- RFPQ FOR CAPITAL PROJECT ON A DESIGN-BUILD BASIS
- Solicitation number
- RFP OVS 270000000296 1
- Issued by
- Muskegon County, Michigan
About this file
This is a Request for Qualifications and Proposals (RFQ/P) issued by Orchard View Schools, a Michigan school district, for a design-build capital improvement project. The solicitation seeks qualified design-builders to design and implement building improvements including HVAC replacement and roofing work at Cardinal Elementary School. The specific scope includes replacement of select unit ventilators, air handling units, roof top units, and exhaust fans with related controls integration, as well as replacement and/or re-covering of approximately 121,000 square feet of existing roofing (with roughly 20,000 square feet already completed). The mandatory pre-bid meeting is scheduled for November 20, 2026 at 10:00 a.m. at Cardinal Elementary. The deadline for written questions is November 24, 2026, and proposals must be received by 2:00 p.m. on December 2, 2026. The Board of Education meeting for design-builder selection approval is scheduled for December 14, 2026. Design and collaboration are intended to begin in early January 2027, with all school spaces available June 11 through August 12, 2027, and all classrooms available by August 28, 2027. Proposals remain firm for ninety days following submission.
The project is state-financed and subject to prevailing wage requirements under Michigan law. Vendors must submit pricing using a Cost-Plus with Guaranteed Maximum Price (CP-GMP) model with breakdowns for pre-construction services (lump sum fee), development fees (percentage of hard and soft costs), contingency (percentage of hard and soft costs), construction management fees (percentage of hard and soft costs plus prior fees), and overhead plus profit (percentage of hard and soft costs plus all prior fees). The successful vendor must obtain performance and payment bonds equal to 100 percent of the total contract price, procure commercial general liability insurance of $2,000,000 per occurrence, automobile liability insurance of $1,000,000, professional liability insurance of $2,000,000, and an umbrella or excess liability policy of $5,000,000. All work must comply with Michigan prevailing wage laws, and the vendor must provide a minimum one-year warranty on all equipment, materials, design, and workmanship from the date of beneficial use. The Owner reserves the right to reject any or all proposals and award the contract to other than the lowest bidder.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Form of Design-Build Agreement 4923-2990-1280 v.1 (2).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Orchard View Schools
Request For Proposals
For
Capital Improvement Project
On A
Design Build Basis
Issued: Friday, November 13, 2026
Michigan School District
RFQ/P for Design-Build Capital Improvement Project
Orchard View Schools (the “Owner”) is requesting detailed proposals for the implementation of building, energy, operational or otherwise, improvements under a solicitation consistent with the requirements set forth under MCL 388.851a. The Owner’s objective in issuing this RFQ/P (Request for Qualifications
/Request for Proposal) is to obtain competitive bids from qualified providers by which it may select one or more performance contractors (hereinafter the “Vendor” or “Design-Builder”) to design and manage the implementation of the project(s) outlined by the Owner’s design-build criteria developer and priced in accordance with MCL 380.1274a (the “Project”). Any Vendor herein must be and satisfy the definition of a
“Qualified Provider” under MCL 380.1274a(10)(b).
The Owner intends to satisfy the competitive bidding requirements of MCL 380.1267 by obtaining competitive bids on all of the material and labor required for the Project through publicly advertised trade
(subcontractor) bid packages. The Design-Builder will assist the Owner in preparing the trade bid packages, and the successful trade bidders' contracts will be assigned to, and assumed by, the Design-Builder, which shall be fully responsible for the performance of all assigned trade contractors as its subcontractors.
The Project is state financed and is subject to prevailing wage requirements. Vendors are therefore given notice that all contract language required under all applicable laws, rules, regulations and ordinances with respect to compliance with the applicable prevailing wage laws shall be incorporated into any contract between the Owner and the selected Vendor.
In general, the components and requirements of the Project are:
1. Provide a comprehensive design-build program for Orchard View Schools that may include installation of improvement projects outlined in the design-build criteria (Attachment A). The specific nature of the improvement projects is left to the Vendor’s judgment but must be clearly identified in your proposal.
2. An acknowledgment that the vendor has carefully examined the instructions and specifications contained in the RFQ/P and that all terms contained therein are fully incorporated into the Proposal.
(Attachment B).
3. Proposal to be signed by an authorized company official and each proposal must contain a sworn and notarized affidavit that no familial relationship exists between the owner(s) or any employee of the Vendor and any member of the Board of Education or Superintendent of the Owner as set forth in Attachment C. The Owner will not accept a Proposal that does not include this sworn and notarized statement.
4. In accordance with Michigan Public Act No. 517 of 2012, all Proposals must be accompanied by a certification that the Vendor is not an Iran Linked Business. The Owner will not accept a Proposal that does not include this certification. The Affidavit of Compliance – Iran Economic Sanctions Act is attached to this RFQ/P as Attachment D.
5. As required in MCL 388.851a, the Vendor shall provide all services identified under 1937 PA 306 and/or MCL 339.2011 that may or must be performed by an architect or engineer. To the extent possible, the specifications for the Project shall be generic in character and shall not include proprietary equipment or technology developed by the Vendor or in which the Vendor has an interest.
6. An assurance that all work shall be performed in accordance with all applicable laws, rules, regulations, codes and standards.
7. Provide a minimum one (1) year warranty on all equipment, materials, design and workmanship from the date of beneficial use by the Owner.
SCOPE OF SERVICES
It is assumed that any proposal submitted will include, but shall not necessarily be limited to, the performance of all of the activities listed below. The Owner will consider alternate proposals; however, the proposal must clearly indicate any activities that have been deleted and/or added from the requested scope of services. References to the “Vendor,” “Design-Builder,” “Architect,” “Designer” or other similar term shall all be intended to refer to the entity submitting a response to this RFQ/P.
1. Programming Phase
a. Assist in developing a construction program and Project scopes and establishing an estimated cost of each desired improvement in accordance with MCL 339.2011 (which cost estimating obligation shall continue after programming).
b. Attend meetings and make presentations concerning the Project.
2. Design Phase Services
a. Develop Preliminary Design including, but not limited to, Space Planning, Schematic Design and
Design Development specific to the Project.
b. Complete Final Design including, but not limited to, working drawings, specifications, cost estimates, prospective bidders list, approvals (State and local authorities), technical addenda and clarifications for all of the following, as applicable for each particular project:
i. Structural Design
ii. Architectural Design
iii. Mechanical Design
iv. Electrical Design
v. Civil Design
vi. Technology Design
c. Attend meetings with each committee to develop goals, explain options, and reach consensus on final plans.
d. Provide copies of meeting minutes for distribution to appropriate staff and Board members.
e. Review the construction schedule.
f. Review an occupancy schedule to be implemented upon substantial completion of construction.
g. Produce and review projected cash flow schedules for all aspects of the Project.
h. Review commissioning options with the Owner and incorporate appropriate commissioning duties into the plans and specifications.
i. Advise the Owner as to necessary building permits and other governmental agency approval applications.
j. Prepare trade bid packages for all material and labor for the Project; assist the Owner in advertising, receiving, and publicly opening trade bids in accordance with MCL 380.1267; review bids and recommend award to the lowest responsible bidder for each trade; and accept assignment of the awarded trade contracts as described in this RFQ/P.
3. Construction Phase Services
a. Prepare for and commence construction, construction draw, and occupancy schedules.
b. Propose change order requests, subject to Owner approvals.
c. Review shop drawings and expedite the review process.
d. Review payment and cost control procedures, including the following:
i. Subcontractors’ Schedule of Values, if applicable
ii. Subcontractors’ Payment Application and Certification, if applicable
iii. Subcontractors’ Sworn Statements and Waivers of Lien, if applicable
iv. Purchase Order and disbursement Summaries
v. Change Order Listings
vi. Budget Cost Summary Reports
e. Participate in progress meetings and provide progress reports of same.
i. As needed, meet with the Owner’s Project Representative to discuss any activities which may affect operations.
ii. Weekly meeting with Owner representative and trade contractors.
iii. Monthly meetings for planning, coordination, and payments with Owner administrators which will include status reports on the Project, budget, change orders, and allowances for reimbursable expenses.
f. Prepare as-built drawings and record and review operating and maintenance manuals, warranties, guarantees, and Project directories.
g. Ensure that all construction is completed as specified by the construction documents and meets all codes and regulations of agencies having jurisdiction.
h. Provide review and coordinate Project commissioning.
i. Prepare and complete punch lists, coordinate final inspections, and recommend Owner acceptance and occupancy.
4. Post-construction Phase Services
a. Assist in conducting training sessions for appropriate employees regarding the operation and maintenance of technical equipment. Record a training session on video for the Owner’s future use.
b. Provide staff readily available during three-month adjustment period as staff and students become accustomed to new surroundings.
c. Provide follow-up for the duration of the longest warranty period covered by the Project.
DETERMINATION FOR AWARD
The Owner intends to select the Design-Builder that best fits its interest, as determined by the Owner in its sole discretion.
TECHNICAL QUALIFICATIONS:
1. Corporate background, company name and address of firm. Please identify (address and phone number) the corporate office and other local (Michigan) offices.
2. Firm experience delivering projects similar to those identified in Attachment A.
3. Team members assigned to the project upon award. Provide resumes of key personnel including relative project experience consistent with the items identified in Attachment A.
4. Evidence that the Vendor can secure a performance and payment bond for the full amount of the contract.
5. Vendors shall submit a written summary and explanation of any outstanding litigation that may impact Vendor’s ability to perform its obligations under the Contract.
PROJECT UNDERSTANDING & APPROACH
1. Provide clarity of project understanding including any previous engagement and relevant information specific to the Owner and sites included for consideration.
2. Provide information outlining the proposed methodology the team would use in completing the projects considered under this Proposal. Outline the project management plan, corresponding schedule and responsibilities of both Owner and Vendor.
3. Include any perceived improvements above those listed in Attachment A specifically identifying how the Vendor will approach additional innovative opportunities identified during the development of the Project.
PROJECT CLOSE-OUT & POST CONSTRUCTION SUPPORT SERVICES
1. Provide a detailed explanation of the training program to be provided to the Owner for each system upon installation of the Project to ensure full understanding of the systems upon turnover.
2. Outline the commissioning approach to be carried out by the Vendor and/or its subcontractors to ensure the systems are operating per the requirements set forth in Attachment A.
3. Though not an energy savings contract, the Owner may consider energy and operational savings associated with the Project. Identify the capabilities to provide measurement and verification of the energy and operational savings opportunities associated with the improvements outline in the Project. The Proposal should include any methodologies commonly provided by the Vendor including any protocols and standards utilized, methodology for determining baseline energy and operational costs and ongoing measurement strategies that could be included.
COST CONTROL STRATEGY & PRICING
1. Describe how the Vendor will assist the Owner in preparing, advertising, and evaluating the trade bid packages for all material and labor for the Project, and in obtaining competitive pricing for equipment, consistent with MCL 380.1267 and the trade-bid and assignment process described in this RFQ/P.
2. Include a description of how change orders will be managed by the Vendor to ensure the Owner has transparency over any future costs associated with implementing the Project.
3. Cost-Plus with GMP Cap (CP-GMP): Provide a breakdown of the pricing model of fees to be included under a cost-plus arrangement including:
a. Pre-Construction Services: Lump Sum Fee
b. Development Fees: Percentage of Hard + Soft Costs
c. Contingency: Percentage of Hard + Soft Costs
d. Construction Management Fees: Percentage of Hard + Soft Costs + (a) thru (c) above
e. Overhead + Profit: Percentage of Hard + Soft Costs + (a) thru (d) above
Provide a statement on how the Vendor determines Hard + Soft Costs to capture savings and risks from subcontractors and vendors above the fees listed above. Additionally, provide clarification notes regarding how the Vendor will manage future scope of work changes if the project incurs additional costs through the final development of the project.
