#SMART18 - Route 670 Connector A Design-Build Project
Open State & local contract opportunity Posted
- Solicitation number
- IFB-130918
- State
- Virginia
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Terry Beigie tbeigie@gcva.us (434) 985-5293
Opportunity details come from mvendor.cgieva.com. Updated .
About this opportunity
Grayson County's Board of Supervisors is soliciting bids under Invitation for Bid #2027-003 for the #SMART18 Route 670 Connector A design-build project, with proposals due February 9, 2027. Addendum No. 1, dated November 2, 2026, replaces the links to the project drawings and documentation in Part 1 of the bidding documents and leaves all other terms unchanged. Bidders must attach a signed acknowledgment of Addendum No. 1 to their proposal, and the original proposal document must be signed separately.
Scope covers design and construction of the new Route 670 Connection, Route 29 auxiliary lanes, right-of-way acquisition, traffic signals, drainage, signing and pavement marking, stormwater management, a Transportation Management Plan, erosion and sediment control, and utility relocations within the project limits. The design-builder must furnish all design, construction services, materials, equipment, tools, and labor.
The attached contract form is a 2016 lump sum design-build agreement between Greene County, Virginia and a design-builder for the same project. It sets the following terms: the county issues Notice to Proceed within fifteen days after the Agreement Date; the design-builder submits a Preliminary Schedule within fifteen days of Notice to Proceed and a Baseline Schedule within ninety days; progress payment applications are due on the tenth of each month, with payment within thirty days of receipt; retainage is not withheld; liquidated damages accrue daily for missed final or interim milestones; performance and payment bonds each equal one hundred percent of the Contract Price; and the county retains ownership of all work product. Price adjustments for asphalt and fuel are available under Exhibits 6.3(a) through 6.3(c) only if the design-builder declares intent in its Price Proposal. The contract price includes all applicable sales, use, and consumer taxes.
Opportunity text
The Project includes, among other things the Design and Construction of (a) the new Route 670 Connection, (b) Route 29 auxiliary lanes, (c) right of way acquisition, (e) traffic signals, (f) drainage, (g) signing and pavement marking, (h) stormwater management, (i) Transportation Management Plan, (j) erosion and sediment control, and (k) utility relocations within the Project limits. Due to sign constraints on eVA, drawings and other documentation is available on shared drive with link listed within Part 1.
Files
| File | Type | Posted |
|---|---|---|
| Addendum 1.pdf | ||
| UPC 111650 - Single Phase Low Bid - Part 3_FINAL.pdf |