Road Improvements M-150 from Tienken Road southerly to Paint Creek and M-150 from Clinton River

Closed State & local contract opportunity Posted

Solicitation number
63132-204314
State
Michigan
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The State of Michigan Department of Transportation is requesting bids on comprehensive road improvements to M-150 in Rochester Hills, Oakland County, with bids due November 6, 2026 and a letting scheduled for 10:30 a.m. at 425 W. Ottawa Street, Lansing. The project carries a mandatory 5.00% Disadvantaged Business Enterprise (DBE) participation set-aside with 0.00% Small Business Person (SBP) participation required.

The scope spans 1.37 miles of hot mix asphalt reconstruction and 2.77 miles of cold milling and overlay on two segments of M-150 (Tienken Road southerly to Paint Creek, and Clinton River southerly to M-59), plus associated work including partial deck replacement, deck and barrier patching, epoxy overlay, expansion joint replacement, substructure patching, silane treatment, epoxy injecting of box beams, downspout installation, scour countermeasures, full-depth pavement repairs, storm sewer, concrete curb and gutter, driveway and sidewalk improvements, signing, signals, lighting, guardrail, underdrain, and pavement markings. The project incorporates three separate warranty provisions: two 5-year materials and workmanship pavement warranties, a 2-year concrete surface coating warranty, and a 5-year pavement performance warranty. Project completion is targeted for September 30, 2030. Prime contractors must meet net classification requirements of either Comb/Jt. 42550 Cb and Ea, 42550 Cb and K, or 42550 Ea and K; if not prequalified in all required subclassifications, prequalified subcontractors must be designated prior to contract award. Five control sections with varying contract IDs are included in the letting, and the proposal totals approximately 742 pages.

Opportunity text

: 1.37 mi of hot mix asphalt reconstruction, 2.77 mi of hot mix asphalt cold milling and overlay, partial deck replacement, deck patching, epoxy overlay, expansion joint replacement, substructure patching, silane treatment, epoxy injecting box beams, barrier patching, downspout installation, scour countermeasure, full depth pavement repairs, storm sewer, concrete curb and gutter, driveway and sidewalk, signing, signals, lighting, guardrail, underdrain and pavement markings on M-150 from Tienken Road southerly to Paint Creek and M-150 from Clinton River southerly to M-59 in the city of Rochester Hills, Oakland County. This project includes two 5 year materials and workmanship pavement warranties, a 2 year concrete surface coating warranty, and a 5 year pavement performance warranty.

Files

File Type Posted
bidnotice.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors