7-Change Order Form.pdf.pdf

PDF 201 KB Posted

Attached to
Sidewalk Replacement and Repair - North (WORCS 2)
Solicitation number
IFB-26-00296
Issued by
Hillsborough County, Florida

About this file

This is a Change Order Form used by Hillsborough County, Florida for contract modifications. The form serves as the official document authorizing contractors to execute changes and modifications to existing contracts with the county. The form accommodates three primary types of adjustments: time changes, extra work, and credits, with sections to document the reason for change and detailed cost impacts. The document requires comprehensive tracking of contract values, including the original contract sum, cumulative impact of previous change orders, the contract sum prior to the current change order, and the new total contract sum reflecting the current modification. Similarly, the form tracks time impacts by documenting the final completion milestone prior to the change order and specifying whether the timeline is extended, reduced, or unchanged by a designated number of days.

The Change Order Form requires multiple levels of approval and execution, including signatures from the contractor's authorized representative, the Board of County Commissioners Chair, the Hillsborough County Clerk of Circuit Court, and designated county staff including the Department Fiscal Director and County Attorney for legal sufficiency review. Contractor acknowledgment sections accommodate corporate, partnership, and individual entities, each with notarization requirements. The form also includes a Consent of Surety section that requires the surety to acknowledge and consent to any changes in contract amount and completion dates, with corresponding adjustments to performance and payment bonds. All signatories must provide notarized acknowledgments, with the option for physical presence or online notarization, ensuring legal validity and binding commitment to the modified contract terms.

View the file

Other files

File Type Posted
11-SBE Subcontractors Material Suppliers List SBE-1 Form.pdf PDF
3-Application for Payment.pdf.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
6-Consent of Surety to Final Payment.pdf.pdf PDF
21-Bid Bond.doc.doc DOC document
17-Attachment B -Sidewalk Specifications.pdf PDF
23-Performance Bond.pdf PDF
19-Attachment D - Insurance Requirements.pdf PDF
8-Insurance Certificate.doc.doc DOC document
10-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
13-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
9-Substitute W9 Form.pdf.pdf PDF
5-Subcontractors Statement of Satisfaction.pdf.pdf PDF
12-Contractors Affidavit for Payment of Debts and Claims 02.18.2026.pdf PDF
15-Subcontractor Letter of Intent .pdf PDF
14-SBE-2 Goal Participation Tutorial.mp4 MP4 file
20-Attachment C - Supplemental Specifications.pdf PDF
22-Payment Bond.pdf PDF
4-Consent of Surety-Change Order.pdf.pdf PDF
18-Project Maps North.pdf PDF
16-Attachment A - Construction Sign 2026.pdf PDF
25-1. IFB-26-00296 Terms Conditions.pdf PDF
24-Agreement - Construction - Term Contract.pdf PDF
2-Allowance Authorization Release Form.pdf.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revised 01.29.2025

HILLSBOROUGH COUNTY

CHANGE ORDER FORM

CONTRACT: CHANGE ORDER NO.:

BID NO:

CONTRACTOR: PROJECT NO:

CPA NO:

TIME CHANGE EXTRA WORK CREDIT OTHER

The Contractor is hereby authorized and directed to make the following changes and modifications to the aforesaid Contract in accordance with all requirements applicable thereto.

DESCRIPTION OF CHANGE:

COST

IMPACT

FINAL

COMPLETION

DAYS

REASON FOR CHANGE:

The original Contract Sum (TOTAL GMP) was . . . . . . . . . . . . $____________ Net change by previous Change Orders . . . . . . . . . . . . . . . . $____________ The Contract Sum prior to this Change Order was . . . . . . . . . . . . . $____________ The Contract Sum will be by this Change Order. . . . . . $ ____________ (increased, decreased or unchanged) The new Contract Sum including this Change Order will be . . . . . . . . . . $ ____________

The Final Completion Milestone prior to this Change Order was .

The time for Final Completion Milestone will be ______________ by __________( )days.

(extended, reduced or unchanged) The Final Milestone for this change order therefore is therefore

The Contractor waives any and all claims to additional time extension and/or additional monetary compensation resulting from these changes and all cost associated with the change order as herein addressed.

Excepting those terms and provisions conflicting with this Change Order which are hereby changed to conform hereto, the aforesaid Contract as amended by all previous change orders hereto is otherwise reaffirmed in its entirety.

IN WITNESS WHEREOF, this Change Order No. _______ to __________________________________ has been executed by the parties hereto or their duly authorized representatives.

ATTEST: VICTOR D. CRIST COUNTY: HILLSBOROUGH COUNTY FLORIDA

Clerk of Circuit Court

BY: BY:

Deputy Clerk Chair, Board of County Commissioners

BOCC Document Number Date of BOCC approval

ATTEST: CONTRACTOR:

BY:

Witness Authorized Signature (SEAL)

TITLE:

DATE:

BOCC Staff Approval Date

Department Fiscal Department Director Procurement County Attorney:

Approved as to Form and Legal Sufficiency

(ACKNOWLEDGMENT OF CONTRACTOR, IF A CORPORATION)

STATE OF )

COUNTY OF )

The foregoing instrument was acknowledged before me by means of physical presence or online notarization this day of , 20 , by ______________________ (Name of person) as____________________________ for ___________________________________________________.

(ie. Officer, attorney in fact) (Name of party on behalf of whom instrument was executed.)

(Signature of Notary Public)

(Print, Type, or Stamp Name of Notary Public)

Personally Known OR Produced Identification

Type of Identification Produced ______________________

(ACKNOWLEDGMENT OF CONTRACTOR, IF A PARTNERSHIP OR INDIVIDUAL)

STATE OF )

COUNTY OF )

The foregoing instrument was acknowledged before me by means of physical presence or online notarization this day of , 20 , by .

(Name of person acknowledging)

(Signature of Notary Public)

(Print, Type, or Stamp Name of Notary Public)

Personally Known OR Produced Identification

Type of Identification Produced ______________________

CONSENT OF SURETY TO CHANGE ORDER

CONTRACT TITLE:

CONTRACTOR (PRINCIPAL):

SURETY:

AGENT:

The SURETY does hereby acknowledge and agree to Change Order No. to the above referenced contract with Hillsborough County, the contract amount (increasing/decreasing) by $ , and/or extending the completion date by ( ) calendar days. The SURETY further acknowledges that the performance bond and/or payment bond furnished under the aforementioned contract is accordingly changed to reflect the change in contract amount, and/or time included in Change Order No. .

This Consent is dated this day of , 20 .

SURETY:

BY: (SEAL)

Authorized Signature

-OR-

BY: (SEAL)

As Attorney in Fact (Attach Power of Attorney)

Printed Name

STATE OF FLORIDA

COUNTY OF HILLSBOROUGH

The foregoing instrument was acknowledged before me by means of physical presence or online notarization this ___ day of ____________, 20___, __________________________ by (Name of person) ________________________ for _________________________________________________.

(ie. Officer, attorney in fact) (Name of party on behalf of whom instrument was executed.)

(Signature of Notary Public) (Print, Type, or Stamp Name of Notary Public)

Personally Know OR Produced Identification

Type of Identification Produced __________________

File details come from the government source that posted it. Updated .