ranges for this project. No information regarding preferences for small businesses, women-owned enterprises, minority-owned enterprises, or other protected classifications is indicated in the available materials. Similarly, no existing infrastructure integration requirements, technology compatibility mandates, or current contractor information has been disclosed. Prospective bidders should obtain the complete solicitation documents from DeKalb County to identify any additional qualifications, evaluation criteria, bonding requirements, insurance specifications, or financial prerequisites that may apply to this substantial wastewater treatment plant construction undertaking.
Opportunity text
Project work includes but in not limited to a licensed General Contractor furnishing all labor, materials, tools, equipment, and all work required to furnish and install the fully functional and operational plant treatment systems in accordance with the executed contract including drawings and specifications within the defined timeframe. This project includes demolition and partial demolition of existing tankage and equipment and construction of a new 160 million gallon per day (mgd) influent pump station (IPS), improvements to the existing sludge thickening system, refurbishment of the recently decommissioned aerated grit facility, and conversion of recently decommissioned process tanks into additional wet weather equalization storage.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity