Summary of Route 9 Water Main Rehabilitation - Phase I Bid Specifications
This document comprises the bid specifications and contract documents for the Town of Westborough Department of Public Works, Massachusetts, for DPW Contract No. 27-2100. The project involves the installation of a structural liner in an existing 8-inch diameter asbestos-concrete water main within the Route 9 right-of-way spanning approximately 950 linear feet, with an additional 270 linear feet of 8-inch ductile iron water main installation. The work includes replacement of existing gate valves and hydrant assemblies, removal and legal disposal of demolished asbestos concrete pipe and asbestos-contaminated material, and installation of temporary bypass piping. Sealed bids will be received at the Department of Public Works, 131 Oak Street, Westborough, MA 01581, until 2:00 PM on November 19, 2026, with bids publicly opened and read immediately thereafter. Contract documents are available electronically through BidNetDirect.com beginning October 28, 2026. No pre-bid meeting is scheduled. The successful contractor must commence work within 10 days of the Notice to Proceed and achieve substantial completion within 120 consecutive calendar days in 2027 or by no later than May 27, 2027, whichever is sooner, accounting for the excavation moratorium between November 1 and April 1.
The project carries an estimated value of $474,130.00, with MassDOT prequalification required for contractors in the Sewer and Water class of work. Bidders must submit a bid security of five percent of the bid price in the form of a certified check, bid bond, cash, or treasurer's check. The selected contractor must furnish a performance bond and payment bond each in an amount equal to 100 percent of the total contract price, with both bonds listing the Town of Westborough and MassDOT. Liquidated damages are assessed at $1,500 per calendar day for failure to complete by the deadline. Selection will be based on bidder qualifications, including evidence of past performance on similar projects and bid price, with the contract awarded to the lowest responsible and eligible bidder pursuant to Massachusetts General Law Chapter 30, Section 39M. Prevailing wage rates as determined by the Massachusetts Department of Labor and Workforce Development apply to the project, and bidders must comply with all applicable Massachusetts public bidding laws, including Chapter 149 regarding prevailing wages and Chapter 30, Section 39R regarding contractor records.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
250 Apollo Drive Chelmsford, Massachusetts 01824
DOCUMENTS AND SPECIFICATIONS
FOR
DPW CONTRACT NO. 27-2100
ROUTE 9 WATER MAIN REHABILITATION - PHASE I
WESTBOROUGH DEPARTMENT OF PUBLIC WORKS
WESTBOROUGH, MASSACHUSETTS
OCTOBER 2026
60696661
October 2026
CONTRACT DOCUMENTS
FOR
DPW CONTRACT NO. 27-2100
ROUTE 9 WATER MAIN REHABILITATION – PHASE I
Westborough Department of Public Works
WESTBOROUGH, MASSACHUSETTS
AECOM Technical Services, Inc.
250 Apollo Drive
Chelmsford, Massachusetts 01824
J.N. 60696661
AECOM Westborough, Massachusetts Chelmsford, MA Route 9 Water Main Rehabilitation – Phase I
Table of Contents 60696661 Section No. 00010-2
TABLE OF CONTENTS
Section Number
Bidding and Contract Requirements
Table of Contents 00010 Invitation for Bids 00020 Instructions to Bidders 00100 Form of General Bid 00300 Bid Bond 00310 Conflict of Interest Certification 00380 Notice of Award 00430 Agreement 00500 Construction Performance Bond 00610 Construction Payment Bond 00620 Notice to Proceed 00650 General Conditions 00700 Supplemental Conditions 00800 Incorporation of Applicable Provisions of the Mass General Law 00850 Change Order Form 00905 Certificate of Substantial Completion 00945 Waiver of Liens 00950 Certificate of Final Payment and Completion of Work 00960 Transfer of Title 00965 Consent of Surety – Partial Release 00970 Consent of Surety – Final Payment 00980 Technical Specifications 01000
Technical Specifications
Division 1 -General Requirements
Table of Contents 01003 Summary of Work 01010 Measurement and Payment 01025 Special Requirements 01030 Asbestos Concrete Pipe and ACM Abatement 01064 Reference Standards 01090 Environmental Protection 01140 Submittals 01300 Construction Progress Schedule 01310 Miscellaneous Testing and Soil Data 01320 Construction Photographs and Video Recordings 01380
Table of Contents 60696661 Section No. 00010-2
Quality Requirements 01400 Temporary Facilities 01500 Erosion and Sediment Control 01568 Traffic Management and Maintenance 01570 Delivery, Storage and Handling 01610 Contract Closeout 01700 Cleaning Up 01710 Warranties and Bonds 01740
Division 2 – Site Work
Dewatering 02140 Earthwork 02220 Geotextile Fabric 02273 Loaming, Seeding and Sodding 02485 Paving, Curbing and Sidewalks 02503 Water Mains and Appurtenances 02600 Temporary By-Pass piping and Service Connections 02605 AWWA Class IV Fully Structural Water Main Lining 02650 Water Main CCTV Inspection 02654 Cleaning Water Mains 02658 Hydrostatic Testing and Disinfection 02675
Division 3 – Concrete
Cast-in-Place Concrete 03300 Grout 03600
Attachments Attachment A – Massachusetts Prevailing Wage Rates Attachment B – MassDOT Road Opening Permit Attachment C – Utility Easements
DIVISION 4 THROUGH 16 – NOT USED
NOTE: Bidders shall check the attached documents with the above list before submitting a Bid.
END OF TABLE OF CONTENTS
END OF SECTION
Invitation for Bids 60696661 Section No. 00020-1
SECTION 00020
INVITATION FOR BIDS
Sealed bids for the construction of the Route 9 Water Main Rehabilitation – Phase I project will be received at the Department of Public Works, 131 Oak St, Westborough, MA 01581 until 2:00 PM on November 19, 2026, at which time the bids will be publicly opened and read.
The Work consists of the installation of a structural liner in an existing 8-inch diameter asbestos-concrete (AC) water main within the Route 9 right-of-way from Otis Street to Station 4+85 and within Otis Street from Station 0+00 to 4+56 in Westborough, MA. The length of water main to be lined will be approximately 950 feet. The Work also includes installation of approximately 270 feet of 8-inch ductile iron water main. Existing AC pipe will be removed within the access pits to install the liner and will be replaced with new 8-inch DI water main and tied-in to the existing main. Gate valves and hydrant assemblies within the limits of work will also be replaced with new DI valves and hydrant assemblies. The demolished 8-inch AC water main pipe and asbestos-contaminated material (ACM) will require removal and legal disposal. Temporary bypass piping will be required as shown and indicated within the Contract Documents. The Contractor shall account for the excavation moratorium on Town and State roads between November 1 and April 1. Therefore, excavation shall commence no earlier than April 1, 2027, and be completed by May 27, 2027.
Contract Documents will be available after 8:00 AM local time on October 28, 2026, by going to https://www.bidnetdirect.com/massachusetts/townwestborough. Bidders will need to register on BidNetDirect.com to get a free downloadable bid set, receive project notifications, submit questions and receive addenda. It shall be the responsibility of prospective proposers to check www.BidNetDirect.com for new information via any addenda to this solicitation. Any addenda issued will be emailed to all plan holders registered with BidNetDirect. No monetary deposit is required to obtain the bid documents electronically.
Bid period inquiries regarding the Work required by the Contract Documents shall be directed in writing to AECOM, Attn: Justin Rosenberg, Project Engineer, (Subject – Project 27-2100) at the address 250 Apollo Drive, Chelmsford, MA 01824. The facsimile number is 978-905-2101 and email is justin.rosenberg@aecom.com. Oral questions shall not be accepted, and oral interpretations of questions shall not be given.
Addenda will be issued and distributed to all plan holders registered on BidNetdirect.com.
The contract documents may be examined during normal business hours from 8:30 a.m. to noon and from 1:00 p.m. to 4:00 p.m. at:
Department of Public Works Engineering Department 131 Oak Street Westborough, MA 01581
Bids will be opened in the Office of the Department of Public Works Director on November 19, 2026. Each Bid must be accompanied by a bid security consisting of a BID BOND, CASH, or, CERTIFIED CHECK issued by a responsible bank or trust company in the amount of 5% of the bid price.
Invitation for Bids 60696661 Section No. 00020-2
MassDOT prequalification of contractors with the class of work as Sewer and Water for the project with an estimated value of $474,130.00 will be required.
No Pre-Bid meeting is scheduled for this Project.
A performance bond, listing both the Town of Westborough and MassDOT, in an amount equal to 100 percent of the total amount of the contract price with a surety company qualified to do business in the Commonwealth of Massachusetts will be required for the faithful performance of the contract, as well as a payment bond in an amount equal to 100 percent of the total contract price. Bidders shall also secure a Certificate of Liability Insurance with limits and listed entities in accordance with Section 00800 – Supplementary Conditions.
All Bids must be enclosed in a sealed envelope plainly marked:
Bid for IFB 27-2100 Route 9 Water Main Rehabilitation – Phase I
131 Oak Street, Westborough, Massachusetts 01581 Attn: Purchasing Department
All bids for this project are subject to applicable public bidding laws of Massachusetts, including, but not limited to G.L. c.30, §39M.
Attention is directed to the minimum wage rates to be paid as determined by the Commissioner of Labor and Workforce Development and the weekly payroll record submittal requirements under the provisions of Massachusetts General Laws, Chapter 149, Section 26 through 27D inclusive.
Complete instructions for filing bids are included in the DOCUMENT 00100, INSTRUCTIONS
TO BIDDERS.
Selection of the contractor will be based upon bidder qualifications, including evidence of past performance on similar projects, and bid price. The contract will be awarded to the bidder deemed by the awarding authority to be the lowest responsible and eligible bidder.
The bidder agrees that its bid shall be good and may not be withdrawn for a period of 30 days, Saturdays, Sundays, and legal holidays excluded, after the opening of the bids.
The Town reserves the right to waive any informalities, to accept or reject, in whole or in part any or all bids, or take whatever other action may be deemed to be in the best interest of the Town.
Purchasing Department
Westborough, Massachusetts
Invitation for Bids 60696661 Section No. 00020-3
Instructions to Bidders 60696661 Section No. 00100-1
SECTION 00100
INSTRUCTIONS TO BIDDERS
1. Receipt and Opening of Bids
The Town of Westborough, Massachusetts, herein called the Owner, acting by and through its Director of the Department of Public Works, will receive sealed Bids for the project known as the Route 9 Water Main Rehabilitation – Phase I Project.
General bids shall be addressed to Purchasing Department, 131 Oak Street, Westborough, Massachusetts 01581 and endorsed "Bid for Route 9 Water Main Rehabilitation – Phase I Project” (Project) will be received at the Office of the Department of Public Works Director until 2:00 PM on November 19, 2026, at which time and place said bids will be publicly opened and read aloud.
Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified will not be considered. The bidder agrees that its bid shall be good and may not be withdrawn for a period of 30 days, Saturdays, Sundays, and legal holidays excluded, after the opening of bids.
2. Location and Work to be Done
The Work consists of the installation of a structural liner in an existing 8-inch diameter asbestos-concrete (AC) water main within the Route 9 right-of-way from Otis Street to Station 4+85 and within Otis Street from Station 0+00 to 4+56 in Westborough, MA. The length of water main to be lined will be approximately 950 feet. The Work also includes installation of approximately 270 feet of 8-inch ductile iron water main. Existing AC pipe will be removed within the access pits to install the liner and will be replaced with new 8-inch DI water main and tied-in to the existing main. Gate valves and hydrant assemblies within the limits of work will also be replaced with new DI valves and hydrant assemblies. The demolished 8-inch AC water main pipe and asbestos-contaminated material (ACM) will require removal and legal disposal. Temporary bypass piping will be required as shown and indicated within the Contract Documents.
Additional drawings showing details in accordance with which the Work is to be done may be furnished by addendum from time to time during the bidding period by the Owner or its Architect/Engineer and shall then become a part of the Contract Documents.
The Contractor shall furnish all labor, services, materials, equipment, plant, machinery, apparatus, appliances, tools, supplies, and all other things necessary to do all work required for the completion of each item of the Work and as herein specified.
The Work to be done and paid for under any item shall not be limited to the exact extent mentioned or described, but shall include all incidental work necessary or customarily done for the completion of that item.
Instructions to Bidders 60696661 Section No. 00100-2
3. Preparation of Bid
Each bid must be submitted on the prescribed form. All blank spaces for bid prices must filled in, in ink or typewritten, in both words and figures.
Each bid must be submitted in a sealed envelope bearing on the outside the name of the bidder, his address, and endorsed with the name of the project as specified in Receipt and Opening of Bids, above. If forwarded by mail, the sealed envelope containing the bid must be enclosed in another envelope addressed as specified in Receipt and Opening of Bids, above.
4. Bid Opening Procedure
The following list of requirements shall apply to each filed bid. Bids not meeting all the requirements for timeliness and security will be rejected; bids not meeting signature will be rejected prior to checking of bid amounts.
Bids shall be filed at the place and before the time specified in Receipt and Opening of Bids, above.
Properly executed bid security shall be placed in a sealed envelope and shall be attached to the outside of the envelope containing the bid.
Bid signatures will be checked.
All addenda will be posted to BidNetDirect.com with an email notification sent to all prospective bidders (at the respective email address furnished by them for such purposes). All bidders shall include with their bids the written acknowledgment form provided in Section 00300, FORM OF GENERAL BID.
The total dollar amount of each bid will be read, and the three apparent lowest bids will be selected for further consideration. These three apparent low bids will be read aloud for the benefit of the other bidders and the bid opening procedure will be closed. All those present at the bid opening may examine all bids after the bid opening and after the reading of the three apparent low bids.
5. Modification
Any bidder may modify his bid by written communication at any time prior to the scheduled closing time for receipt of bids. Bidder can withdraw or replace the Bid forms with new bid package until bid deadline.
6. Ability and Experience of Bidder
No award will be made to any bidder who cannot satisfy the Owner that he has sufficient ability and experience in this class of work and sufficient capital and plant to enable him
Instructions to Bidders 60696661 Section No. 00100-3 to prosecute and complete the work successfully within the time named. The Owner's decision or judgment on these matters will be final, conclusive, and binding.
The Owner may make such investigations as it deems necessary, and the bidder shall furnish to the Owner, under oath if so required, all such information and data for this purpose as the Owner may request.
MassDOT prequalification of contractors for the Sewer and Water class of work for the project, with an estimated value of $474,130.00 will be required.
Bidder is required to submit copies of contractor license or certification issued by the prospective CIPP lining manufacturer with their bids. Failure to do so may render such bids as non-responsive.
7. Conditions of Work
Each bidder must familiarize himself fully with the conditions relating to the construction of the project and the employment of labor thereon. Failure to do so will not relieve a successful bidder of his obligation to furnish all material and labor necessary to carry out the provisions of his contract. Insofar as possible the Contractor, in carrying out his work, must employ such methods or means as will not cause any interruption of or interference with the work of any other Contractor.
8. Addenda and Interpretations
No interpretation of the meaning of the plans, specifications or other prebid documents will be made to any bidder orally. All information given to bidders other than by means of the plans, specifications, or by addenda, is given informally and shall not be used as the basis of a claim against the Owner.
Questions and answers will be posted on Bidnet and shared with all the plan holders who are registered on BidNetDirect.com.
9. Security for Faithful Performance
Simultaneously with his delivery of the executed Contract, the Contractor shall furnish a surety bond or bonds as security for faithful performance of this contract and for the payment of all persons performing labor and materials under this contract. The surety on such bond or bonds shall be a surety company qualified to do business under the laws of the Commonwealth of Massachusetts and satisfactory to the Owner. The bonds shall remain in force for one year after final acceptance of the work by the Owner, unless the Owner, in writing, releases the Contractor from the obligation sooner.
10. Power of Attorney
Attorneys-in-fact who sign Contract bonds must file with each bond a certified and effectively dated copy of their power of attorney.