INSTRUCTIONS FOR SUBMITTING PROPOSALS
1. RFQ/P TIMELINE
The Owner expects to undertake the selection process described below according to the following schedule. Notwithstanding the foregoing, the Owner reserves, the right, in its sole and absolute discretion, to make modifications to or alter the following schedule as it determines to be in its best interests.
TIMELINE OF EVENTS
Item # Description Date of Event
1. Post Notices (Website & Newspaper (2 Weeks)/Issuance of RFQ/P November 11, 2026
2. Mandatory Pre-Bid Meeting held at Cardinal Elementary; 2310 Marquette Avenue, Muskegon, MI 49442
November 20, 2026, 10: 00 am
3. Deadline for Questions November 24, 2026
4. Proposal Response Deadline 2 P.M. December 2, 2026
5. Board Meeting for Design-Builder Selection Approval (Optional:
And approve Pre-Construction Services Agreement)
December 14, 2026
2. PROPOSAL SUBMISSION
All Proposals must be delivered to and received by the Owner on or before 2 p.m. on Wednesday, December 2, 2026 (the “Due Date”). Each Vendor is responsible for submission of its Proposal.
Proposal or Proposal revisions received after the Due Date will not be accepted or considered. The Owner is not liable for any delivery or postal delays. All Proposals received after the Due Date will be unopened and made available to the respective Vendor for pick-up, at their sole cost and expense for a period of two (2) weeks.
Vendors shall submit one (1) originally signed proposal and three (3) copies, along with one (1) copy on a flash drive in “pdf” format. Proposals shall be sealed. NO ORAL, FAX or E-MAILED Bids will be accepted. Proposals must be delivered to and addressed as follows:
Orchard View Schools 35 South Sheridan
Attention : Thomas Hamilton- Superintendent Muskegon, MI 49442
RFQ/P Response for a Capital Improvement Project on a Design Build Basis
3. ADDITIONAL QUESTIONS OR REQUESTS FOR CLARIFICATION
Prospective Vendors may request that the Owner clarify information contained in this RFQ/P. All such requests must be made in writing via email and addressed to Brian Ingalls at Brian@iec.pe The Owner will attempt to provide a written response to all written Requests For Clarification within three (3) business days after the receipt of such request. The Owner will not respond to any Request For Clarification received after 10 am on November 24, 2026. Requests For Clarification and inquiries must be made via e-mail. All Requests for Clarification must be directed to (Subject Line: Design-Build RFQ/P Request for Clarification). Answers will be provided to all known Vendors who requested or received a copy of the RFQ/P and attended the mandatory Pre-Bid Meeting.
4. IRREVOCABILITY OF PROPOSALS
Any Proposal may be withdrawn or modified in writing by the Vendor, provided such withdrawal or modification is received by the Owner prior to the Due Date and time established for receipt of Proposals. Proposals not withdrawn by the requested due date shall constitute a firm offer to provide the services contained therein and shall remain firm for acceptance for ninety (90) days.
Submittal of an un-withdrawn proposal shall constitute a presumption that all aspects of the scope of work are included in that proposal.
5. COSTS
The cost of preparing a response to this RFQ/P, including site visits, investigations and studies, are the Vendor’s sole responsibility and will not be reimbursed by the Owner in the event the Owner elects not to go forward with the Contract.
6. RELEASE OF CLAIMS
The Vendor by its submission of its proposal releases the Owner and its Board of Education, officers, and employees from any claims arising out of, and related to, the RFQ/P process and selection of a Vendor.
7. RESERVATION OF RIGHTS
The Owner reserves the right, in its sole and absolute discretion (for this provision and all other provisions contained in this RFQ/P), to accept or reject, in whole or in part, any or all proposals with or without cause. The Owner further reserves the right to waive any irregularity or informality in the RFQ/P process or any proposal, and the right to award the Contract to other than the Vendor submitting the best financial proposal (low bidder). The Owner reserves the right to request additional information from any or all Vendors. The Owner reserves the right to award the work to one or more Vendors. In the event a Vendor’s proposal is accepted by the Owner and that Vendor asserts exceptions, special considerations or conditions after acceptance, the Owner, in its sole and absolute discretion, reserves the right to reject the proposal and award the Contract to another Vendor. Owner expressly reserves the right to implement the improvements included in Vendor’s proposal in one (1) or more phases.
8. COLLUSIVE BIDDING
The Vendor certifies that its proposal is made without any previous understanding, agreement or connection with any person, firm or corporation making a proposal for the same work and is in all respects fair, without outside control, collusion, fraud or otherwise illegal action.
9. FINALITY OF DECISION
Any decision made by the Owner including the Vendor selection, shall be final.
RFQ/P AND CONTRACT TERMS AND CONDITIONS
The form of design-build agreement the Owner will use for the Project is attached as Attachment E (the
“Form of Agreement”). Vendors must identify any exceptions to the Form of Agreement in their Proposals, as provided in Attachment B; otherwise, the Vendor will be deemed to have accepted the Form of
Agreement in its entirety. Notwithstanding the foregoing, the Owner reserves the right to further modify the
Form of Agreement in its sole discretion. Selection of a Vendor, or Board of Education action approving a selection, does not create a contractual relationship between the Owner and the Vendor. No contract shall exist until the final written agreement is approved by the Board of Education and signed by both parties.
INSURANCES
The successful Vendor shall procure and maintain during the life of the agreement the following insurance coverage from a company or companies licensed to sell insurance in Michigan with an A- or better A.M.
Best rating, or equivalent: Workers’ compensation in compliance with Michigan law; Commercial General
Liability Insurance in the amount of $2,000,000 each occurrence for Bodily Injury Liability and Property
Damage Liability; automobile liability insurance of $1,000,000 combined single limit; and professional liability (errors and omissions) insurance of $2,000,000 per claim covering the design services, maintained for at least six (6) years after final completion if written on a claims-made basis. In addition, the successful vendor will procure and maintain an Umbrella or Excess Liability policy in the amount of $5,000,000. Such insurance will protect the Vendor and the Commercial General Liability and Umbrella/Excess Liability shall list the Owner as additional insured.
The insurance required shall be maintained without interruption from date of commencement of construction under the Contract until the expiration of the warranty period, or guarantee period, if applicable.
All certificates of insurance must be forwarded to the Owner prior to commencement of any work. Required insurance policies shall not be canceled without thirty (30) days prior written notice to the Owner.
BONDS
In compliance with Act 213, Public Acts of Michigan of 1963, as amended, the successful vendor shall execute performance and payment bonds acceptable to the Owner. One bond will be for the faithful performance and fulfillment of the Contract and to include protection of the Owner from all liens and damages arising out of the work. The other bond will be conditioned for the payment of labor and materials used in the work and for the protection of the Owner from all liens and damages arising there from. Each of the bonds will be in the amount of one hundred percent (100%) of the total amount of the Contract price, through execution of the final acceptance certificate for the project. The bonds shall cover all work under the Contract, including work performed by assigned trade contractors.
INDEMNIFICATION
The Vendor shall indemnify, defend, and hold harmless the Owner and its Board of Education, officers, employees, and agents from and against all claims, damages, losses, and expenses, including attorney and expert fees, arising out of or related to any negligence, wrongful act, or breach of contract by the
Vendor, its design consultants, its subcontractors (including assigned trade contractors), or anyone for whom the Vendor is responsible. Nothing in the RFQ/P or the Contract shall be deemed a waiver of any immunity granted to the Owner by law, including governmental immunity under MCL 691.1407.
SUBCONTRACTING
In the execution of the Contract, it will be necessary for the Vendor to sublet part of the work to others, and trade contracts bid by the Owner will be assigned to the Vendor as described in this RFQ/P. The Vendor shall be fully responsible to the Owner for the acts and omissions of its design consultants and subcontractors, including assigned trade contractors. Nothing in this RFQ/P or in the Contract shall create any contractual relationship between any subcontractor and the Owner. The Vendor shall not assign, transfer, convey, or otherwise dispose of this Contract, or any part thereof, or the firm’s right, title, or interest in the same or any part thereof, without the previous written consent of the Owner.
EQUAL EMPLOYMENT OPPORTUNITY
The Vendor shall warrant and represent that it is an equal opportunity employer and that it does not unlawfully discriminate or discriminate against anyone due to race, creed, color, age, sex, national origin, disability or handicap.
REMOVAL OF EMPLOYEES
The Owner shall retain the right, in its reasonable discretion, to have any employee of the Vendor or any subcontractor removed from the project.
ONE (1) YEAR WARRANTY
The successful Vendor shall provide an industry standard warranty that will, at a minimum, guarantee all materials and workmanship against defects arising from normal usage for a minimum period of one (1) year from the date of Owner’s beneficial use of the equipment.
OWNER’S RIGHT TO CORRECT DEFICIENCIES
If the Vendor shall neglect to execute the work properly or should refuse to remedy any defects in the work due to inferior quality of workmanship or material, or should in any manner fail to perform any provision of this Contract, the Owner, after thirty (30) days advance written notice to the Vendor, may correct such deficiencies and may deduct the cost thereof from payment due the Vendor.
COMPLIANCE WITH LAW AND STANDARD PRACTICES
The Project and all Vendor services shall comply with all applicable Federal, State, and Local laws, statutes, acts, rules, regulations, and ordinances. The Vendor shall comply with sound engineering and safety practices. The Vendor shall be responsible for obtaining all required construction permits to perform its obligations.
APPROVAL OF EMPLOYEES
The Vendor and its subcontractors shall comply with the criminal history and background check requirements of the Revised School Code, MCL 380.1230 et seq., to the extent applicable, and shall not assign any individual to work regularly and continuously in the Owner’s schools who has been convicted of a “listed offense” as defined in MCL 28.722 or another disqualifying offense under applicable law.
TAXES
Each Proposal submitted shall include and the successful selected Vendor will be required to pay all taxes which are levied by Federal, State or Municipal Governments upon labor, and for material entering into the work.
ASBESTOS
For safety reasons, the selected Vendor must review the Owner’s most recent asbestos management before performing work. It is not anticipated the scope of work includes any asbestos remediation.
USE OF BUILDINGS
The Owner will continue to occupy the buildings and site during the normal school year. Any installation work not completed during the summer recess shall be performed around instructional periods including after regular school hours, on weekends, on scheduled holidays, or as arranged and approved by the
Owner during regular school hours.
CLEANLINESS
The selected Vendor will, at all times, keep the job clean of all debris and rubbish resulting from its operations, and upon completion of its work, will promptly remove all tools, equipment and excess material and any rubbish caused by its work and personnel. Selected Vendor will be responsible for any damage caused by it to the work or property of others, including but not limited to, the property of the Owner.
Selected Vendor will reimburse Owner for any expenses incurred to keep the job clean and clear of all debris and rubbish resulting from Selected Vendor’s failure to comply with this paragraph.
USE OF OWNER PROPERTY
The selected Vendor shall not use or permit any of its employees, contractors, subcontractors or consultants to use any equipment, hoists, staging, scaffolds, or any other material belonging to the Owner without prior written consent.
GOVERNING LAWS
This RFQ/P, and any contract arising from this RFQ/P, shall be governed by the laws of the State of
Michigan. The applicable law for any legal disputes arising out of this RFQ/P or any contract shall be the law of (and all actions hereunder shall be brought in) the State of Michigan, with venue in Muskegon County.
DRAWINGS
The Selected Vendor shall prepare and provide a set of “As-Built” drawings showing changes in the work made during the Project. The Selected Vendor shall certify these drawings as accurate; provided the
Selected Vendor’s certification shall be made to the best of the Selected Vendor’s knowledge.
ATTACHMENT A – DESIGN/BUILD CRITERIA
A. To be Developed on project by project basis
Work would include:
Cardinal Elementary
- HVAC
o Replacement of select unit ventilators, AHU’s, RTU’s, & EFs o Related Controls integration
- Roofing o Replace and/or re-cover 121,000 sq ft of existing roofing. Note approximately 20,000 sq ft of existing has been replaced.
This work scope is being considered as the only phase of work for this RFQ/P. Note that design and collaboration are intended to begin early in January 2027. Additionally note that all spaces of the school will be 100% available June 11, 2027 through August 12, 2027 and it is intended that all classrooms will be 100% available by August 28, 2027.
ATTACHMENT B
Proposer Acknowledgement of RFQ/P Requirements
The undersigned declares that he/she has carefully examined the instructions and specifications contained in the RFQ/P and will furnish the properties and services set forth in its sealed proposal for the price set forth in its sealed proposal.
Any exceptions to the terms and conditions contained in this RFQ/P or the Form of Agreement (Attachment E) or any other special considerations or conditions requested or required by the Vendor MUST be specifically enumerated by the Vendor and be submitted as part of its Proposal, together with an explanation as to the reason such terms and conditions of the RFQ/P cannot be met by, or, in the Vendor’s opinion, are not applicable to, the Vendor. The Vendor shall be required and expected to meet the specifications and requirements as set forth in this RFQ/P in their entirety, except to the extent exceptions or special considerations or conditions are expressly set forth in the Vendor’s Proposal and those exceptions or special considerations or conditions are expressly accepted by the School District. Any exception not so identified is waived. All Pricing factors must be clearly indicated in the Proposal Forms provided as part of the Vendor’s Proposal.
Name of Company:
Address:
City/State/Zip:
Phone/Fax:
Representative/Title:
Signature:
Date:
ATTACHMENT C
FAMILIAL DISCLOSURE AFFIDAVIT
The undersigned, the owner or authorized official of ________________________ (the “Vendor”), pursuant to the familial disclosure requirement provided in the Orchard View School District (the
“Owner”) Request for Qualifications/Proposals for a Capital Improvement Project on a Design-Build
Basis, hereby represents and warrants that, except as provided below, no familial relationships exist between the owner(s) or any employee of the Vendor, and any member of the Board of
Education of the Owner or the Superintendent of the Owner. A list of the Owner’s Board of
Education Members and its Superintendent may be found at https://www.orchardview.org/our-district/board-of-education/
List any Familial Relationships:
Vendor:
By:
Its:
Subscribed and sworn to before me this ____ day of ______________, 20___.
____________________________, Notary Public, State of Michigan, County of ______________.
Acting in the County of ______________. My commission expires: __________.
ATTACHMENT D
AFFIDAVIT OF COMPLIANCE – IRAN ECONOMIC SANCTIONS ACT
Michigan Public Act No. 517 of 2012
The undersigned, the owner or authorized official of the below-named Vendor (“Vendor”), pursuant to the compliance certification requirement provided in the Orchard View School District (the “Owner”) Request for Qualifications/Proposals for a Capital Improvement Project on a Design-Build Basis (the “RFQ/P”), hereby certifies, represents and warrants that the Vendor (including its officers, directors and employees) is not an “Iran linked business” within the meaning of the Iran Economic Sanctions Act, Michigan Public Act
No. 517 of 2012 (the “Act”), and that in the event Vendor is awarded a contract as a result of the aforementioned RFQ/P, the Vendor will not become an “Iran linked business” at any time during the course of performing the Work or any services under the contract.
The Vendor further acknowledges that any person who is found to have submitted a false certification is responsible for a civil penalty of not more than $250,000.00 or two (2) times the amount of the contract or proposed contract for which the false certification was made, whichever is greater, the cost of the Owner’s investigation, and reasonable attorney fees, in addition to the fine. Moreover, any person who submitted a false certification shall be ineligible to bid on a request for proposal for three (3) years from the date it is determined that the person has submitted the false certification.
Vendor:
By:
Its:
Date:
ATTACHMENT E
FORM OF DESIGN-BUILD AGREEMENT
[Attached]