Safe Routes to Schools Trail System and Pedestrian Bridge Installation

Open State & local contract opportunity Posted

Solicitation number
ITB_26-02
State
Colorado
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Lewis-Palmer School District 38 is soliciting sealed bids from qualified contractors for construction of a pedestrian trail system and pedestrian bridge in Monument, Colorado, with bids due December 4, 2026. The work is performed in partnership with the Colorado Department of Transportation through its Safe Routes to School Program, and El Paso County is the listed jurisdiction.

The scope includes an approximately 2.5-mile pedestrian trail. Approximately 9,700 linear feet of new trail requires placement and compaction of four inches of rolled, compacted asphalt millings on a four-foot-wide surface. Approximately 3,100 linear feet utilizes existing sidewalks and gravel access roads, which will be connected and integrated into the overall trail system. The work also includes installation of a pedestrian bridge and all associated grading, drainage improvements, and site restoration as specified in the Contract Documents.

Bidders must be qualified to execute trail construction, asphalt millings installation, and pedestrian bridge installation. All work must comply with the specifications in the Contract Documents and with applicable Colorado and federal public works standards. The 43 MB biddoc.pdf attachment, posted November 4, 2026, contains the technical specifications, contract terms, and bidding requirements.

Opportunity text

Lewis-Palmer School District 38 ("District"), in partnership with the Colorado Department of Transportation (CDOT) through the Safe Routes to School Program, is soliciting sealed bids from qualified contractors for the construction of a pedestrian trail system and installation of a pedestrian bridge in Monument, Colorado.

The project includes construction of an approximately 2.5-mile-long pedestrian trail. The new trail will be four (4) feet wide and consist of four (4) inches of rolled, compacted asphalt millings. The work includes approximately 9,700 linear feet of new trail requiring placement and compaction of asphalt millings and approximately 3,100 linear feet utilizing existing sidewalks and gravel access roads that will be connected and integrated into the overall trail system. The Work also includes installation of a pedestrian bridge and all associated grading, drainage improvements, and site restoration as specified in the Contract Documents.

Files

File Type Posted
biddoc.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors