RFP NO. 26-007 Progressive Design Build Services for JWSC Water Production SCADA & Electrical Upgrad

Closed State & local contract opportunity Posted

Solicitation number
PE-66315-NONST-2026-000000020
State
Georgia
Responses due

Opportunity facts

Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

The Brunswick-Glynn Joint Water and Sewer Commission (JWSC) is soliciting Progressive Design-Build (PDB) proposals for electrical system rehabilitation and SCADA installation services across multiple water production facilities in Glynn County, Georgia. The procurement encompasses the rehabilitation or replacement of three complete electrical systems at ten Water Production Facilities (Golden Isles 1 & 2, FLETC, I-95, Brunswick Villa, Brookman, Fancy Bluff, Hampton, Harrington, Airport, and Mallery) and the construction, installation, and programming of nineteen SCADA remote terminal units at these facilities plus eight Elevated Storage Tanks throughout the county. The two-phase delivery method requires Phase One services including design development, alternatives evaluation, cost modeling, constructability review, permitting assistance, risk assessment, and GMP development, with Phase Two encompassing final design completion, equipment procurement, construction, commissioning, and closeout. Key requirements include demonstrated experience with water production SCADA design and implementation, submission of at least three completed projects from the past five years in the Southern United States (with at least two being publicly owned water design-build projects maintaining existing operations during construction), an Experience Modification Rate (EMR) less than 1.0, and key personnel with minimum ten years' experience in SCADA and electrical systems design and construction. Selection criteria are weighted as follows: team qualifications (30 points), technical approach (25 points), project management approach (20 points), relevant project experience (15 points), and fee proposal (10 points). Critical deadlines include a mandatory pre-proposal meeting and site visit on February 24, 2026, at 10:00 A.M. EST at 161 S Harrington Road, St. Simons Island, Georgia (with pre-registration required by February 23, 2026), preliminary questions due by February 21, 2026, at 12:00 NOON EST, final questions due by March 3, 2026, at 12:00 NOON EST, and proposals due by March 24, 2026, at 12:00 NOON EST. Phase One services must be completed within 120 days of agreement execution.

Proposers must submit five paper copies and one electronic version on flash drive, with price proposals in a separate sealed envelope accompanied by a bid bond of not less than 5 percent of the proposed Design Services Price. Financial requirements include submission of two years of reviewed financial statements and proof of aggregate bonding capacity of at least $5 million with single project minimum bonding of $2 million. Selected Design/Builders must comply with Georgia security and immigration requirements, provide e-verify verification, maintain a drug-free workplace, and meet equal employment opportunity standards. Upon selection and successful GMP negotiation, the Design/Builder will execute Phase Two services under an amended contract with Performance Bond and Payment Bond requirements equal to 100 percent of contract price. The RFP does not specify set-asides for disadvantaged enterprises or restrictions on organization types, though all respondents must meet the stated experience and financial qualifications. The total project budget is approximately $2.6 million, including Owner's professional advisory services and other project costs, with JWSC Commission approval anticipated by April 16, 2026, contract execution by May 29, 2026, and Notice to Proceed expected in June 2026.

Opportunity text

Brunswick-Glynn Joint Water and Sewer Commission (hereinafter referred to as ¿Owner¿) is soliciting proposals from qualified Progressive Design-Build (PDB) teams for the rehabilitation or replacement of three (3) complete electrical systems at JWSC Water Production Facilities and construction, installation, and programming of nineteen (19) previously designed SCADA remote terminal units (RTUs) at Water Production Facilities and Elevated Storage Tanks throughout Glynn County. This RFP invites interested Proposers to submit their Qualifications and Cost Proposals to perform the work contemplated for the Project. Proposals shall be prepared according to the requirements set forth in this RFP, including the format and content guidelines in Section 5. The Proposals will be reviewed and evaluated using the selection process described in Section 6. The capitalized terms in this RFP have the meanings as first used in the text of this RFP or as defined in Attachment A (Definition of Terms). The Project is to be designed and constructed in two phases using the progressive Design/Build delivery method: ¿ Phase One: Preliminary Services: Design development, evaluation of alternatives, cost modeling, constructability review, permitting assistance, risk assessment, and development of a Guaranteed Maximum Price (GMP) cost proposal for completion of Phase Two. ¿ Phase Two: Final Design and Construction: Completion of design documents, procurement of equipment and materials, construction, commissioning, and closeout. The Phase 1 services will be performed under an initial contract. Upon successful negotiation of a GMP, the Owner may execute an amendment for Phase 2 services.

Files

File Type Posted
RFP_WSC Progressive Design Build 26_007 Water.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors