RFP26-032 BATS US17/82 Corridor Study

Closed State & local contract opportunity Posted

Solicitation number
PE-66300-NONST-2026-000000116
State
Georgia
Responses due

Opportunity facts

Jurisdictions
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

Glynn County, Georgia, through its Board of Commissioners and in coordination with the BATS Metropolitan Planning Organization, is soliciting proposals via RFP26-032 for a comprehensive US 17/US 82 Corridor Study. The procurement seeks qualified firms to conduct a detailed traffic and transportation analysis of a critical corridor extending from the Sidney Lanier Bridge to Ratcliff Road, including the US 17/US 82/I-95 interchange, with consideration of connector roads that may alleviate congestion. The primary objectives include collecting and analyzing traffic data, preparing traffic projections based on current and future land use patterns, and identifying operational and capacity improvements needed to address increasing congestion in this economically significant area that serves major trip generators including Jekyll Island State Park, the Georgia Ports Authority's Colonels Island facility, and growing residential development. The final deliverable shall be a detailed corridor analysis that identifies and prioritizes both short-term (0-5 years) and long-term (5+ years) improvement projects, with findings intended to support future project programming in the BATS Transportation Improvement Program and justify capital investments. The analysis must assess both operational efficiency and safety improvements for this vital transportation corridor. Proposals are due on May 13, 2026, with submission required through Glynn County's electronic procurement portal at https://procurement.opengov.com/portal/glynncounty, where interested vendors can register and receive updates on the solicitation.

The request for proposals does not explicitly detail set-asides for disadvantaged business enterprises, minority-owned vendors, or women-owned business enterprises within the available documentation; however, vendors should verify any applicable state and local contracting preferences through the electronic procurement portal or direct contact with Glynn County. No incumbent contractors or existing vendor relationships are identified in the procurement materials provided. The study will require integration with existing data and planning documents, including the 2025 BATS Freight Plan and the 2050 BATS Metropolitan Transportation Plan, indicating that selected firms must coordinate with the BATS MPO and county planning staff. Specific budget ranges or award values are not disclosed in the available documentation; interested firms should access the complete RFP through the procurement portal for detailed budget parameters and evaluation criteria used in the selection process.

Opportunity text

The Board of Commissioners of Glynn County, Georgia (¿the Owner¿) seeks proposals from interested qualified firms to provide a US 17/US 82 Corridor Study, including all the details outlined and required in the Program Services section. Background Glynn County is home to a rapidly expanding population, tourism industry, and the nation¿s busiest port for import and export roll-on/roll-off (Ro/Ro) cargo. The I-95 Exit 29 at US 17/US 82 is the nexus of these trip generators including direct access to the Jekyll Island State Park, the Georgia Ports Authority¿s Colonel¿s Island facility, and a growing residential population. This corridor also connects to the Sidney Lanier Bridge which serves as the primary connection to Downtown Brunswick and St Simons Island. As recommended in the 2025 BATS Freight Plan and the 2050 BATS MTP, Glynn County and the BATS MPO are proposing a study to identify options to alleviate increasing traffic congestion in this important corridor. The proposed study limits extend from the Sidney Lanier Bridge to Ratcliff Rd and US 82 in Glynn County and include US 17/US 82/I-95 interchange. The study will also explore the possibility of improvements to connector roads to alleviate traffic pressure along this corridor. The final product of this study will be a detailed corridor analysis that identifies and prioritizes short-term (0-5 years) and long-term (5+ years) projects aimed at improving the corridor's operation and safety. This comprehensive study will help justify future programming of projects in the BATS MTP and Transportation Improvement Program (TIP), ensuring the County can efficiently manage its growth and maintain a safe, efficient transportation corridor. The study's primary objective is to identify the operational and capacity improvements needed along corridor. It will involve collecting traffic data and preparing projections based on current and future land use to assess the need for improvements.

Files

File Type Posted
GPR attachment.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity