The Maryland Department of Transportation State Highway Administration (SHA) has posted an online electronic bid opportunity for the replacement of Bridge No. 1800700 on MD 5 over Hilton Run in St. Mary's County, Maryland. The project involves constructing a new 40-foot long, 43-foot 8-inch wide single-span steel girder bridge with 40-foot 8-inch of clear roadway, as well as 1,055 feet of roadway reconstruction, a new stormwater management facility, traffic barriers, signing, pavement markings, and landscaping. Bids are due by May 23, 2024, and must be submitted electronically through the Bid Express website. A pre-bid conference will not be held.
The bid documents indicate that minority and disadvantaged business enterprises will be afforded full opportunity to submit bids, and their participation is encouraged. Bids of $100,000 or more require bid security equal to at least 5% of the total bid amount, and the successful bidder will be required to provide payment and performance bonds. The Maryland SHA reserves the right to reject any and all bids. No incumbent vendors or budget ranges were provided in the information given.
Opportunity text
Replacement of Bridge No. 1800700 on MD 5 over Hilton Run. The existing bridge is a single span steel beam bridge 31'-9" (+/-) long and 33'-1" (+/-) wide. The new bridge is a single span steel girder bridge, 40'-0" long and 43'-8 ½" wide, with 40'-8" of clear roadway. The proposed typical section includes two 12'-0" lanes and shoulder widths that vary between 8'-0" and 8'-8". The proposed bridge will be founded on steel H-piles. The project also includes the reconstruction and paving of 1,055 feet of MD 5; construction of a new stormwater management facility; placement of traffic barriers, signing, and pavement markings; removal of the existing bridge; and final landscaping of the project site. A minimum of one lane of traffic will be maintained on the bridge during construction using a system of temporary traffic signals. There is no incentive/disincentive clause for this project.