- Seminole County Utilities Department is requesting bids for inspection, cleaning, evaluation, and repair services for water storage tanks and contact chambers across multiple plant sites, with bids due June 24, 2026. The scope encompasses on-site visual inspections of concrete and steel tanks using manual and robotic methods, covering both interior and exterior surfaces. Specific service deliverables and technical requirements are detailed in the attached Drawings.pdf, FEMA_Requirements.pdf, and...
- Seminole County Board of County Commissioners is requesting bids on installation of five new 16-inch valves on an existing PVC force main and a new 12-inch electromagnetic flow meter assembly in Lake Mary under IFB Project CC-7172-26/HSM, with bids due June 17, 2026 at 2:00 p.m. and a mandatory pre-proposal meeting on May 26, 2026 at 9:00 a.m. The County seeks a General Contractor and/or Certified Underground Utilities Contractor fully licensed and certified in Florida at the time of bid...
- The Board of County Commissioners of Okaloosa County, Florida is soliciting bids for roof restoration and repairs at the Rigdon Center, 1958 Lewis Turner Boulevard, Fort Walton Beach, under ITB FM 64-26, with proposals due July 15, 2026. The scope covers fluid-applied waterproofing membrane systems with polyurethane resin and synthetic rubber cold-applied coatings across three roof areas: the Foyer (3,200 square feet), Doolittle sections A1 and A2 (17,500 square feet), and Bowlegs Bathrooms area...
- The City of Huntsville, Texas is requesting sealed bids for the restoration and recoating of a half-million-gallon welded steel potable water storage tank located at 3391 Autumn Road under Bid NO. 26-28, with bids due July 14, 2026 at 2:00 p.m. Central Time and a mandatory site visit on June 24 at 10:00 a.m. The scope includes complete interior and exterior protective coating system replacement, minor structural repairs, and tank disinfection. Interior work requires abrasive blast cleaning to...
- The Palm Beach County Board of County Commissioners, Facilities Development and Operations Department is requesting bids for cooling tower water line replacement at the Convention Center, with bids now due June 25, 2026 at 2:00 p.m. (extended from June 11 via Addendum 2 issued June 10). Prospective bidders must acknowledge receipt of both Addendum 1 (June 2) and Addendum 2 (June 10) and attach signed acknowledgments to their bid proposals or face disqualification. An SBE (Small Business...
The Board of County Commissioners of Okaloosa County, Florida, is soliciting bids on design and construction of a new 750,000-gallon elevated potable water storage tank at Shoal River Ranch Water Reclamation Facility under ITB WS 54-26, with bids due July 15, 2026, at 3:00 PM CDT and a mandatory pre-bid conference on June 16, 2026, at 9:00 AM CDT. Bidders must be certified to do business in Florida, maintain a valid contractor's license under Chapter 489 of the Florida Statutes, provide a Certificate of Good Standing from the Florida Department of State, and comply with federal requirements including System for Award Management (SAM) registration, E-Verify employment verification, and debarment certifications. The engineer of record is Poly, Inc. The scope includes design, fabrication, and erection of a single pedestal elevated potable water storage tank with foundation, site work, yard piping with ductile iron components, check valves, control valves, hydrants, and restraints; overflow discharge system; concrete pad at tank door; site clearing, grubbing, and erosion control; electrical systems including power distribution, lighting, grounding, and conduit sleeves for future SCADA connections; and 976 linear feet of chain link fencing with gates and barbed wire as an additive alternate. Foundation design requires auger cast in place (ACIP) piling with pile tips at 82 feet below existing grade. All work must comply with AWWA D100-21 standards, ACI concrete standards, National Electric Code, OSHA requirements, and the Trench Safety Act. Substantial completion is required within 500 calendar days after contract commencement; full completion within 560 calendar days. A deductive alternate allows bidders to propose a 500,000-gallon tank instead of 750,000 gallons. The contract will be awarded to the lowest responsive and responsible bidder. A 5 percent bid bond is required. Performance and payment bonds equal to the contract price are mandatory. Progress payments are made at 95 percent of work completed with 5 percent retainage; upon substantial completion, payment increases to 100 percent less an amount equal to 200 percent of the engineer's estimate of remaining work. Liquidated damages range from $904 per calendar day for contracts under $300,000 to $5,021 per calendar day for amounts exceeding $10 million. A five-year warranty covers all defects in materials, equipment, and labor. Questions are due July 9, 2026, at 12:00 PM CDT.