Addendum 1.pdf

PDF 123 KB Posted

Attached to
#SMART18 - Route 670 Connector A Design-Build Project
Solicitation number
IFB-130918
Issued by
Grayson County, Virginia

About this file

This is an addendum to Invitation for Bid (IFB) #2027-003 issued by the Board of Supervisors in Virginia for the #SMART18 - Route 670 Connector, a design-build project. Addendum No. 1, dated November 2, 2026, modifies the links in Part 1 of the bidding documents, with all other terms remaining unchanged. The project encompasses design and construction of the new Route 670 Connection, Route 29 auxiliary lanes, right-of-way acquisition, traffic signals, drainage, signing and pavement marking, stormwater management, a Transportation Management Plan, erosion and sediment control, and utility relocations within the project limits. The original IFB was issued on October 30, 2026, with a proposal closing date of February 9, 2027. Project documentation and exhibits are available in the RFP Information Package through an updated shared drive link referenced within the addendum.

Bidders must provide a signed acknowledgement of Addendum No. 1 attached to their proposal document, and the original proposal document must also be separately signed. The addendum does not constitute a signature on the original proposal and serves only to modify the document links; all other bidding requirements and terms remain in effect. No pricing terms, set-asides, incumbent information, or funding details are specified within this addendum document.

View the file

Other files

File Type Posted
UPC 111650 - Single Phase Low Bid - Part 3_FINAL.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 1: IFB# 2027-003

DATE: 11/2/2026

COMMODITY: #SMART18- Route 670 Connector - A Design-Build Project

IN RESPONSE TO IFB # 2027-003 ISSUED: October 30, 2026

CLOSING: February 9, 2027

This addendum forms a part of the bidding documents and notes the modification of the links in Part 1 document, replaced on this date. Everything else remains unchanged. Additionally, the Exhibits (part 4 and 5) are located in the RFP Information Package at the new link updated within the document.

A signed acknowledgement of this addendum must be received by this office attached to your proposal document. Signature on this addendum does not constitute your signature on the original proposal document.

The original proposal document must also be signed.

Sincerely, Terry Beigie Deputy Clerk of the Board of Supervisors/Procurement Official

Name of Firm Signature/Title

Date Printed Name

File details come from the government source that posted it. Updated .