Sidewalk Replacement and Repair - North (WORCS 2)

Closed State & local contract opportunity Posted

Solicitation number
IFB-26-00296
State
Florida
Responses due

Opportunity facts

Jurisdiction
NIGP codes
Show all 13
UNSPSC codes
Show all 47

Opportunity details come from hillsboroughcounty.bonfirehub.com. Updated .

About this opportunity

Hillsborough County Engineering and Operations Department is requesting bids for sidewalk replacement and repair services across north Hillsborough County under IFB-26-00296, with bids due September 1, 2026 at 2:00 p.m. Eastern Time through the county's electronic bidding system. A 9% Small Business Enterprise participation goal applies to all work orders issued under the contract.

The scope encompasses removal and replacement of existing sidewalk segments, repair and rehabilitation of existing sidewalks and curb ramps, ADA compliance grinding and retrofit, incidental irrigation and sprinkler system repairs, tree removal as necessary, temporary construction traffic control, and site restoration. Work will be issued on an as-needed basis through written work orders at various locations throughout the county with no guaranteed minimum quantity or dollar amount. The contractor must maintain current FDOT pre-qualification in sidewalk and grading work, hold certifications in handrails, curbs, gutters, and driveways, and provide an International Society of Arboriculture Certified Arborist and Florida Certified licensed irrigation contractor on staff. Concrete specifications include detailed formwork requirements referencing ACI standards, synthetic macrosynthetic fiber reinforcement (FORTA-FERRO at 1.5 pounds per cubic yard compliant with ASTM C-1116 and ASTM D-7508), and joint fillers conforming to ASTM D1751 and D1752.

The estimated contract value is $10 million over one year with a unilateral renewal option for one additional year at the county's discretion. Unit-price bidding applies to work orders; Non-Priced Items are allocated at $200,000 maximum and priced using FDOT Construction Cost History data or negotiated rates. Bidders must submit an Earnest Money Deposit or Bid Bond of at least 5% of bid amount; the successful bidder furnishes Performance and Payment Bonds equal to 100% of the awarded contract amount. Progress payments are subject to 5% retainage. Liquidated damages are assessed at $1,092 per day for Substantial Completion delays and $546 per day for Final Completion delays. Work hours are 8:00 a.m. to 5:00 p.m. on low-volume roads, 9:00 a.m. to 4:00 p.m. on high-volume roads, and 9:00 p.m. to 6:00 a.m. on congested level "F" roads, Monday through Friday excluding county holidays unless written authorization is obtained with 72 hours' notice. Contractors must maintain Commercial General Liability ($1–5 million), Automobile Liability ($300,000–$1 million), Workers' Compensation, Professional Liability ($1–5 million per claim), Builders Risk, Employee Dishonesty Bond ($1 million), and Waiver of Subrogation, with all policies from A.M. Best A- Class 7 or better carriers. All insurance must name the county as Additional Insured. Required forms include Drug-Free Workplace Certification, Affidavit of Compliance (denying doing business with designated foreign countries of concern), Substitute W-9, and SBE-1 Form listing all registered SBE subcontractors and material suppliers; SBE subcontractor letters of intent are due within five business days of low-bidder notification.

Opportunity text

Hillsborough County Engineering and Operations Department requires a qualified Contractor to provide sidewalk replacement and repairs estimated at $10,000,000.00. The work performed under this Contract may include, but is not limited to, the following: removal of existing sidewalks, construction of new concrete sidewalk segments, repair, replacement, and rehabilitation of existing sidewalks and curb ramps, grinding and retrofit of existing sidewalks to achieve compliance with the Americans with Disabilities Act (ADA), incidental repairs to irrigation and sprinkler systems impacted by construction activities, tree removal, where necessary to facilitate construction, temporary construction traffic control, including coordination and implementation in accordance with applicable standards, sodding and site restoration. SBE Goal: In connection with this solicitation and its resulting Contract, a goal of 9% has been established for participation by SBE as Subcontractors.

Files

File Type Posted
5-Subcontractors Statement of Satisfaction.pdf.pdf PDF
15-Subcontractor Letter of Intent .pdf PDF
12-Contractors Affidavit for Payment of Debts and Claims 02.18.2026.pdf PDF
17-Attachment B -Sidewalk Specifications.pdf PDF
19-Attachment D - Insurance Requirements.pdf PDF
21-Bid Bond.doc.doc DOC document
1-Drug Free Workplace Form.doc.doc DOC document
3-Application for Payment.pdf.pdf PDF
14-SBE-2 Goal Participation Tutorial.mp4 MP4 file
8-Insurance Certificate.doc.doc DOC document
22-Payment Bond.pdf PDF
9-Substitute W9 Form.pdf.pdf PDF
7-Change Order Form.pdf.pdf PDF
23-Performance Bond.pdf PDF
6-Consent of Surety to Final Payment.pdf.pdf PDF
20-Attachment C - Supplemental Specifications.pdf PDF
18-Project Maps North.pdf PDF
2-Allowance Authorization Release Form.pdf.pdf PDF
25-1. IFB-26-00296 Terms Conditions.pdf PDF
4-Consent of Surety-Change Order.pdf.pdf PDF
24-Agreement - Construction - Term Contract.pdf PDF
16-Attachment A - Construction Sign 2026.pdf PDF
11-SBE Subcontractors Material Suppliers List SBE-1 Form.pdf PDF
10-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
13-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
Show all 25

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity