The University of Washington is soliciting Statements of Qualifications for design-build services to construct the UWMC NW OPMC MRI Suite, with a virtual pre-submission meeting on November 10, 2026 and SOQs due December 3, 2026 at 3:00 PM. The University will shortlist three to four finalists to respond to a Request for Proposals, with in-person interviews on January 20–21, 2027.
The three-phase project relocates the Blood Draw Stations and Physical Therapy check-in area, then demolishes, renovates, and builds a new first-floor MRI suite at OPMC. The suite includes two MRI exam rooms, a shared control room, MRI equipment rooms, patient preparation and holding areas, offices, toilet and storage rooms, and mechanical, electrical, and plumbing improvements. It will house a new 1.5T MRI unit initially, with infrastructure for a future 3T unit. The work proceeds within a fully operational outpatient facility.
Proposers must comply with RCW 39.04.350 and 18.27 RCW and demonstrate bonding capacity for the $4.5 million target Design-Build budget. Required experience includes design and renovation within fully operational outpatient facilities, innovative solutions within existing facility constraints, and coordination with specialized healthcare equipment vendors, applying Progressive Design-Build best practices. The University is procuring under the Design-Build alternative public works procedure in Chapter 39.10 RCW.
The total project budget is $6.3 million, with the target Design-Builder services budget at $4.5 million exclusive of Washington State sales tax. Unsuccessful finalists receive a $2,500 honorarium.
Evaluation criteria are Team Members (30 points), Design-Build Process (30 points), Partnership (20 points), Construction Site Safety (10 points), and Business Equity (10 points), with Bonding and Insurance evaluated pass/fail.
Contract execution is anticipated February 12, 2027. Design runs February through July 2027, construction August 2027 through June 2028, and closeout June 2028 through February 2029.
Opportunity text
This project will include a three-phase delivery: relocation of the Blood Draw Stations and Physical Therapy (PT) check-in area, followed by construction of a new MRI Suite on the first floor of OPMC. The scope includes demolition, renovation, and construction of a new MRI Suite with two MRI exam rooms, shared control room, patient support spaces, and associated infrastructure upgrades. The project includes installation of a new MRI unit and supporting infrastructure for a future 3T MRI. The project will also evaluate and implement facility upgrades to support operational needs.
Files
| File | Type | Posted |
|---|---|---|
| 208696 A3 Reqeust for Qualifications - Final.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity