Rfpq for capital project on a design-build basis

Open State & local contract opportunity Posted

Solicitation number
RFP OVS 270000000296 1
State
Michigan
Responses due

Opportunity facts

Jurisdiction
NIGP code

Updated .

About this opportunity

Orchard View Schools, a Michigan school district, is soliciting design-build qualifications and proposals for HVAC replacement and roofing at Cardinal Elementary School in Muskegon County, with a mandatory pre-bid meeting on November 20, 2026 and proposals due December 2, 2026 at 2:00 p.m. The project is state-financed and subject to Michigan prevailing wage requirements, and the mandatory pre-bid walkthrough at Cardinal Elementary is a gating step for bidders.

Bonding and insurance requirements are substantial. The successful design-builder must furnish performance and payment bonds equal to 100 percent of the total contract price, commercial general liability coverage of $2 million per occurrence and $4 million aggregate, automobile liability of $1 million, professional liability of $2 million, and an umbrella or excess policy of $5 million. The design-builder must also provide a minimum one-year warranty on equipment, materials, design, and workmanship from the date of beneficial use.

The scope covers replacement of select unit ventilators, air handling units, rooftop units, and exhaust fans with related controls integration, plus replacement and/or re-covering of approximately 121,000 square feet of roofing, of which roughly 20,000 square feet is already complete. Work must not interfere with school operations. Any work not completed during summer recess must be performed around instructional periods, after regular school hours, on weekends, or on holidays as the Owner approves. Substantial completion is due August 12, 2027, and the premises must be fully available for instruction by August 28, 2027.

Vendors must price the work on a Cost-Plus with Guaranteed Maximum Price (CP-GMP) basis, with a lump-sum preconstruction fee and percentage-based development fee, contingency, construction management fee, and overhead and profit on hard and soft costs. The agreement price is a fixed GMP, set through the preconstruction fee and a later GMP amendment that follows competitive trade bidding. Progress payments are due within thirty days of invoice, with 10 percent retainage held until final acceptance and punch list completion. The design-builder absorbs costs above the GMP except for approved change orders, and savings, including unused contingency and allowances, accrue to the Owner. Proposals remain firm for ninety days, and the Owner may reject any or all proposals and award to other than the lowest bidder.

Written questions are due November 24, 2026. The Board of Education is scheduled to approve design-builder selection on December 14, 2026, with design and collaboration beginning in early January 2027.