RIARNG Fabricate and Install a Mezzanine at Middletown Armory
Awarded State & local contract opportunity Posted
- Solicitation number
- RFQ23001894
- State
- Rhode Island
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Katherine Missell katherine.missell@purchasing.ri.gov (401) 574-8114
Opportunity details come from webprocure.proactiscloud.com. Updated .
About this opportunity
The Rhode Island Army National Guard (RIARNG) is seeking a vendor to fabricate and install a steel mezzanine at the Middletown Armory located in Middletown, Rhode Island. The project requires constructing a mezzanine approximately 90 feet long by 20 feet wide within the armory's drill shed, which measures 96 feet long by 61 feet wide and 22 feet high. The selected vendor must provide all necessary labor, materials, equipment, permits, and supervision, along with two sets of stamped 24x36 construction documents, one of which must be submitted to the Rhode Island Building Code Commission for review and approval. The mezzanine design must comply with all state, federal, and International Building Code (IBC) standards, and all steel used must be manufactured in the United States. A non-mandatory pre-bid conference was held on September 29, 2022, with the solicitation period running from September 19 to October 20, 2022. Vendors were required to submit their proposals electronically through the Ocean State Procures system, with a base bid that includes a $15,000 allowance for unforeseen conditions.
The procurement includes specific set-aside requirements for Minority Business Enterprise (MBE) and Women-Owned Business Enterprise (WBE) participation, with a minimum goal of 10% of the total contract value. Vendors must provide a bid surety bond or certified check for 5% of the bid amount and, if awarded the contract, furnish 100% payment and performance bonds prior to purchase order issuance. Insurance requirements are comprehensive, including $1,000,000 in liability coverage, workers compensation, and automobile liability. The contract includes a liquidated damages clause of $100 per day for late completion, and the initial contract term is expected to begin in November 2022, with work to commence within two weeks of receiving the notice of contract purchase agreement. While no specific budget range was explicitly stated, the inclusion of a $15,000 allowance for unforeseen conditions suggests some flexibility in the project's financial parameters. The contract will utilize the AIA A104-2017 Standard Abbreviated Form of Agreement Between Owner and Contractor, with modifications specific to the State of Rhode Island.
Opportunity text
RIANG is seeking a vendor To fabricate and install a steel mezzanine. The selected vendor shall fabricate and install a RIARNG steel mezzanine in the Armory's drill shed. The proposed mezzanine is approximately 90'L x 20'W (refer to attached floor plans and elevation drawing). This structure will be in the drill shed, which is approximately 96' L x 61' W x 22' H. Furnish all labor, material, equipment, permits and supervision. Two (2), sets (24x36) of stamped construction documents are required. To include the submittal of one (1), stamped set to the Rhode Island Building Code Commission (RIBCC), for review and approval. The mezzanines design shall comply with all State, Federal and IBC building codes and standards. All steel shall be made in the USA. Apply for RI Building Permit. And As-builts provided to the Owner. Prebid conference Thursday, September 29 , 2022, at 9:00 A.M. 106 Airport Access Road, Middletown, RI 02842
Files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity