RFQ 2025-06 WaterSMART Consultant
Closed State & local contract opportunity Posted
- Solicitation number
- RFQ 2025-06
- State
- Colorado
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 890 Water Supply, Groundwater, Sewage Treatment, And Related Equipment, Not For Air Conditioning, Steam Boiler, Or Laboratory Reagent Water
- 925 Engineering Services, Professional
- 926 Environmental And Ecological Services
- 968 Public Works And Related Services
- 989 Sampling And Sample Preparation Service, For Testing
- UNSPSC codes
- 81103300 Geomatics engineering
- 77110000 Environmental protection
- 77000000 Environmental Services
- 30121722 PE rainwater and sewer separation walls
- 81103402 Front-end engineering design services
- 81103403 Detailed engineering services
- 81103405 Onshore engineering procurement and construction services
- 76100000 Decontamination services
- 76130000 Toxic and hazardous waste cleanup
- 31250000 Pneumatic and hydraulic and electric control systems
- Points of contact
Opportunity details come from bidnetdirect.com. Updated .
About this opportunity
The Town of Paonia, Colorado, is issuing a Request for Qualifications (RFQ 2025-06) to solicit consulting firms for developing a comprehensive Water Strategy under the Bureau of Reclamation's WaterSMART Grant Agreement. The procurement seeks an experienced consultant to conduct extensive water resource planning, including stakeholder outreach, technical analyses of the watershed, raw water collection system, hydraulic capacity, water rights portfolio, and metering needs. Key deliverables include preparing a Water Strategy document that encompasses outreach summaries, problem statements, project alternatives, implementation strategies, and lessons learned. The project is structured to address water supply challenges, infrastructure needs, and long-term water system resiliency, with specific focus on technical feasibility, financial impact, regulatory compliance, and community priorities. The RFQ was posted on August 28, 2025, with proposals due by September 29, 2025, at noon Mountain Time. The project timeline is scheduled from late 2025 through September 2027, with an anticipated revision of original project milestones. Consultants must demonstrate expertise in water resource management, stakeholder engagement, technical analysis, and strategic planning.
The RFQ does not explicitly specify set-aside designations or restrictions on responding organizations. The total estimated project cost is $511,876.00, with $250,000.00 in federal funds available through the Bureau of Reclamation's WaterSMART Grant Agreement (R24AP00466). The project will specifically address Paonia's water management challenges, including declining snowpack, reduced summer flows, and vulnerability to drought and wildfire. The selected consultant will be responsible for comprehensive engagement with various stakeholders, including agricultural users, community organizations, water districts, and public land managers. While no incumbent vendors are mentioned, the project requires integration with existing water infrastructure and consideration of current regulatory and institutional requirements. The consulting firm will need to develop a roadmap for water infrastructure improvements that prioritizes drought resilience and sustainable water management strategies. Potential respondents should be prepared to provide detailed technical and financial assessments that align with the town's water resource objectives.
Opportunity text
The Town of Paonia, Colorado, is issuing Request for Qualifications (RFQ 2025-06 WaterSMART Consultant) to solicit Statements of Qualifications (SOQs) from experienced consulting firms to assist in the development of a comprehensive Water Strategy under the Bureau of Reclamation's WaterSMART Grant Agreement R24AP00466 (Attachment A). This federally funded initiative will provide Paonia with a structured planning process to identify water supply challenges, assess infrastructure needs, and develop prioritized strategies for long-term water system resiliency. The Water Strategy will integrate technical analyses, stakeholder input, and regulatory requirements into a forward-looking plan that positions the Town for successful implementation of water infrastructure improvements. The consultant selected through this RFQ will be responsible for: • Conducting outreach and partnership building to engage stakeholders, including agricultural users, community organizations, water districts, public land managers, and residents. • Completing technical analyses of Paonia's watershed, raw water collection system, hydraulic capacity, water rights portfolio, and metering and monitoring needs. • Researching legal, regulatory, and institutional requirements for future implementation projects. • Developing and comparing project alternatives based on technical feasibility, financial impact, compliance needs, and community priorities. • Preparing a Water Strategy document that includes an outreach summary, statement of problems and needs, project alternatives and prioritization, implementation strategies, and lessons learned. The project milestones, originally structured from late 2024 through September 2026, will be updated to reflect a revised timeline beginning in late 2025 and extending through September 2027. The Town will seek an official update to the project schedule from the Bureau of Reclamation to ensure that all milestones, including environmental and cultural compliance, stakeholder engagement, technical investigations, comparative analysis of alternatives, and completion of draft and final Water Strategy deliverables, are achieved in full compliance with program requirements. Through this process, Paonia will establish a clear roadmap to secure, manage, and optimize its water resources. The resulting Water Strategy will guide future infrastructure investments, strengthen drought resiliency, and ensure the Town can continue to provide reliable and sustainable water service for its community.
Files
| File | Type | Posted |
|---|---|---|
| RFQ 2025-06 WaterSMART Consultant_f.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity