RFQ Reverse Osmosis System Modifications

Open State & local contract opportunity Posted

Solicitation number
36C26327Q0053
State
Minnesota
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Hennepin County, Minnesota is requesting quotes for reverse osmosis system modifications at a healthcare facility, with quotes due October 23, 2026. The scope involves separating and reconfiguring critical water loops for Laboratory and Sterile Processing Service (SPS) operations, with work performed from November 1, 2026 through January 31, 2027.

The project requires cutting and bypassing two unused laboratory sinks to eliminate dead legs from the existing Deionization critical water loop, then tying the SPS Deionization water loop into the Reverse Osmosis critical water loop so that SPS operates entirely on the RO system. The awardee must install a new ultraviolet sterilizer and multi-cartridge filtration system on the RO critical water loop to add an additional filtration level. The scope includes installing all required testing ports on the RO system and steam sterilizers to comply with ST108 testing standards. The NIGP category is 238220, Plumbing, Heating, and Air-Conditioning Contractors. A detailed specification document (36C26327Q0053.pdf, 366 KB) is attached to the solicitation.

Opportunity text

238220 - Plumbing, Heating, and Air-Conditioning Contractors. The objective with this project is to separate the Laboratory and Sterile Processing Service (SPS) Deionization (DI) critical water loop and tie in the SPS DI water loop to the existing Reverse Osmosis (RO) critical water loop. This would put SPS entirely on the RO critical water loop, and the Laboratory would be on the DI critical water loop. Cutting and bypassing the two sinks in the lab that do not get used, will remove these two dead legs from the DI critical water loop. This project will also add an additional level of filtration by installing a new Ultraviolet (UV) sterilizer and multi-cartridge filtration system on the RO critical water loop as well as adding all the required testing ports to the RO system and the steam sterilizers as required by ST108 testing standards. The period of performance is 11/01/2026 to 01/31/2027.

Files

File Type Posted
36C26327Q0053.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity