SC_Wharf_South_Landing_Engineering_RFQ_FINAL_16Nov2026.pdf

PDF 9 MB Posted

Attached to
Santa Cruz Wharf South Landing Engineering Services
Solicitation number
RFQ No. Parks and Recreation -0335
Issued by
Santa Cruz County, San Francisco City, California

About this file

Request for Qualifications Summary

This Request for Qualifications (RFQ) document is issued by the City of Santa Cruz Parks and Recreation Department for engineering services to design the Santa Cruz Wharf South Landing. The City seeks a qualified engineer to prepare concept designs, engineering plans, specifications, and construction support for a fixed maritime platform and access ramp facility designed to accommodate transient vessel mooring for vessels up to 200 tons and approximately 120 feet in length. The project scope includes three alternative concept designs, a 15% completion level plan set, wave analysis and hydrodynamic modeling, 50% and 100% completion level plan sets, project specifications in Construction Specifications Institute format, engineer's cost estimates, project scheduling, bid support services, construction phase engineering support with site visits and submittal reviews, and as-built documentation. RFQ responses are due December 15, 2026 at 1:30 PM, with a mandatory pre-submittal site inspection scheduled for November 30, 2026. The engineer selection is anticipated for January 5, 2027, with contract execution by January 11, 2027 and notice to proceed by January 18, 2027. The anticipated project schedule requires concept designs and 15% completion plans by February 15, 2027, with final 100% completion plans and specifications by March 31, 2027. Construction is anticipated to be completed by no later than 2034.

Engineer's fees must be submitted as fixed price/lump sum compensation based on specific task milestones in a separately sealed envelope. The evaluation committee will rank proposals based on responsiveness and completeness (15 points), engineer and consultant qualifications and experience (75 points), references (5 points), and project schedule (5 points), for a total of 100 points. The City will open the highest-ranked engineer's fee proposal to confirm it does not exceed the project budget; if it does, the City reserves the right to negotiate with the first-ranked engineer or proceed to negotiate with the second- or third-ranked engineers as needed. Minimum qualifications require California Professional Engineer (Civil) licensure, expertise in coastal structures design, hydrodynamic analysis, marine structural engineering, berthing and mooring analysis, and demonstrated experience performing similar services within the last five years. The engineer must carry professional liability insurance of $2,000,000 per occurrence and $2,000,000 aggregate, commercial general liability of $1,000,000 per occurrence and $2,000,000 aggregate, and automobile liability of $1,000,000. No specific set-asides are identified in this solicitation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PARKS AND RECREATION DEPARTMENT

337 CHURCH STREET, SANTA CRUZ, CA 95060 ● 831-420-5150 ● www.santacruzca.gov

Santa Cruz Wharf South Landing

Request for Qualifications

And Proposal

For Engineering Services

Concept imagery for the Santa Cruz Wharf South Landing

RFQ Responses Due: Dec. 15, 2026 at 1:30 PM

(see Section F for Submittal details)

SANTA CRUZ WHARF SOUTH LANDING

REQUEST FOR QUALIFICATIONS

AND

PROPOSALS

FOR

ENGINEERING SERVICES

The City of Santa Cruz (City) is issuing this Request for Qualifications (RFQ) dated Nov. 16, 2026 for an Engineer (Engineer) to prepare concept and final engineering plans and specifications for the construction of the Santa Cruz Wharf South Landing.

This RFQ is organized into the following sections:

A. Project Overview B. Engineer Scope of Services C. Project Schedule D. Minimum Qualifications for RFQ Submittal E. Organization of RFQ Submittal F. RFQ Submittal Instructions G. Selection Process H. Contract Award I. Clarifications to RFQ J. Terms and Conditions K. Exhibits

A. Project Overview

The 2014 Santa Cruz Wharf Master Plan (WMP) as revised and approved in 2024 envisions the construction of the Santa Cruz Wharf South Landing (Project) located at the seaward end of the Santa Cruz Wharf between Bents 148-169. The City intends to immediately proceed with planning, environmental review, and permit application for the Project, and complete construction by no later than 2034.

As described in the WMP, the South Landing:

“…includes a 20-foot wide, 75-foot long fixed platform and an approximately 200-foot long, 12-foot wide access ramp…”

“…will be designed to provide for the transient mooring of vessels up to 200 tons and approximately 120 feet in length. It is anticipated that this landing will provide temporary mooring for whale watching, bay cruises, fishing, and educational and scientific research vessels, including those of the National Marine Sanctuary, the Monterey Bay Aquarium, Moss Landing, and UCSC. The facility can also provide landings for public use and emergency evacuation. However, it will not serve as a terminus for ocean liner type cruise ships of any tonnage nor to provide moorings for extended periods of time nor to provide shuttle access for overnight or long-haul ocean going cruise ships of any size.”

“The 1,500 square foot fixed landing will be supported by six bents with three piles each for a total of 18 piles. Two 6-inch by 12-inch dimensional lumber beams will be provided at each bent line and will be bolted to both sides of the piles supporting the landing. The beams will also extend to tie into the first pile of the adjacent East Promenade for stability. Four by twelve inch stringers at 18 inches on center would be utilized to span between the beams.

“The piles along the waterside face of the landing will be extended above the platform to act as fender piles, cushioning vessels on approach.”

“Additional freestanding piles will be added on either side and in line with the face of the landing to facilitate guiding vessels to the landing. Mooring cleats located on the platform will provide anchorage for tie lines from the vessels at the berth. Vessels will approach the landing from the north into the prevailing wind, and will tie up from the starboard side of the vessel.”

“The elevation of the landing would be at +9 MLLW, in order to be above the high tide yet low enough to minimize the difference in heights between the landing and boat deck. In order to allow for tidal variation and some variation in the freeboard of the vessels, a 5-foot wide and 35-foot long aluminum gangway would be installed on the outboard edge of the landing. The gangway would be hinged on one end to the platform and on the other end to a landing which can be lifted or lowered by cables from a gantry. This will allow for a connection to the deck of vessels with different freeboards and at different tidal elevations. It is assumed that the range of the deck elevations that can be accommodated will be limited to 3 feet below or 3 feet above the platform elevation.”

“The platform of the landing will be located between Bents 148 and 153 and will be connected to the 12-foot wide approximately 200-foot long access ramp from an extension of the new East Promenade between Bents 167 and 169. The access ramp will be designed to ADA standards and therefore will be comprised of seven ramp segments with a maximum 1:12 slope and maximum 30-foot length and with six 5-foot wide level landings in between. Four piles bolted together with 6 by 12 inch beams will support each of the landings and be braced and tied back to the adjacent promenade piles for lateral support. Six by twelve inch stringers at 18 inches on center would be utilized to form the sloped ramp between each of the landings as well as the landings themselves.”

On the access ramps and landings, both guardrails and handrails will be required. On the platform, guardrails and other approved sea lion deterrent devices will also be provided. The guardrails will use a minimalistic stainless steel structure with mesh. A gate will be provided at the top of the access ramps so that the access ramp can be closed off to the public when required. Lighting will be provided on the ramps and platform so that access after dark can be accommodated if desired.”

The above description of South Landing design concepts from the WMP is intended to inform the responses to this RFQ. Concepts generated by respondent Engineers should incorporate these design elements, yet also provide creative variations and approaches.

B. Engineer Scope of Services

Task 1 Concept Designs and 15% Completion Level Plan Set – Refine/develop the concept from the Wharf Master Plan.

1.1 Concept Level Drawings - Prepare three alternative concept designs to allow various size transient vessels limited to more than 200 tons to embark and disembark passengers and limited equipment. Provide a minimum of one sheet per alternative concept showing basic design elements in plan and elevation view.

1.2 Meet with City to review concept designs and discuss advantages and disadvantages of each; assist City in its selection of its preferred concept.

1.3 15% Completion Level Plan Set - Upon selection by City of its preferred alternative concept, prepare a 15% Completion Level Plan Set consisting of a minimum of 2-3 sheets depicting the South Landing in plan and elevation view, along with details that describe the components and configuration of the South Landing (gangway, ramp, crane, etc). These drawings shall be of sufficient detail to allow development of estimated costs for the construction of the South Landing.

Task 1 Deliverables:

Concept Level Drawings – Provide one complete set in a digital .pdf format.

15% Completion Level Plan Set - Provide one complete set in a digital .pdf format.

Task 2 Wave Analysis and Report – Informs the final design of City’s preferred alternative concept resulting in a 50% and 100% Completion Level Plan set.

2.1 Conduct a Wave Analysis to establish the 1% annual chance (100-year) design wave conditions at the Santa Cruz Wharf.

2.2 Analyze historical wave data using available National Data Buoy Center (NDBC) wave buoy directional data to determine the 1% annual chance (100-year) swell and wind-wave conditions by direction.

Construct and utilize a numerical wave model to transform the offshore wave data and map the wave height variation across Monterey Bay to the Santa Cruz shoreline.

The purpose of the wave transformation analysis is to determine changes in the wave field attributed to wave shoaling, reflection, diffraction, refraction, attenuation, and wave focusing effects. The wave height variation will be expressed in terms of the:

1) significant wave height; and

2) maximum wave height.

The significant wave height is defined as the average of the one-third of the largest waves in the wave spectrum and is close to what a visual observer would estimate as the average wave height. The significant wave height forms one of the base parameters commonly used for coastal engineering analysis and assessment of loads imparted to structures in the marine environment.

The maximum wave height provides a physical upper limit to the elevation of the highest wave crests and is utilized to determine the maximum water surface elevation above which to locate wharf structures to prevent wave impact and overtopping. The wave height variation is dependent on the water depth and variation of the seabed topography and submarine canyon in Monterey Bay.

2.3 Review available bathymetric surveys to determine the elevation of the seabed in the bay and along the Wharf. Analyze data from available tide gauges, such as NOAA Station: 9413450 at Monterey, to establish the design water level comprised of storm surge and tide level that would pair with a 1% annual chance wave event.

Additional factors that can affect water levels (and water depth) include El Niño effects and Sea Level Rise (SLR), which shall also be considered in the wave analysis. SLR scenarios will be based on the California Ocean Protection Council (OPC) State of California SLR Guidance 2024 Science & Policy Update.

2.4 Summarize the basis and findings of the Wave Analysis in a Wave Study Report presented in terms of text, figures, tables, and maps. The Wave Study Report will be provided in draft form for review, followed by a final submittal that incorporates review comments received.

Task 2 Deliverables:

Provide Wave Study Report draft and final version in digital .pdf format.

Task 3 50% Completion Level Plan Set

3.1 Prepare a 50% Completion Level Plan Set for City’s review and use in conducting environmental review and applying for regulatory permits from agencies such as the US Army Corp of Engineers, the National Oceanic and Atmospheric Administration, the US Fish and Wildlife Service, the California Coastal Commission, and the Central Coast Regional Water Quality Control Board. City will provide comments for Engineer’s use in preparing the 100% Completion Level Plan Set.

Task 3 Deliverables:

Provide one complete set in digital .pdf format.

Task 4 100% Completion Level Plan Set and Project Specifications

4.1 Prepare 100% Completion Level Plan Set - The 100% Completion Level Plan Set shall be signed by Engineer and suitable for use by City in a public solicitation for competitive bids for the Project. Comments received from City after its review of the 50% Completion Level Plan Set shall be included in the final 100% Completion Level Plan Set.

4.2 Prepare Project Specifications – The Project Specifications shall be signed by

Engineer and suitable for use by City in a public solicitation for competitive bids for the Project. Project Specifications shall:

i. Be provided in the Construction Specifications Institute (CSI) division format.

ii. Sufficiently describe the quality and quantity of the scope of work, the products to be used, requirements applicable to contractors’ performance of the work, and codes applicable to the construction of the Project

iii. Include product submittal sheets, material safety data sheets (MSDS), and other information required for the successful completion of the Project.

Task 4 Deliverables:

Provide one complete set of plans and specifications in digital .pdf format.

Provide one complete set of plans in AutoCAD or similar format.

Task 5 Engineer’s Cost Estimate

5.1 Prepare an Engineer’s Cost Estimate for the probable cost to construct the Project as shown at the 15% and 100% Completion Level Plan Sets levels.

Task 5 Deliverables:

Provide Engineer’s Cost Estimate for the 15% Completion Level Plan Set in digital

.pdf format.

Provide Engineer’s Cost Estimate for the 100% Completion Level Plan Set and

Project Specifications in digital .pdf format.

Task 6 Project Schedule

6.1 Prepare an estimated Project Schedule for construction based on the 100%

Completion Level Plan and Project Specifications.

Task 6 Deliverables:

Provide Estimated Project Schedule in digital .pdf format.

Task 7 Bid Support

7.1 Respond in writing to the City on technical questions concerning the Project 100%

Completion Level Plan Set, Project Specifications, and construction methods posed by the City or bidding contractors during the bidding period. Assist City if necessary in formulating addenda to the Project Bid Package.

7.2 Review all bids received by City and submit an opinion as to the cost reasonableness of the lowest, most responsive, and responsible bidder.

7.3 Review qualifications and experience submitted by bidders and provide a ranking of bidders from most- to least-qualified on similar projects for City’s use in identifying the most qualified bidder.

Task 7 Deliverables:

Provide Responses to questions during the bidding period in digital .pdf format.

Provide Cost Reasonableness Opinion in digital .pdf format.

Provide ranking of bidders’ qualifications and experience in digital .pdf format.

Task 8 Engineering Support During Construction - Engineer will be a representative of City during the Engineering Support phase and will advise and consult with City. Engineer will have authority to act on behalf of City only to the extent herein and the agreement between City and Engineer for Engineer’s services. The extent of the duties, responsibilities, and limitations of authority of Engineer as City’s representative during construction will not be modified without written consent of City and Engineer. Engineer’s Engineering Support duties, responsibilities, and limitations of authority will not be restricted, modified, or extended without the written consent of City and Engineer. Consistent with the foregoing, prior to direction being given by Engineer to any contractor or vendor, Engineer will first advise City of its intended advice, opinions and directions and obtain City’s prior approval.

Engineer shall interpret the requirements of the 100% Completion Level Plan Set and Project

Specifications in writing and shall convey such determination to City upon request of City.

Engineer will render interpretations necessary for the proper execution or progress of the Project work with reasonable promptness. Engineer will render written decisions, within a reasonable time, on all claims, disputes and other matters in question between City and the contractor relating to the execution of the Project work or the interpretation of the Plan Set and Project Specifications. Engineer's response to such request will be made within five (5) business days.

Interpretations and decisions of Engineer must be consistent with the intent of and reasonably inferable from the 100% Completion Level Plan Set and Project Specifications and must be in writing or in graphic form.

8.1 Respond to Requests for Information (RFI) – Engineer shall respond to Requests for

Information (RFI) submitted by City or contractor as required to explain or interpret the 100% Completion Level Plan Set and Project Specifications. Engineer will answer all RFIs, in writing, generated by the City or contractor within five (5) business days of receipt of such requests for information unless additional reasonable time is necessary in which case Engineer shall notify the City.

8.2 Respond to Submittals – Review, comment, and approve contractor Submittals as forwarded by City to Engineer including but not limited to crane path of travel, mat design, staging and traffic control, demolition work plan, crane positioning and sequencing plan, pile driving work plan, shoring plans, and shop drawings; assume fifteen submittals. Engineer shall review and approve or take other appropriate action within five (5) business days after Engineer's receipt of a submittal (e.g., shop drawings, product data and samples) for the purpose of checking for general conformance with information given and the design concept expressed in the 100% Completion Level Plan Set and Project Specifications to determine whether or not the Project work will be in general compliance with the requirements of the 100% Completion Level Plan Set and Project Specifications. Engineer’s actions will be taken in accordance with the time frame specified above in this section so as to not cause delay in the Project work or the construction of the Project, while allowing sufficient time in Engineer's professional judgment to permit adequate review.

Engineer's review will not constitute approval of safety precautions or, unless otherwise specifically stated by Engineer, of construction means, methods, techniques, sequences, or procedures. Engineer’s review of a specific item will not indicate an approval of an assembly in which the item is a component. When professional certification of performance characteristics of materials, systems, or equipment is required by the 100% Completion Level Plan Set and Project Specifications, Engineer will be entitled to rely upon such certification to establish that the materials, systems, or equipment will meet the performance criteria required by the 100% Completion Level Plan Set and Project Specifications. If professional design services or certifications by a design professional related to systems, materials, or equipment are specifically required by the 100% Completion Level Plan Set and Project Specifications, then Engineer will specify appropriate performance and design criteria that such services must satisfy. Shop Drawings and other submittals related to the Project work designed or certified by a design professional will bear such professional’s written approval when submitted to the Engineer. Engineer will be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals.

8.3 Conduct Site Visits – Engineer shall visit the Project site to become familiar with the progress, acceptability, and quality of the Project work and to determine if the Project work is proceeding in accordance with the 100% Completion Level Plans and Project Specifications. On the basis of such site visits Engineer shall keep City informed of the progress, acceptability, and quality of the Project work, and will endeavor to guard City against defects and deficiencies in the Project work.

Engineer shall at all times have access to the Project work in preparation or progress.

Engineer or its consultants will review, stamp, and sign in a timely manner all documents requiring approval or for which Engineer or its consultants are responsible.

Engineer will not have control over, or charge of, and will not be responsible for construction means, methods, techniques, sequences, or procedures, or for safety precautions and programs in connection with the Project work, unless expressly specified in the Plan Set and Project Specifications by Engineer or its consultants.

Two visits shall be performed at reasonable intervals after contractor mobilization and prior to Substantial Completion. A third visit shall be for the purpose of identifying items requiring correction and issuing a Punch List. A final visit will be performed to confirm satisfactory completion of the Punch List and to certify satisfactory completion of all work on the Project in compliance with the Plans and Specifications.

Engineer shall provide site visit reports within five (5) business days subsequent to a site visit, or sooner if such information to be transmitted is of substantial and immediate importance. Engineer will issue reports to City related to deficiencies, errors, non-adherence to schedules, disagreements with pricing or time requests on change orders, and other items of importance that Engineer observes during construction.

8.4 Review and Approve Change Orders – Engineer shall review for scope and cost reasonableness, approve, and co-sign with City all Contractor change order requests.

Engineer will respond to all requests for construction change orders within five (5) business days. Engineer will review all change orders resulting from ambiguities, conflicts, errors, or omissions in the 100% Completion Level Plan Set and Project Specifications, as well as all change order reviews for matters not in any way related to deficiencies in the 100% Completion Level Plan Set and Project Specifications.

Engineer will review submitted change orders and render an opinion as to the inclusion or omission from the scope of work covered in the 100% Completion Level Plan Set and Project Specifications and as to the validity and reasonableness of the change order cost estimates.

8.5 Review and Approve Requests for Payments – Engineer shall review contractor payment requests for cost reasonableness, certify that payment requested conforms with work completed, and co-sign with City all contractor payment requests.

Engineer shall review and approve within five (5) business days contractor payment requests during the course of Project work and based on Engineer’s observations at the site and an evaluation of the payment request. Engineer’s approval of a payment request will constitute a representation by Engineer to City that, based on Engineer’s observations at the site as provided in the payment request that (1) the Work has progressed to the point indicated; (2) to the best of Engineer’s knowledge, information, and belief, the quality of Project work is in accordance with the 100% Completion Level Plan Set and Project Specifications (subject to an evaluation of the Project work for conformance with the 100% Completion Level Plan Set and Project Specifications upon Substantial Completion, to the results of any subsequent test required by or performed under the 100% Completion Level Plan Set and Project

Specifications, to minor deviations from the 100% Completion Level Plan Set and Project Specifications correctable prior to completion, and to any qualifications stated in the payment request); and (3) the contractor is entitled to payment in the amount certified.

8.6 Rejection of Work - Engineer shall report to City within five (5) business days or sooner if required by safety or schedule concerns any work that Engineer knows or suspects does not conform to the 100% Completion Level Plan Set and Project Specifications.

Engineer will have the authority to recommend to the City to reject work that does not conform to the 100% Completion Level Plan Set and Project Specifications; however, the decision to reject shall be the sole responsibility of the City. Whenever Engineer considers it necessary or advisable for implementation of the intent of the 100% Completion Level Plan Set and Project Specifications, Engineer will have the responsibility and authority to require additional inspection or testing of the Project work in accordance with the provisions of the 100% Completion Level Plan Set and Project Specifications, whether or not such work is fabricated, installed or completed;

provided, however, that Engineer must obtain City’s prior written approval of any such special inspection or testing. This authority, however, will not give rise to a duty or responsibility of Engineer to contractor, its subcontractors and their sub-subcontractors, material and equipment suppliers, agents or employees or other persons performing portions of the Project work.

8.7 Substantial Completion - Engineer shall conduct observations throughout construction of the Project to determine the date of Substantial Completion and shall issue a Certificate of Substantial Completion.

Engineer shall give notice in writing to City at least thirty (30) days prior to the date upon which Engineer anticipates the Project shall be Substantially Complete. During the fifteen (15) business day period after the delivery of the Certificate of Substantial Completion, City and Engineer shall meet on one or more occasions, if necessary, and tour to inspect and review the Project, as applicable, to determine whether it is Substantially Complete.

“Substantial Completion” means the time at which the Project work (or a specified part thereof) has progressed to the point where, in the opinion of City and Engineer, the Project work (or a specified part thereof) is sufficiently complete, in general accordance with the 100% Completion Level Plan Set and Project Specifications, so that the Project work (or a specified part thereof) can be utilized for its intended use.

The terms “substantially complete” and “substantially completed” as applied to all or part of the Project work refer to Substantial Completion thereof. Substantial Completion will be the date that a Certificate of Substantial Completion is issued as set forth above for the Project.

Engineer shall, upon Substantial Completion of the Project, represent and warrant to

City in writing the items set forth in i – iv below.

i. To the knowledge of Engineer, the Project has been completed in substantial accordance with the 100% Completion Level Plan Set and Project Specifications and is free from defects in workmanship and materials in connection with the construction thereof.

ii. Engineer has no knowledge of any structural defects, latent defects or building systems defects created by the Project.

iii. To the knowledge of Engineer, the Project has been constructed in accordance with all requirements of law, all permits, and all insurance laws, regulations and requirements in effect at the time of construction of the Project.

iv. To the best of Engineer’s knowledge, after due and diligent inquiry, all permits necessary for the construction, use and occupancy of the Project have been obtained and are in full force and effect.

Engineer will provide time as needed for punch lists, walkthroughs, and Project close-out. Engineer will provide written reports to City of Engineer’s observations. Promptly after issuing the Certificate of Substantial Completion but in no event exceeding three

(3) business days, City and Engineer shall participate in a job site walk of the Project to determine the status of completion. If City does not consider the Project substantially complete or City objects to Engineer’s Punch List, then City must notify Engineer in writing within five (5) business days of the job site walk giving all of City’s specific reasons that the Project is not substantially complete or the Punch List is inaccurate; if City does not provide written notice within such time, then City will be deemed to have no objection.

8.8 Punch List - Engineer shall, upon Substantial Completion of the Project, prepare and submit to City and contractor a Punch List to assure the Project work is completed as documented in the Construction Drawings and Project Specifications. Upon completion by contractor of items noted on the Punch List, Engineer shall reinspect items noted on the Punch List to determine the state of correction. Engineer shall issue a revised Punch List if necessary, noting additional corrective steps to be taken, and reinspect again to determine the state of correction.

8.9 Final Completion - When the Project has achieved Final Completion (all punch list items performed), Engineer shall issue a Certificate of Final Completion and the certificate of any other consultant or engineer under Engineer.

Task 8 Deliverables

Provide responses to RFIs (assume 10).

Provide responses to Submittals (assume 15).

Provide memos detailing findings and observations obtained during four Site Visits.

Provide approval of Change Orders (assume 6).

Provide approval of Payment Requests (assume 4).

Provide Notice of Rejected Work (as necessary).

Provide Engineer’s Certificate of Substantial Completion.

Provide Engineer’s Punch List.

Provide Engineer’s Certification of Final Completion.

Task 9 As-Built Drawings and Specifications upon Final Completion

9.1 Prepare As-Built Drawings of Record with input from contractor. Illustrate, locate, dimension, note or otherwise describe on one full-size set of drawings (As-Built Drawings) and specifications (Annotated Project Specifications) all deviations, corrections, deletions, additions, enhancements, expansions and/or clarifications of, from, or to the work initially prescribed or shown in the Project plans and specifications.

As-Built Drawings and the Annotated Project Specifications must illustrate and/or specify all changes ordered pursuant to Engineer directives, change orders, and authorized substitutions of specified items.

Require contractor to provide contractor’s As-Built Drawings and Annotated Project

Specifications, together with all additional information requested in order to prepare a set of final, reproducible As-Built drawings and Annotated Project Specifications for delivery to City.

Task 9 Deliverables:

Provide one complete set of As-Built Plans and Annotated Project Specifications in digital .pdf and AutoCAD or equal formats.

C. Project Schedule (anticipated)

1. RFQ Issued ................................................................................................ Nov. 16, 2026

2. Mandatory Pre-Submittal Site Inspection ................................................... Nov. 30, 2026

3. Last Date for Submittal of RFQ Questions or Clarifications ........... ........... Dec. 4, 2026

4. Last Date for City Response to RFQ Questions or Clarifications .............. Dec. 9, 2026

5. RFQ Due .................................................................................................... Dec. 15, 2026

6. Selection of Engineer ................................................................................. Jan. 5, 2027

7. Execution of City/Engineer Professional Services Agreement .................. Jan. 11, 2027

8. Notice to Proceed to Engineer ................................................................... Jan. 18, 2027

9. Concept Design and 15% Completion Level Plan Set Complete .............. Feb. 15, 2027

10. 50% Completion Level Plan Set Development Drawings Complete ......... Mar. 15, 2027

11. 100% Completion Level Plan Set and Project Specifications Complete .... Mar. 31, 2027

12. Construction Cost Estimate and Construction Schedule Complete ........... Apr. 15, 2027

13. Competitive Procurement for Construction Contractor .............................. TBD

14. Execution of City/Contractor Agreement .................................................... TBD

15. Notice to Proceed to Construction Contractor ........................................... TBD

16. Substantial Completion .............................................................................. TBD

17. Final Completion ........................................................................................ TBD

18. Engineer’s Certificate of Final Completion ................................................. TBD

Failure of an Engineer to attend the mandatory Pre-Submittal Site Inspection shall result in any proposal submitted by that Engineer being deemed non-responsive and will not be considered.

D. Minimum Qualifications for RFQ Submittal

Engineers responding to this RFQ must meet the following minimum qualifications:

1. Expertise in designing coastal structures, hydrodynamic analysis, and marine structural engineering.

2. Experience in berthing and mooring analysis for piers and wharves.

3. Capacity for the development of design alternatives, preparation of construction plans and specifications, and provision of bid and construction support.

4. Experience designing projects within the Monterey Bay National Marine Sanctuary.

5. Experience in the performance of services as detailed in the Engineer Scope of Services section of this RFQ within the last five (5) years.

6. Possession of a current and active Professional Engineer License (Civil) from the California

Board for Professional Engineers, Land Surveyors, and Geologists.

7. Access to consultants required to complete the Engineer Scope of Services.

Engineers who fail to meet the minimum qualifications set forth above should not submit a proposal;

any such proposal shall be deemed non-responsive and will not be considered.

E. Organization of RFQ Submittal

RFQ submittals shall be submitted utilizing the Engineer’s Proposal form provided in Exhibit A and following the format and headings shown below.

RFQ Submittals shall include, at a minimum, all the items below. Failure to do so may result in the submittal being deemed non-responsive.

Section 1 - Engineer and Consultant Information

Section 2 - Expertise in the Design of Coastal Structures, Hydrodynamic Analysis, and Marine

Structural Engineering

Section 3 - Expertise in Berthing and Mooring Analysis for Piers and Wharves

Section 4 - Capacity for the Development of Design Alternatives, Preparation of Construction

Plans and Specifications, and Provision of Bid and Construction Support

Section 5 - References

Section 6 - Projects Designed Within the Monterey Bay

Section 7 - Performance of Services Detailed in the Engineer Scope of Services

Section 8 - Current and Active and California Professional Engineer (Civil) License

Section 9 - Participation/Knowledge of Public Bid Process

Section 10 - Engineer’s Project Schedule

Section 11 - Engineer’s Fee Proposal (must be in a separate sealed envelope)

F. RFQ Submittal Instructions

Engineer shall read the entirety of the RFQ prior to submitting a proposal. Proposals shall be submitted based on information contained in the RFQ and any issued addenda. All submitted proposals must be completed in ink, must contain required documents and must be sealed. No proposal will be accepted that is incomplete, written in pencil, altered, illegible or contains unrequested alternates. All documents must be filled out completely and signed where indicated.

The City is not responsible for proposals sent through the mail or delivered to an address other than the one listed below.

All proposals must be received at the Parks and Recreation Department, located at 337 Locust St., Santa Cruz, CA, by 1:30 PM on Dec. 15, 2026 in sealed envelopes plainly endorsed:

“Santa Cruz Wharf South Landing Proposal for Engineering Services

Submitted by: ________________”

Proposals must consist of one printed hard copy and one digital copy that includes all information in the format outlined in this RFQ. The digital copy must be saved as a searchable PDF document on a USB drive. Engineer’s Fee Proposal must be submitted in a sealed envelope with Engineer’s main proposal.

Proposals received after the date and time stated above will be rejected as non-responsive. The closing time for receipt of Bid Proposals will be verified by the official United States time webpage maintained by the National Institute of Standards and Technology, U.S. Department of Commerce and the U.S. Naval Observatory, U.S. Department of Defense at https://time.gov/.

All proposals submitted must be responsive and the Engineer performing the requested services must be responsible. A responsive proposal is defined as one that conforms in all respects to the RFQ. When determining Responsiveness of a proposal, City may consider any of the following but not limited to:

Proposal received on time and completed per RFQ instruction.

Proposal contains required contents, forms and signatures submitted in accordance with

RFQ instructions.

A responsible Engineer is defined as one who has the capability, in all respects, to fully perform the RFQ requirements and the integrity and reliability to assure good-faith performance. When determining Responsibility of an Engineer, City may consider any of the following but not limited to:

Possession of industry standard licensing and/or certifications.

Financial capacity of the Vendor.

Experience or past performance of the Vendor.

Use of Subcontractors / Subconsultants.

Past, Present and Pending Legal Actions.

Exceptions with City’s Terms and Conditions.

Project delivery schedule.

City reserves the right to reject any and all proposals, including but not limited to any minor irregularities, or waive any informalities or minor defects in proposals received. City may reject a proposal if it determines that any of the proposal prices are materially unbalanced to the potential detriment of the City.

https://time.gov/

All proposals must comply in all respects with the RFQ. Proposals must clearly and legibly set forth all information requested in the manner and form indicated.

The responsibility for submitting a proposal on or before the stated time and date is solely and strictly that of Engineer.

Engineer may withdraw Engineer’s proposal at any time prior to the date and time stated above only by written request to the City.

By submitting a proposal, Engineer represents that Engineer has carefully examined the RFQ and completely understands and agrees to provide the Engineer Scope of Services set forth therein.

Addenda to this RFQ may be issued prior to the proposal opening date through City’s OpenGov procurement portal and shall become a part of an Engineer’s proposal. The additions or changes contained in such addenda shall be considered by Engineer in preparation of the proposal.

Engineers shall verify if City has issued any addenda for this Project. It is Engineer’s sole responsibility to ensure that all addenda requirements are included in the submitted proposal. All addenda shall be posted on the City’s designated website.

G. Selection Process

The contract award for Engineering Services will be made after selection by City of one (1) proposal from among all proposals received. However, this RFQ does not indicate a commitment by City to award a contract to any selected Engineer.

RFQ responses will be evaluated according to the Ranking Criteria listed below by an Evaluation

Committee composed of City staff. The evaluation committee will open and review the proposals in confidence.

Based on the final composite score as determined by the Evaluation Committee, the top three

Engineers will be ranked sequentially from the most qualified to the least, without regard to fee.

City will then open the highest-ranked Engineer’s Fee Proposal to confirm that it does not exceed the Project budget.

In the event the first-ranked Engineer’s fee exceeds the Project budget, City reserves the right to negotiate final pricing with the first-ranked Engineer. Should City and the first-ranked Engineer fail to negotiate a mutually acceptable Engineer fee, City reserves the right to negotiate the Engineer fee with the second- or third-ranked Engineer.

Engineer’s Fee Proposal must be submitted in a sealed envelope with Engineer’s main proposal.

In addition, City may choose to interview the two (2) highest-ranked Engineers. If so, the short-listed Engineers will be notified by City of the date, time and place for interviews and any other pertinent information. Engineer’s project manager and key staff must be present at the interview, which may be conducted remotely. Within a reasonable period after the last interview, City shall select the successful Engineer based on qualifications, performance at the interview, and fee.

Ranking Criteria: Points

• Responsiveness and completeness of Engineer’s proposal

• Engineer’s and Engineer’s consultants’ qualifications and experience

• Engineer’s references

• Engineer’s project schedule

Total:

City reserves the right to reject any or all proposals, to waive any informality in any proposal, and to select the proposal that best meets City’s needs.

H. Contract Award

Such award, if made, will be made by City upon 1) reviewing all submitted proposals and identifying the first-ranked Engineer capable of meeting City’s key objectives for the Project and

2) confirming that the first-ranked Engineer’s fee does not exceed the Project budget.

If the first-ranked Engineer refuses or fails to subsequently execute the Contract, the City may award the contract to the second-ranked Engineer after any necessary negotiations. If the second-ranked Engineer refuses or fails to execute the contract after any necessary negotiations, City may award the contract to the third-ranked Engineer after any necessary negotiations..

City may delay awarding the contract until additional funds are identified and appropriated by

City. If City is unable to identify and appropriate additional funds, City shall be under no obligation to proceed with contract award.

Within ten (10) calendar days after receiving written notice that the contract has been awarded, the selected Engineer shall return to City the signed Professional Services Agreement, insurance certificates, and all other documents as required by the RFQ.

I. Award Protests. The City desires to foster cooperative relationships with Vendors and to reach a fair agreement in a timely manner. The City encourages Vendors to resolve issues regarding the solicitation requirements or the procurement process through written correspondence and discussions at least 5 business days prior to the proposal due date. This will allow the City time to research the validity of the protest and either issue an addendum to the solicitation, cancel the solicitation, or determine the protest to be unfounded and proceed with the solicitation. In the event the protest of specifications is denied, and the protester wishes to continue in the protest process, the protesting vendor must still submit a proposal in accordance with the proposal submittal procedures provided in this solicitation. Questions or concerns prior to the intent to award notice will be directed to:

Norman F. Daly

Development Manager

(831) 420- 5150 ndaly @santacruzca.gov

Any Vendor who unsuccessfully bids on a city contract or any trade association representing workers who would have potentially been employed by such contract may formally protest a contract award. Protest letters regarding a formal contract award will be directed to: City of Santa Cruz City Clerk Administrator 809 Center Street, Room 9 Santa Cruz, California 95060 Protests will be filed with the City Clerk’s office no later than 5 business days after the written notice of intention to award has been distributed. Protest letters will include:

• The name, address, and telephone number of the protester;

• The solicitation title and due date;

• Name of City employee and Department designated as the contact in the original solicitation;

• A detailed statement of the legal and/or factual grounds for the protest; and

• The form of relief requested.

The City Council will hear the protest prior to award of the contract. The protesting party may protest the City’s or successful Vendor’s failure to comply with the requirements of the Purchasing Ordinance or the solicitation documents. The protest must clearly set forth the basis for the protest;

grounds not set forth in the written protest will not be considered by the City Council at the protest hearing. The City Council will sustain a protest if the protesting party demonstrates by clear and convincing evidence that, as specified above, the City would act improperly in awarding the contract. The decision of the City Council will be final.

J. Clarifications to RFQ

In the event RFQ respondents have any questions as to the meaning of any part of the RFQ, or finds any error, inconsistency, or ambiguity in the RFQ, RFQ respondents shall submit a written request for clarification to City through City’s OpenGov procurement portal prior to submitting a

K. Terms and Conditions

1. Compliance. Upon delivery of completed work set forth in the Engineer Scope of Services, Engineer certifies that the work conforms to the requirements of the:

a. RFQ;

b. Professional Services Agreement;

c. Applicable federal, state, and local code requirements; and

d. Professional standards of care in California.

2. Engineer Due Diligence. Engineer understands and will implement City’s Project objectives and act in City’s best interest at all times. Engineer is responsible for making an independent evaluation and judgment of all conditions affecting performance of the work, including without limitation site conditions, existing facilities, seismic, geologic, soils, hydrologic, geographic, climatic conditions, applicable code requirements, and all other known contingencies or design considerations. Data, calculations, opinions, reports, investigations, and other similar information provided by City relating to the Project site or local or other conditions is not warranted or guaranteed, either expressly or implied, by City. Engineer’s responsibilities under this section may not be delegated. Engineer is responsible to City for the acts, errors, or omissions of Engineer’s employees, agents, representatives, subcontractors, and consultants.

3. City Approval of Engineer’s Consultants. City must approve all consultants retained by

Engineer in Engineer’s performance of Engineer’s work. Engineer will, as part of this RFQ, submit to City a schedule of all consultants as well as a list identifying Engineer’s consultant's principal, project manager, and project designer responsible for the Project. City may reasonably object to any person or entity so designated. If City objects, then Engineer must promptly replace the objectionable person or entity and resubmit an alternate to City for approval until an acceptable alternate is submitted.

No changes may be made to the designated consultants of Engineer without the prior written consent of City unless such change results from the consultant’s termination of employment or such consultant is not capable of performing the services for which he is responsible due to disability or death. In the event of a change as specified above (e.g., termination or incapacity), City may reasonably object to any replacement, in which case Engineer must promptly replace the objectionable person or entity and resubmit an alternate to City for approval until an acceptable alternate is submitted. The designated and approved principals, project manager, and project designers must dedicate such time and work effort as may be required to assure compliance with the obligations of Engineer under this RFQ.

4. Consultant Fees and Management of Consultants. When Engineer retains a consultant, Engineer will negotiate fees on a lump sum basis and enter into a contract with the consultant and be responsible for the consultant’s work, performance, and schedule, and coordination of its work with that of the other consultants directly retained by Engineer as well as by City or their representatives.

5. Coordination of Consultants. Engineer will have the primary responsibility for coordination of

Engineer’s consultants. As part of Engineer’s coordination of Engineer’s consultants’ work product, Engineer will provide the appropriate space within the Project's design parameters to accommodate the physical work. Engineer will comply with such consultant’s recommendations via notes and/or details, subject to City’s direction.

6. City/Engineer Agreement. The form of City’s Professional Services Agreement is attached as

Exhibit D. Upon award of the contract, it is expected that the Engineer will accept the agreement terms and conditions as is without modification. Failure to execute the agreement and furnish all required award submittals within the required time period shall be just cause for the rescission of the contract award.

7. RFQ and Proposal Binding. The RFQ and all parts of the Engineer’s proposal shall be made a binding part of the Engineer’s contract. City reserves the right to reject in whole or in part any of Engineer’s proposal.

8. Insurance Requirements. At the time the contract is awarded, Engineer must be able to provide all City-required insurance documentation as set forth in Exhibit F. If these requirements are not met, City reserves the right to select the next best qualified Engineer.

9. Business License. Engineer shall obtain, within five (5) days of executing the contract for the Project work, and prior to commencing any work, a City business license and shall maintain a current business license throughout the term of contract.

10. City Right To Reject. The City reserves the right to reject any or all proposals received.

11. City Not Liable for RFQ Preparation Costs. City will not be liable for any costs incurred in the preparation of Engineer’s RFQ proposal.

12. Engineer Acknowledgement. Engineer’s proposal shall be prima facie evidence that

Engineer has full knowledge of the scope, nature, quantity, and quality of the work to be performed.

13. Clarification and Additional Information. City reserves the right to request, and Engineer shall submit, clarification of information submitted in Engineer’s proposal and to request additional information.

14. Modification or Withdrawal. Engineer’s proposal may be modified or withdrawn at any time prior to the award of the contract. Such request shall be in writing.

15. Employee/Consultant Conduct. Engineer agrees to remove any employee or consultant whose conduct is improper, inappropriate, or offensive as determined by the City. A removed employee or consultant is not to work on the Project without the written consent of the City.

Engineer will remove any employee or consultant from working in, or delivering to, City facilities who is convicted of a felony during his/her employment.

16. Property of City. Proposals received will become the property of City. All proposals and any subsequent contracts will be subject to public disclosure per the “California Public Records Act,” California Government Code, sections 6250 – 6270, once the City has awarded the contract resulting from this RFQ.

17. Revisions to Project Schedule. City reserves the right to revise the project time frame described herein.

18. Revisions to RFQ. Prior to the date established above for the submittal of proposals, City reserves the right to limit, modify, or otherwise revise any element or section of the RFQ through an addendum. Any addenda to the RFQ, if issued, will be posted on the City’s OpenGov procurement portal. RFQ proposers shall be solely responsible for checking the OpenGov procurement portal for any addenda. All proposals must include any issued addenda.

19. Revisions to Engineer’s Scope. At the sole discretion of City, Engineer’s Scope of Services may be modified, increased, or decreased by City at any time after execution of the City/Engineer Professional Services Agreement.

20. Rights of City. In connection with this procurement process, including the receipt and…