RFQ For Engineering Services of Little Bear Creek (Bedford Road Bridge) Project
Closed State & local contract opportunity Posted
- Solicitation number
- RFQ-2026-002
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Elijah Dorminy edorminy@colleyville.com (817) 503-1104
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Colleyville is requesting qualifications for final design and engineering services on the Little Bear Creek (Bedford Road Bridge) Local-Let TxDOT project, with statements of qualification due September 29, 2026 at 2:00 p.m. Respondents must demonstrate 5+ years of experience in local-let TxDOT roadway projects with specific expertise in bridge design meeting TxDOT standards and hold proper professional engineering registration in Texas.
The scope encompasses project management, data collection and preliminary engineering, environmental and right-of-way support, structural and roadway design, and final Plans, Specifications, and Estimates package development with construction phase services. The project involves reconstruction of a bridge crossing Little Bear Creek on Bedford Road between Saddlebrook Drive and Somerset Boulevard, along with adjoining roadway alignment modifications to bring the roadway and bridge deck elevations at or above the floodplain. Design deliverables are structured in four milestones: 30% design criteria, 60% preliminary plans, 90% near-final plans, and 100% final PS&E package.
Pricing, fees, and contract duration will be negotiated with the selected firm based on fair and reasonable rates; the City will not provide compensation or defray proposal development costs. Firms must provide verifiable examples of at least three similar projects completed within the previous five years.
Selection criteria are weighted as follows: Project Manager experience with similar projects (25%), team member experience (25%), ability to meet deadlines (20%), firm experience with public engagement (15%), project understanding and approach (10%), and TxDOT experience (5%). Written questions are due September 17, 2026 at 5:00 p.m., with responses provided by September 18. The Selection Committee will evaluate and rank SOQs by October 13, with contract negotiation targeted for October 20 and anticipated award on November 4, 2026, subject to successful negotiations and City Council approval. Respondents must submit SOQs electronically through Civcast USA, limited to 30 letter-size pages, and complete Conflict of Interest Questionnaires and Texas Ethics Commission Certificate of Interested Parties forms.
Opportunity text
The City of Colleyville is seeking the services of qualified consultants for the final design and engineering of the Little Bear Creek (Bedford Road Bridge) Local- Let TxDOT project. Statements of Qualification (SOQ) will be evaluated in accordance with the criteria set forth within this RFQ.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity