Roof Replacement at Sports Room Building
Open State & local contract opportunity Posted
- Solicitation number
- 23-2026
- State
- New Jersey
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Karen Sullivan ksullivan@livingstonnj.org (973) 992-5000
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Township of Livingston, New Jersey is soliciting bids under Bid No. 23-2026 for a roof replacement at its Sports Room Building, with bids due November 18, 2026. The opportunity is listed under Essex County, and the source names no set-aside, preference program, or eligibility restriction.
The contractor must furnish all labor, materials, equipment, and disposal. Work includes removing the existing shingle roofing system and deteriorated components, installing new dimensional-style asphalt shingles over the prepared deck, and installing underlayment and ice-and-water protection per applicable building codes and manufacturer requirements. The scope also covers new flashing at roof-to-wall, penetration, and transition locations; replacing deteriorated plywood or roof sheathing as needed, with replacement sheathing charged as an additional cost if not included in the base bid; removing and replacing damaged fascia where needed to support the gutter system; and removing existing gutters and leaders and installing new commercial-sized gutters and properly sized leaders. A standard roof manufacturer warranty is required. The U-shaped building measures approximately 204 linear feet combined, and bidders must verify measurements in the field.
The contract includes a contingency for concealed structural damage, extensive plywood replacement, damaged framing, and other conditions not reasonably visible before the existing roofing is removed. Contractors must document such conditions and submit them for approval as additional work.
Opportunity text
Contractor shall furnish all labor, materials, equipment, and disposal necessary to complete the following work: 1. Roof Removal o Remove and properly dispose of the existing shingle roofing system. o Remove deteriorated or damaged roofing components as necessary to prepare the roof deck for installation of the new roofing system. Township of Livingston Bid No. 23-2026 22 2. New Roofing System o Install new dimensional-style asphalt shingles over the prepared roof deck. o Install required roofing underlayment and ice-and-water protection in accordance with applicable building codes and manufacturer requirements. o Install new roof flashing at applicable roof-to-wall, penetration, transition, and other flashing locations. o Replace deteriorated or damaged plywood/roof sheathing as needed. Replacement sheathing to be charged as an additional cost if not included in the base bid. o Provide standard roof manufacture warranty. 3. Fascia o Remove existing damaged fascia as required. o Furnish and install new fascia where necessary to provide a sound substrate for the gutter system. 4. Gutters and Leaders o Remove and dispose of existing gutters and leaders. o Install 6 new -6-inch commercial-sized gutters. o Install new properly sized leaders/downspouts and connect them to provide effective drainage. o Provide appropriate gutter pitch and secure all gutter components to the structure. 5. Building Configuration o Building is U-shaped (see attached picture). o Approximate combined length of all sections: 204 linear feet - Interested bidders shall verify measurements in field. Contingency- Additional Work Any concealed structural damage, extensive plywood replacement, damaged framing, or other conditions not reasonably visible prior to removal of the existing roofing shall be documented and submitted for approval as additional work. A contingency has been included in the contract for the additional work encountered during the project. This contingency shall include any additional work necessary due to existing unforeseen obstructions, conflicts or any other unanticipated obstacles to the planned improvements and may be used for more than one item of work. This contingency will only be used at the sole discretion of the Township after the additional work has been defined by the Township and after a value has been negotiated for this additional work by the Township and the Contractor. If no additional work is required by the Owner, no payment will be made under this item.
Files
| File | Type | Posted |
|---|---|---|
| livingston Township of Livingston.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity