Santa Cruz Wharf South Landing Engineering Services

Open State & local contract opportunity Posted

Solicitation number
RFQ No. Parks and Recreation -0335
State
California
Responses due

Opportunity facts

UNSPSC codes
Show all 19
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

The City of Santa Cruz, California, is soliciting qualifications for an engineer to prepare concept and final engineering plans for the Santa Cruz Wharf South Landing, with a mandatory pre-submittal site inspection on November 30, 2026 and responses due December 15, 2026 at 1:30 p.m. The City Parks and Recreation Department issued the RFQ, which covers design and construction-phase engineering for a fixed maritime platform and access ramp that will accommodate transient vessel mooring for vessels up to 200 tons and approximately 120 feet in length.

Scope includes three alternative concept designs, a 15% completion plan set, wave analysis and hydrodynamic modeling, 50% and 100% completion plan sets, specifications in Construction Specifications Institute format, engineer's cost estimates, project scheduling, and bid support. Construction-phase work includes site visits, submittal reviews, and as-built documentation. Minimum qualifications require a California Professional Engineer (Civil) license, expertise in coastal structures design, hydrodynamic analysis, marine structural engineering, and berthing and mooring analysis, and demonstrated similar experience within the last five years. The engineer must carry professional liability insurance of $2,000,000 per occurrence and $2,000,000 aggregate, commercial general liability of $1,000,000 per occurrence and $2,000,000 aggregate, and automobile liability of $1,000,000.

Engineer fees must be submitted as fixed-price, lump-sum compensation tied to task milestones, in a separately sealed envelope. Proposals are scored on responsiveness and completeness (15 points), engineer and consultant qualifications and experience (75 points), references (5 points), and project schedule (5 points), for 100 points total. The City will open the highest-ranked engineer's fee proposal to confirm it does not exceed the project budget. If it does, the City reserves the right to negotiate with the first-ranked engineer or proceed to the second- or third-ranked firms.

The anticipated timeline sets engineer selection for January 5, 2027, contract execution by January 11, 2027, and notice to proceed by January 18, 2027. Concept designs and 15% plans are due February 15, 2027, and 100% plans and specifications by March 31, 2027. Construction is anticipated to be completed by no later than 2034.

Opportunity text

The City of Santa Cruz (City) is issuing this Request for Qualifications (RFQ) dated Nov. 16, 2026 for an Engineer (Engineer) to prepare concept and final engineering plans and specifications for the construction of the Santa Cruz Wharf South Landing.