Seven Springs Water Treatment Plant Pressure Filter Replacement
Closed State & local contract opportunity Posted
- Solicitation number
- PSP29-0-2026/RM
- State
- Florida
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Raymond McCloskey raymond.mccloskey@fgua.com (407) 629-6900
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Florida Governmental Utility Authority is requesting qualifications for a Design-Build replacement of pressure filters #1 through #5 at the Seven Springs Water Treatment Plant in Pasco County, Florida, with proposals due July 29, 2026 at 2:00 p.m. EDT.
The scope is replacement of five pressure filters and associated piping, valves, controls, and appurtenances within the existing facility while maintaining continuous plant operations. The project aims to improve treatment reliability and ensure compliance with drinking water standards. This is a complete Design-Build delivery model, requiring the selected firm to integrate design and construction capability.
The RFQ was broadcast June 29, 2026. Addendum 1 has been issued. No pre-bid conference is scheduled. Thirty plan holders had registered as of the document date, including BidPrime, C&B Civil Construction, Inc., C&T Contracting Services LLC, Calgon Carbon Corporation, and Continental Carbon Group. No bid bond is required. The solicitation is administered through DemandStar via electronic bidding; no physical plan or blueprint components are available.
The source does not state an estimated contract value, contract term, set-asides or preference programs, evaluation criteria, or funding source.
Opportunity text
This Project will replace pressure filters #1 through #5 at the Seven Springs Water Treatment Plant in Pasco County, Florida to improve treatment reliability and ensure compliance with drinking water standards. Improvements will include installation of new pressure filters and associated piping, valves, controls, and appurtenances, delivered as a complete Design-Build project within the existing facility while maintaining continuous plant operations.
Files
| File | Type | Posted |
|---|---|---|
| Seven Springs Water Treatment Plant Pressure Filter Replacement.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity