Sharon Hill Borough - Alleyway Repaving Project
Closed State & local contract opportunity Posted
- Solicitation number
- Sharon Hill Borough, Delaware County
- State
- Pennsylvania
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
Opportunity details come from pennbid.bonfirehub.com. Updated .
About this opportunity
Sharon Hill Borough is soliciting sealed bids for milling, base repair, and overlay of selected alleyways throughout the municipality, with bids due August 26, 2026 at 10:00 a.m. via the PennBid Service and digital bid opening. This is a Pennsylvania prevailing wage project, requiring application of Pennsylvania Prevailing Wage Rates throughout contract performance.
The base bid scope covers milling at 1-inch depth, 6 inches of base course repair (200 tons), and 1-inch overlay on five alleyways (High Street West and East, Between Frances and Foster, Between Frances and Florence, and Between Florence and Clifton) totaling approximately 3,108 linear feet at 16 feet wide, inclusive of associated repairs and drainage work. An add alternate option includes four additional alleyways (Between Burnside and Barker, East of Greenwood, Between Greenwood and Laurel, and Between Laurel and Cherry) totaling approximately 3,272 linear feet with 6 inches of base course (150 tons). All work must comply with PennDOT specifications (Publication 408/2020, as amended).
Each bid must be submitted online and accompanied by a certified check or bid bond equal to at least 10 percent of the total bid amount. Required bid submittals include the bid form, anti-collusion affidavit, workmen's compensation affidavit, bidder qualifications statement, Act 127 employment verification form, consent of surety, nondiscrimination certifications, and acknowledgment of addenda. Award will be made to the lowest responsible bidder as determined by Borough Council, the Engineer, and the Solicitor. The successful bidder is responsible for PennBid service fees of 0.003333 percent of the contract award value, ranging from $100 to $5,000. Within 10 calendar days of notice of award, the contractor must execute contract documents and obtain a notice to proceed before commencing work. The contractor must furnish performance and payment bonds, maintain comprehensive insurance, and comply with OSHA standards and applicable federal and state labor laws, including the Public Works Employment Verification Act and the Public Works Contractors' Bond Law of 1967.
Opportunity text
Notice of Advertisement of Bids Project Name - SHARON HILL BOROUGH ALLEYWAY REPAVING PROJECT Sealed bids will be received, opened and considered by SHARON HILL Borough on August 26, 2026 at 10:00 via the PennBid Service. The bid results will be opened digitally on-line. Plans, specifications, information for the bidders and forms for proposals may be obtained or examined on-line via the PennBid Service. This project is Sharon Hill Borough Alleyway Repaving Project. There is no fee to download and review the project materials. The awarded bidder is responsible for all fees due to the PennBid service. SHARON HILL Borough is soliciting bids for the milling, base repair and overlay of selected alleyways throughout the Borough. There is no physical public bid opening for this project, bids will be revealed via the PennBid website. All Bidding Documents are available online at no cost at www.PennBid.net. The successful bidder who is awarded the contract, will be required to pay "PennBid" a fee of 0.003333% or $100-$5,000 of the contract award value. Each bid must be submitted online and must be accompanied by a certified check or bid bond equal to at least ten (10) percent of the total bid. Pennsylvania Prevailing Wage Rates are to be used during this contract. Borough Council reserves the right to accept or reject any or all proposals, or parts thereof, and to waive any informality in the bidding, as they deem in the best interest of the Borough. Award of Contract will be to the lowest responsible bidder, but the Owner reserves the unqualified right to reject any or all bids and to waive any informalities. This is a Prevailing Wage Project. By Joy Taylor SHARON HILL Borough Manager
Files
| File | Type | Posted |
|---|---|---|
| 2-2098.13- Location Map.pdf | ||
| 3-2098.13 - Prev Wage.pdf | ||
| 1-2098.13 - Alleyway Repaving Project.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity