Route 9 Water Main Rehabilitation - Phase I
Closed State & local contract opportunity Posted
- Solicitation number
- 27-2100
- State
- Massachusetts
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Katelyn Barker kbarker@westboroughma.gov
Opportunity details come from constructionbidsource.com. Updated .
Opportunity text
The Work consists of the installation of a structural liner in an existing 8-inch diameter asbestos-concrete (AC) water main within the Route 9 right-of-way from Otis Street to Station 4+85 and within Otis Street from Station 0+00 to 4+56 in Westborough, MA. The length of water main to be lined will be approximately 950 feet. The Work also includes installation of approximately 270 feet of 8-inch ductile iron water main. Existing AC pipe will be removed within the access pits to install the liner and will be replaced with new 8-inch DI water main and tied-in to the existing main. Gate valves and hydrant assemblies within the limits of work will also be replaced with new DI valves and hydrant assemblies. The demolished 8-inch AC water main pipe and asbestos-contaminated material (ACM) will require removal and legal disposal. Temporary bypass piping will be required as shown and indicated within the Contract Documents. The Contractor shall account for the excavation moratorium on Town and State roads between November 1 and April 1. Therefore, excavation shall commence no earlier than April 1, 2027, and be completed by May 27, 2027. MassDOT prequalification of contractors with the class of work as Sewer and Water for the project with an estimated value of $474,130.00 will be required.
Files
| File | Type | Posted |
|---|---|---|
| Westboro_Route9_Phase I_Water_Main_Rehab_Bid_Specs_10232026.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity