SB001-27 Demolition of 225 Langley Drive
Closed State & local contract opportunity Posted
- Solicitation number
- PE-66751-NONST-2027-000000097
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP code
- Point of contact
-
- Chris Duncan chris.duncan@lawrencevillega.org (678) 407-6421
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Lawrenceville, Georgia is requesting sealed bids for demolition of a commercial property at 225 Langley Drive under solicitation SB001-27, with bids due July 30, 2026 and a mandatory pre-bid conference and site visit on July 7, 2026. Qualified bidders must demonstrate at least three similar contracts within the past five years with original contract prices of no less than $150,000, prior underground storage tank (UST) system removal experience, and a valid Georgia Asbestos Abatement License.
The scope encompasses complete demolition and removal of a 4,000-square-foot convenience store building (formerly Chevron Food Mart), metal fueling canopy, paved parking areas (except the entrance/driveway apron), and all site features including four USTs, above-ground storage tanks, fuel dispenser islands, grease trap, dumpster enclosure, and landscaping. Contractor must secure the perimeter per International Building Code, install erosion control and stormwater inlet protection, grade and compact disturbed areas with approximately 1% slope, apply seed and straw, place concrete bin blocks at driveways, and dispose of or recycle all debris per Georgia Comprehensive Solid Waste Management Act and Chapter 391-3-4 rules. The work must be substantially completed within 30 consecutive calendar days from the written Notice to Proceed; liquidated damages of $500 per day apply for delays beyond this period.
Contractor must provide a 5% bid bond with submission and 100% payment and performance bonds from surety companies rated A-5 or better by AM Best. Insurance requirements include statutory workers' compensation, $1,000,000 commercial general liability per occurrence, $500,000 auto liability, and $1,000,000 umbrella liability. Contract award goes to the lowest responsive and responsible bidder. Questions are due by 3:00 p.m. on July 10, 2026 to Steve Murray, Purchasing Director, at chris.duncan@lawrencevillega.org or 678-407-6420. The City retains the right to reject any or all bids and to negotiate with the lowest responsive, responsible bidder.
Opportunity text
The work to be performed by the Contractor consists of but is not limited to the following major items: 1. Secure the perimeter following International Building Code. Install erosion control measurements around jobsite including protection of stormwater intlets at all times. 2. All building structures and site features, including but not limited to floor slabs, drains, lifts, concrete sidewalks/footpaths, septic tanks (if any), debris, drums, containers, used aboveground storage tanks (ASTs), signs, junk, trash, the convenience store building, underground storage tanks (USTs), fueling canopy, fuel dispenser islands, dumpster enclosure and pads, grease trap, utility appurtenances, foundations, underground structures, trees, shrubs, and any other abandoned site features located inside or outside the main building area, shall be completely demolished and removed from the site. The existing concrete parking lot shall be demolished and removed, with the exception of the existing concrete entrance/driveway apron, which shall remain in place. (Refer to the site plan for the limits of demolition). 3. Disturbed area must be graded, backfilled & compacted, sloped in such a manner that the site does not retain water (around 1% grade). Seed and Straw must be applied after site disturbance. (Refer to site plan) 4. Once demolition is completed, Contractor should place concrete bin blocks at driveways. 5. All demolition debris must be removed and disposed of properly in an appropriate landfill or recycled in accordance with the provisions of the Georgia Comprehensive Solid Waste Management Act of 1990 and the Georgia Rules for Solid Waste Management Chapter 391-3-4. 6. See additional information in the Site Plan and Phase I Environmental Assessment report.
Files
| File | Type | Posted |
|---|---|---|
| SB001_27 Inv Final.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity