Second Call; Crane Creek M-1 Canal Restoration

Closed State & local contract opportunity Posted

Solicitation number
ITB-03162
State
Florida
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from vendor.myfloridamarketplace.com. Updated .

About this opportunity

This is a state and local contracting opportunity issued by the St. Johns River Water Management District for the Crane Creek M-1 Canal Flow Restoration project in Brevard County, Florida. The Work consists of constructing six primary project elements, including an operable control structure, two stormwater pumping stations, sections of 24-inch stormwater force main, and a stormwater treatment area. The project aims to restore flow in the M-1 Canal. The contract term runs through December 31, 2024, with a possible extension. Bids are due by 2:00 p.m. on December 1, 2022, and a mandatory pre-bid conference is scheduled for November 15, 2022. The District will award the contract to the lowest responsive, responsible bidder. The engineer's construction estimate for the project is $19,823,000, and funding will be provided over three fiscal years.

The procurement does not appear to have any set-aside designations or restrictions on the types of organizations that can respond. No incumbent vendors or current contractors are listed. The District reserves the right to increase, decrease, or delete any work item. Respondents must meet minimum qualifications for similar projects, licenses, bonds and surety, and key personnel.

Opportunity text

The Work of this Project consists of the construction of six primary project elements:

  1. An operable control structure within the M-1 Canal east of Evans Road, including pneumatic crest gates (weirs), concrete hardened flow channel, flow channel center dividing wall, flow attenuation blocks, foundations, rip rap, mechanical equipment, power supply and equipment, concrete slabs, instrumentation and controls, paving, grading, and other incidental work.
  2. A stormwater pumping station, located east of I-95 adjacent to the M-1 Canal along Coastal Lane. Work includes intake structure and screens, intake piping and manholes, concrete wetwells, pumps, discharge piping, valves, pipe supports, power supply and equipment, concrete slabs and pavement, instrumentation and controls, paving, grading, and other incidental work.
  3. A stormwater pumping station, located west of the St. Johns Heritage Parkway. Work includes intake structure and screens, intake piping and manholes, concrete wetwell, pumps, discharge piping, valves, pipe supports, power supply and equipment, concrete slabs and pavement, instrumentation and controls, paving, grading, and other incidental work.
  4. A section of 24-inch-diameter underground high-density polyethylene (HDPE) stormwater force main from the east pump stations to the STA. Installation by horizontal directional drilling and open-cut trenching, valves, fittings, surface restoration, plantings to restore temporary construction easements and other project areas, a precast outfall structure into the STA, and other incidental work.
  5. A section of 24-inch-diameter underground high-density polyethylene (HDPE) stormwater force main from the west pump station. Installation by horizontal directional drilling and open-cut trenching, valves, fittings, surface restoration, plantings to restore temporary construction easements and other project areas, an outfall structure north of 192, and other incidental work.
  6. A stormwater treatment area (STA) west of the St. Johns Heritage Parkway. The STA will include earthwork for regrading slopes of an existing borrow pit, an access road, and other incidental work.