Instructions to Bidders 60696661 Section No. 00100-4
11. Laws and Regulations
The bidder's attention is directed to the fact that all applicable State laws, municipal ordinances or bylaws, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the contract throughout, and they will be deemed to be included in the Contract the same as though written out in full.
12. Liquidated Damages for Failure to Enter into Contract
The successful bidder, upon his failure or refusal to execute and deliver the signed Contract and bonds required within 10 business days after presentation thereof by the Owner, shall forfeit to the Owner, as liquidated damages for such failure or refusal, the security deposited with his/her bid, but the amount forfeited shall not exceed the difference between his/her bid price and the bid price of the next lowest responsible and eligible bidder. In case of death, disability, bona fide clerical or mechanical error of a substantial nature, or other similar unforeseen circumstances affecting the bidder, his/her bid deposit will be returned.
13. Obligation of Bidder
At the time of the opening of bids, each bidder will be presumed to have inspected the site and to have read and to be thoroughly familiar with the Contract Documents (including all addenda). The failure or omission of any bidder to examine any form, instrument, or document shall in no way relieve any bidder from any obligation in respect of his bid.
14. Information Not Guaranteed
All information given in the Contract Documents relating to subsurface and other conditions, natural phenomena, existing pipes, and other structures is from the best sources at present available to the Owner. All such information is furnished only for the information and convenience of bidders and is not guaranteed.
It is agreed and understood that the Owner does not warrant or guarantee that the subsurface or other conditions, natural phenomena, existing pipes, or other structures encountered during construction will be the same as those indicated in the Contract Documents. It is further agreed and understood that no bidder or Contractor shall use or be entitled to use any of the information made available to him or obtained in any examination made by him in any manner as a basis of or ground for any claim or demand against the Owner or the Architect/Engineer, arising from or by reason of any variance which may exist between the information made available and the actual subsurface or other structures actually encountered during the construction work, except as may otherwise be expressly provided for in the Contract Documents.
15. Bid Security
Each bid and sub-bid must be accompanied by bid security in the form of a certified check, a bid bond, cash, or a treasurer's or cashier's check, payable to the Owner, in the
Instructions to Bidders 60696661 Section No. 00100-5 amount of five (5) percent of the value of the bid. Such security of general bidders will be returned to all except the three lowest responsible and eligible bidders within five days, Saturdays, Sundays, and legal holidays excluded, after the opening of bids, and the remaining securities will be returned promptly after the Owner and the accepted bidder have executed the Contract, or if no notice of intent to award has been presented to the selected contractor within 30 days, Saturdays, Sundays and holidays excluded, after the date of the opening of bids, upon demand of the bidder at any time thereafter.
16. Right to Reject Bid
The Owner reserves the right to waive any informalities in bids and to reject any and all bids, should the Owner deem it to be in the public interest to do so.
The Owner may also reject bids which in its sole judgment are either incomplete, conditional, obscure, or not responsive or which contain additions not called for, erasures not properly initialed, alterations, or similar irregularities.
17. Time for Construction
The successful general bidder must agree to commence work within ten (10) days of the date of the Notice to Proceed and to fully complete the project within the time limit stated in Section 00300, FORM OF GENERAL BID. The Contractor shall use no more than 120 consecutive calendar days in 2027 to be substantially complete or shall be substantially complete by no later than May 27, 2027, whichever is sooner. The Contractor shall account for the excavation moratorium on Town and State roads between November 1 and April 1. Therefore, excavation shall commence no earlier than April 1, 2027, and be completed by May 27, 2027.
18. Comparison of Bids
Bids will be compared on the basis of prices set forth in the bid forms.
In the event that there is a discrepancy between the lump sum or unit prices written in words and figures, the prices written in words will govern.
19. Award of Contract
The Contract will be awarded to "the lowest responsible and eligible bidder" pursuant to General Laws Chapter 30, Section 39M, as amended. Such a bidder shall possess the skill, ability, and integrity necessary for the faithful performance of the work, shall be able to furnish labor that can work in harmony with all other elements of labor employed, or to be employed, in the work, and shall otherwise comply with all applicable provisions of law. Contract award shall be subject to availability of an appropriation for funding.
Instructions to Bidders 60696661 Section No. 00100-6
20. Statutes Regulating Competitive Bidding
Any bid which does not comply with the provisions of Massachusetts General Laws Chapter 30, Section 39M, as amended, need not be accepted and the Owner may reject every such bid.
21. Wage Rates
Prevailing Wage Rates as determined by the Commissioner of Department of Labor and Workforce Development under the provision of the Massachusetts General Laws, Chapter 149, Section 26 to 27G, as amended, apply to this project. It is the responsibility of the bidder, before bid opening, to request any additional information on Prevailing Wage Rates for those tradespeople who may be employed for the proposed work under this contract.
22. Contractor Records
The Contractor shall comply with the provisions of Massachusetts General Laws, Chapter 30, Section 39R concerning Contractor records.
23. INSURANCE
The Contractor shall carry and continuously maintain until completion of the Contract, insurance with coverages and listed entities as specified in Section 00800.
25. PROJECT MANAGER
The Owner may utilize the services of a project manager, whose duties shall be as set forth in an Agreement for Project Manager Services.
Form For General Bid 60696661 Section No. 00300-1
SECTION 00300
FORM OF GENERAL BID
Bid of __________________________________ (hereinafter called "Bidder")*
(____) a corporation, organized and existing under the laws of the state of
(____) a partnership
(____) a joint venture
(____) an individual doing business as _____________________________________
To the Town of Westborough, Massachusetts (hereinafter called "Owner").
Gentlemen:
A) The undersigned Bidder, in compliance with your invitation for bids for the project known as Route 9 Water Main Rehabilitation – Phase I Project, having examined the plans and specifications and related documents and the site of the proposed work, and being familiar with all of the conditions surrounding the construction of the proposed project including the availability of materials and labor, hereby proposes to furnish all labor, materials, and supplies, and to construct the project in accordance with the contract documents and the plans and specifications within the time set forth below, and at the prices stated below. These prices are to cover all expenses incurred in performing the work required under the contract documents, of which this bid is a part.
The Bidder hereby agrees to commence work on or before the date to be specified in written "Notice to Proceed" of the Owner, and to fully complete the project within 120 consecutive calendar days in 2027 or by no later than May 27, 2027, whichever is sooner, thereafter in the sequence specified in Section 00100 Instructions to Bidders. The Bidder further agrees to pay as liquidated damages the sum of one thousand five hundred ($1,500) Dollars for each calendar day thereafter that the work is not complete as provided in the contract.
Bidder acknowledges receipt of Addenda No. _____ through _____.
*Specify corporation, partnership or individual as applicable.
Form For General Bid 60696661 Section No. 00300-2
BID ITEMS
Bidder agrees to perform all Work, including all incidental labor, materials, and equipment necessary for the satisfactory completion of the Work and in full compliance with the contents and intent of the Contract Documents of the Work, for the following prices listed below.
All prices, except item totals, shall be stated in both words and figures. In the event of a discrepancy between the price in words and the price in figures, the words shall govern. In the event of a discrepancy between the total of the Items and the total stated, the total of the Items shall govern.
Interlineations, alteration, or erasure may void the Bid. All prices shall be typewritten or written by hand in ink.
Item Quantity Extended
Total
1. For Mobilization/Demobilization, (not to exceed five percent of the Total Bid Amount exclusive of Item 1) as specified, the sum of
Dollars ($ ) Lump Sum
2. For 8-inch diameter Ductile Iron pipe, furnished and installed as specified, the sum of
Dollars ($ ) per l.f.
3. For 8-inch gate valves, furnished and installed as specified, the sum of
Dollars ($ ) per each
4A. For pre-lining CCTV water main inspection, as specified, the sum of
Dollars ($ ) per l.f.
4B. For fully structural water main lining, furnished and installed as specified, the sum of
Dollars ($ ) per l.f.
Form For General Bid 60696661 Section No. 00300-3
4C. For post-lining CCTV water main inspection, as specified, the sum of
Dollars ($ ) per l.f.
5. For access trench/pit excavation, as specified, the sum of
Dollars ($ ) per c.y.
6. For furnishing and installing hydrant assemblies completed as specified, the sum of
Dollars ($ ) per each
7A. For furnishing, installing, maintaining and removing 4-inch diameter temporary by-pass piping as specified, the sum of
1,800 Dollars ($ ) per l.f.
7B. For furnishing, installing, maintaining and removing 6-inch diameter temporary by-pass piping as specified, the sum of
Dollars ($ ) per l.f.
8A. For the removal and legal disposal of Asbestos Concrete pipe as specified, the sum of
Dollars ($ ) per l.f.
8B. For the removal and legal disposal of Asbestos Containing Material (ACM) pipe as specified, the sum of
Dollars ($ ) per c.y.
9. For furnishing and installing miscellaneous cement concrete, complete as specified, the sum of
Dollars ($ ) per c.y.
Form For General Bid 60696661 Section No. 00300-4
10. For rock and/or boulder excavation including replacement with suitable fill material as specified, the sum of
10* Dollars ($ ) per c.y.
**Minimum bid price of $100.00 per c.y.
11A. For material to replace unsuitable material above trench grade furnished and placed as specified, the sum of
20* Dollars ($ ) per c.y.
**Minimum bid price of $50.00 per c.y.
11B. For material to replace unsuitable material below trench grade furnished and placed as specified, the sum of
40* Dollars ($ ) per c.y.
**Minimum bid price of $50.00 per c.y.
12. For Experimental Excavation, as specified, the sum of
20* Dollars ($ ) per c.y.
**Minimum bid price of $50.00 per c.y.
13A. For Type 2E Controlled Density Fill, furnished and placed as specified, the sum of
Dollars ($ ) per c.y.
13B. For road base course material, furnished and placed as specified, the sum of
Dollars ($ ) per c.y.
14A. For bituminous concrete excavation by cold planing, as specified, the sum of
Dollars ($ ) per ton
14B. For Superpave Surface Course, furnished and placed as specified, the sum of
Dollars ($ ) per ton
Form For General Bid 60696661 Section No. 00300-5
14C. For Superpave Intermediate Course, furnished and placed as specified, the sum of
Dollars ($ ) per ton
14D. For Superpave Base Course, furnished and placed as specified, the sum of
Dollars ($ ) per ton
14E. For miscellaneous bituminous concrete, furnished and placed as specified, the sum of
Dollars ($ ) per ton
14F. For infrared trench repair as specified, the sum of
Dollars ($ ) per s.y.
14G. For pavement markings furnished and placed as specified, the sum of
Dollars ($ ) per l.f.
15. For removing and relaying or replacing existing storm drain piping as specified, the sum of
Dollars ($ ) per inch-foot
16A. For furnishing, installing, maintaining and removing sedimentation control barrier as specified, the sum of
Dollars ($ ) per l.f.
16B. For furnishing, installing, maintaining and removing catch basin silt sacks as specified, the sum of
Dollars ($ ) per each
17. For removing and resetting or replacing existing granite curb or, the sum of
Dollars ($ ) per l.f.
Form For General Bid 60696661 Section No. 00300-6
*Indeterminate; quantity is assumed for comparison of bids **Bidder must insert minimum price or greater and insert extended item prices.
TOTAL AMOUNT OF BID BASED ON ENGINEER'S ESTIMATE OF QUANTITIES:
(Items 1 through 19, inclusive)) - BASIS OF AWARD.
Dollars ($ )
The above unit prices shall include all labor, materials, bailing, shoring, removal, overhead, profit, insurance, etc., to cover the finished work of the several kinds called for.
The Bidder understands that all bids for this project are subject to the applicable bidding laws of the Commonwealth of Massachusetts, including General Laws Chapter 149 and Chapter 30, Section 39M, as amended.
The Bidder understands that the Owner reserves the right to reject any or all bids and to waive any informalities in the bidding.
The Bidder agrees that this bid shall be good and may not be withdrawn for a period of 30 days, Saturdays, Sundays, and legal holidays excluded, after the opening of bids.
Within 10 days of receipt of the written notice of acceptance of this bid, the Bidder will execute the formal Agreement set forth in Section 00500 AGREEMENT.
Bid security is attached in the sum of five percent (5%) of the total bid in accordance with the conditions of Section 00100 INSTRUCTIONS TO BIDDERS. The bid security may become the property of the Owner in the event the contract and bond are not executed within the time set forth above.
The selected Contractor shall furnish a performance bond and a payment bond in an amount at least equal to one hundred percent (100%) of the contract price in accordance with Section 00610 CONSTRUCTION PERFORMANCE BOND, Section 00620 CONSTRUCTION PAYMENT BOND, and as stipulated in the contract. The Performance Bond shall list the Town of Westborough and MassDOT and shall remain in force for a period of three (3) years from final acceptance of the Work.
18. For uniformed traffic police as specified, the allowance of
Sixty Thousand Allowance $60,000.00 Dollars ( $ 60,000.00 ) allowance
19. For landscaping as specified, the allowance of
Ten Thousand Allowance $10,000.00 Dollars ( $ 10,000.00 ) allowance
Form For General Bid 60696661 Section No. 00300-7
The undersigned offers the following information as evidence of his qualifications to perform the work as bid upon according to all the requirements of the plans and specifications.
1. Have been in business under present name for ____ years.
2. The names and addresses of all persons interested in the bid (if made by a partnership or corporation) as principals, are as follows:
(attach supplementary list if necessary)
3. Contractor license or certification issued by the prospective CIPP lining manufacturer (attach to bid proposal).
Form For General Bid 60696661 Section No. 00300-8
3. The bidder is requested to state below what work of a similar character to that included in the proposed contract he has done and give references that will enable the Owner to judge his experience, skill, and business standing (add supplementary page if necessary).
Completion Project Contract Design Reference Telephone Date Name Amount Engineer Name No.
a.__________________________________________________________________________________________ b.__________________________________________________________________________________________ c.__________________________________________________________________________________________ d.__________________________________________________________________________________________ e.__________________________________________________________________________________________ f.__________________________________________________________________________________________
Form for General Bid 60696661 Section No. 00300-9
Bank reference _____________________________________ (Name)
(Bank)
(Address)
(Telephone No.)
Pursuant to G.L. c.62C, §49A, I certify hereby in writing, under penalties of perjury, that the within named Bidder/Contractor has complied with all laws of the commonwealth relating to taxes, reporting of employees and contractors, and withholding and remitting of child support.
The undersigned Bidder hereby certifies under penalties of perjury, as follows: (1) that he/she is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed in the work; (2) that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration at the time the employee begins work and who shall furnish documentation of successful completion of said course with the first certified payroll report for each employee; and (3) that all employees to be employed in the work subject to this bid have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration.
The undersigned certifies under penalties of perjury that this bid is in all respects bona fide, fair, and made without collusion or fraud with any other person. As used in this paragraph the word “person” shall mean any natural person, joint venture, partnership, corporation or other business or legal entity.
The undersigned bidder hereby certifies, under pains and penalties of perjury, that the foregoing bid is based upon the payment to laborers to be employed on the project of wages in an amount no less than the applicable prevailing wage rates established for the project by the Massachusetts Department of Labor and Workforce Development. The undersigned bidder agrees to indemnify the awarding authority for, from and against any loss, expense, damages, actions or claims, including any expense incurred in connection with any delay or stoppage of the project work arising out of or as a result of (1) the failure of the said bid to be based upon the payment of the said applicable prevailing wage rates or (2) the failure of the bidder, if selected as the contractor, to pay laborers employed on the project the said applicable prevailing wage rates.
Form for General Bid 60696661 Section No. 00300-10
Respectfully submitted:
Date: ______________ By: _____________________________ (Signature)
(Type Name of Bidder)
(Title)
(Business Address)
(City and State)
(Telephone Number
Bid Bond 60696661 Section No. 00310-1
DOCUMENT 00310
BID BOND
Know all men by these presents, that we, the undersigned, ________________________________ _________________________________________________________________ as Principal, and __________________________________________________________ as Surety, are hereby held and firmly bound unto the Department of Public Works, 131 Oak Street, Westborough, Massachusetts 01581 acting by and through its Department of Public Works Director as Owner in the penal sum of five (5) percent of the value of the Bid for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors and assigns.
Signed, this day of , .
The Condition of the above obligation is such that whereas the Principal has submitted to the Department of Public Works, 131 Oak Street, Westborough, Massachusetts 01581, acting by and through its Department of Public Works Director a certain Bid, attached hereto and hereby made a part hereof to enter into a Contract in writing, for , Route 9 Water Main Rehabilitation – Phase I Project, Contract 27-2100.
Now, therefore,
(a) If said Bid shall be rejected, or
(b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the
Form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a Bond for his faithful performance of said Contract, and for the payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the agreement created by the acceptance of said Bid, then this obligation, shall be void, otherwise the same shall remain in force and effect; it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its Bond shall be in no way impaired or affected by any extension of the time within which the Owner may accept such Bid and said Surety does hereby waive notice of any such extension.
Bid Bond 60696661 Section No. 00310-2
In witness whereof, the Principal and the Surety have hereunto set their hands and seals, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above.
(L.S.)
Principal
Surety
By:
Important - Surety companies executing Bonds must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the State where the Project is located.
Conflict of Interest Certification 60696661 Section No. 00380-1
SECTION 00380
CONFLICT OF INTEREST CERTIFICATION
PROJECT: Route 9 Water Main Rehabilitation – Phase I, Contract 27-2100
PROJECT LOCATION: Town of Westborough, Massachusetts
AWARDING AUTHORITY: Town of Westborough, Massachusetts
I hereby certify that no official or employee of the Town of Westborough has a financial interest in the Bidder’s proposal or executed Contract or in the expected profit to arise therefrom, unless that official or employee has been compliance with the provisions of MGL, c. 43, § 27, Interest in Public Contracts by Public Employees Prohibited; Penalty, and with the provisions of MGL, c.
268A, § 20, Municipal Employees; Financial Interest in Contracts; Holding One or More Elected Positions.
If an Individual:
Social Security Number: _____________________________________________
If a Corporation:
Federal I.D. Number:________________________________________________
(Authorized Signature)
Subscribed and sworn to before me this _______________day of __________, 20___
(Name)
(Title)
My commission expires:___________________________________________________
Notice of Award 60696661 Section No. 00430-1
DOCUMENT 00430
NOTICE OF AWARD
To: _________________
Project Description: Contract No. 27-2100, Route 9 Water Main Rehabilitation – Phase I, Department of Public Works, 131 Oak Street, Westborough, Massachusetts 01581.
The Owner has considered the Bid submitted by you for the above described work in response to its DOCUMENT 00020, ADVERTISEMENT FOR BIDS and DOCUMENT 00100, INSTRUCTIONS TO BIDDERS. You are hereby notified that your Bid has been accepted in the amount of $______________________.
You are required by DOCUMENT 00100, INSTRUCTIONS TO BIDDERS to execute DOCUMENT 00500, AGREEMENT and furnish the required Contractor’s Performance Bond, Payment Bond and Certificates of Insurance within ten (10) calendar days from the date of this Notice of Award. If you fail to execute said Agreement and to furnish said Bonds within ten (10) days from the date of this Notice of Award, said Owner will be entitled to consider all your rights arising out of the Owner’s acceptance of your Bid as abandoned and as a forfeiture of your Bid Bond. The Owner will be entitled to such other rights as may be granted by law. You are required to return an acknowledged copy of this Notice of Award to the Owner.
Dated this day of , .
Owner: Department of Public Works 131 Oak Street Westborough, Massachusetts 01581
By:
Title
Acceptance of Notice:
Receipt of the above Notice of Award is hereby acknowledged by this day of _, By:
(Authorized Signature)
Title:
Agreement 60696661 Section No. 00500-1
SECTION 00500
AGREEMENT
THIS AGREEMENT, made this _________ day of ________________, 2026 by and between the party of the first part, the Town of Westborough, hereinafter called "OWNER," acting herein through its Town Manager, and the party of the second part, _______________________________________________ doing business as *(an individual) (a partnership) (a joint venture) (a corporation) located in the *(City) (Town) of _______________, County of _______________________, and State of __________________________, hereinafter called "CONTRACTOR."
WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the OWNER, the CONTRACTOR hereby agrees with the OWNER to commence and complete the project as described herein.
hereinafter called the project, for the sum of __________________ _________________________________________________________________ Dollars ($_________________) and all extra work in connection therewith, under the terms as stated in the Contract Documents; and at his (its or their) own proper cost and expense to furnish all the materials, supplies, machinery equipment, tools, superintendence, labor, insurance, and other accessories and services necessary to complete the said project in accordance with the conditions and prices stated in Section 00300 FORM OF GENERAL BID, Section 00700 GENERAL CONDITIONS, and Section 00800 SUPPLEMENTAL GENERAL CONDITIONS, the plans, which include all maps, plates, blue prints, and the specifications and Contract Documents as prepared by the Owner.
*Strike out inapplicable term.
Agreement 60696661 Section No. 00500-2
The CONTRACTOR hereby agrees to commence work under this Contract on or before a date to be specified in written "Notice to Proceed" of the OWNER.
The CONTRACTOR further agrees to fully complete the project within 120 consecutive calendar days in 2027 from the date of the notice to proceed or by no later than May 27, 2027, whichever is sooner.
The CONTRACTOR further agrees to pay as liquidated damages the sum of one thousand and five hundred ($1,500) dollars for each consecutive calendar day thereafter as provided in the Liquidated Damages Paragraph of Section 00700 GENERAL CONDITIONS.
The CONTRACTOR agrees not to discriminate against or exclude any person from participation herein on grounds of race, religion, color, sex, age or national origin; and that it shall take affirmative actions to ensure that applicants are employed, and that employees are treated during their employment, without regard to race, religion, color, sex, age, handicapped status, or national origin.
The CONTRACTOR agrees not to participate in or cooperate with an international boycott, as defined in Section 999 (b)(3) and (4) of the Internal Revenue Code of 1954, as amended, or engage in conduct declared to be unlawful by Section 2 of Chapter 151E of the Massachusetts General Laws.
The OWNER agrees to pay the CONTRACTOR in current funds for the performance of the contract, subject to additions and deductions, as provided in Section 00700 GENERAL CONDITIONS, and to make payments on account thereof as provided in the Estimates and Payments Paragraph of Section 00700 GENERAL CONDITIONS.
IN WITNESS WHEREOF, the parties to these presents have executed this contract in four (4) counterparts, each of which shall be deemed an original, in the year and day first above mentioned.
Agreement 60696661 Section No. 00500-3
AGREED:
Town of Westborough, Massachusetts
(Owner)
By_______________________________________
(Name)
(Title)
(Contractor)
By_______________________________________
(Name)
(Title)
(Address)
Approved as to Form: _________________________________ (City and State)
By__________________________ (Owner's Counsel)
(Name)
In accordance with M.G.L. C.44, Section 31C, this is to certify that an appropriation in the amount of this contract is available therefor and that the _____________ has been authorized to execute the contract and approve all requisitions and change orders.
By__________________________ (Owner's Accountant)
(Name)
Agreement 60696661 Section No. 00500-4
CERTIFICATE OF VOTE
(to be filed if Contractor is a Corporation)
I, _______________________________, hereby certify that I am the duly qualified (Secretary of the Corporation) and acting Secretary of ______________________ and I further certify that a meeting of the
(Name of Corporation) Directors of said Company, duly called and held on _______________________, at which
(Date of Meeting) all Directors were present and voting, the following vote was unanimously passed:
VOTED: To authorize and empower
Anyone acting singly, to execute Forms of General Bid, Contracts or Bonds on behalf of the Corporation.
I further certify that the above vote is still in effect and has not been changed or modified in any respect.
By:________________________________ (Secretary of Corporation)
A True Copy:
Attest:_________________________________ (Notary Public)
My Commission Expires:__________________ (Date)
Agreement 60696661 Section No. 00500-5
CERTIFICATIONS REQUIRED BY LAW
FOR PUBLIC CONSTRUCTION CONTRACTS
You must COMPLETE and SIGN the following certifications. You must also print, at the bottom of this page, the name of the contractor for whom these certifications are submitted.
TAX COMPLIANCE
Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A(b), I, the undersigned, authorized signatory for the below named contractor, do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts relating to taxes, reporting of employees and contractors, and withholding and remitting child support.
NON-COLLUSION
The undersigned certifies under the penalties of perjury that this bid is in all respects bona fide, fair and made without collusion or fraud with any other person. As used in this subsection the word "person'' shall mean any natural person, joint venture, partnership, corporation or other business or legal entity.
PUBLIC CONTRACTOR DEBARMENT
The undersigned certifies under penalty of perjury that the below named contractor is not presently debarred from doing public construction work in the commonwealth under the provisions of section twenty-nine F of chapter twenty-nine, or any other applicable debarment provisions of any other chapter of the General Laws or any rule or regulation promulgated thereunder.
OSHA TRAINING
Pursuant to G.L. c. 30, §39S, the Contractor hereby certifies under penalties of perjury as follows:
(1) Contractor is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed in the work;
(2) All employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration at the time the employee begins work and they shall furnish documentation of successful completion of said course with the first certified payroll report for each employee; and
(3) All employees to be employed in the work subject to this contract have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration.
COMPLETE AND SIGN BELOW:
Authorized Person’s Signature Date
Print Name & Title of Signatory
Name of Contractor
Construction Performance Bond 60696661 Section No. 00610-1
SECTION 00610
CONSTRUCTION PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS: That we ___________________________ (Name of Contractor) a ___________________________________________ hereinafter called “Principal” and (Corporation, Partnership, Joint Venture or Individual)
______________________________of ______________, State of ______________________ (Surety) (City & State)
_________________________ hereinafter called the "Surety" and licensed by the State Division of Insurance to do business under the laws of the Commonwealth of Massachusetts, are held and firmly bound to the City/Town of _______________, Massachusetts, hereinafter called "Owner", in the penal sum of ______________________________________________________ Dollars ($______________________) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that Whereas, the Principal entered into a certain contract with the Owner, dated the __________ day of _________________, 20___ (the “Construction Contract”), for the construction described as follows: ___________
NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions, and agreements of the Construction Contract during the original term thereof, and any extensions thereof which may be granted by the Owner, with or without notice to the Surety, and if he shall satisfy all claims and demands incurred under the Construction Contract, and shall fully indemnify and save harmless the Owner from all costs and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the Owner all outlay and expense which the Owner may incur in making good any default, then this obligation shall be void; otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the Surety’s obligation under this Bond shall arise after (1) the Owner has declared the Principal in default of the Construction Contract or any provision…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .