RFB-129-25 EDU FFA Camp HVAC Replacement

Closed State & local contract opportunity Posted

Solicitation number
RFB-785-2500000269-4
State
Kentucky
Responses due

Opportunity facts

Jurisdiction
NIGP code

Updated .

About this opportunity

The Commonwealth of Kentucky, specifically the Department for Facilities and Support Services, is soliciting bids for RFB-129-25, an HVAC replacement project located at the FFA Leadership Center Recreation Hall in Hardinsburg, Breathitt County. The procurement involves comprehensive mechanical, electrical, and architectural work, including the installation of a new variable refrigerant flow (VRF) system, replacement of panelboards, LED lighting upgrades, a new voice evacuation fire alarm system, and window and door replacements. The project requires installation of two wall-mounted indoor units per classroom and three fan coil units for the recreation hall, with specific technical requirements detailed in multiple addenda. A mandatory site visit was conducted on November 25, 2024, at 10:00 AM Central Time, located at 111 FFA Camp Road, Hardinsburg. Bids must be submitted electronically through the Commonwealth's eProcurement system by December 10, 2024, at 1:30 PM, with a public bid reading scheduled for 2:30 PM Eastern Time. All bidders must be registered in the Vendor Self Service (VSS) system and submit an Official Bid Document and Bid Bond as a single PDF attachment.

The procurement documents do not explicitly mention specific set-aside designations or restrictions on responding organizations. Plans and specifications are available at no charge through the state plan room website (stateofkyplanroom.com), with contractors having the option to purchase hard copies. The documents do not provide specific award values or explicit budget ranges for the project. No incumbent vendors or current contractors are identified in the provided materials. Bidders must navigate technical specifications including detailed mechanical and electrical drawings that outline extensive requirements for equipment performance, control system integration, and installation standards. Addenda, specifically Addendum One and Addendum Three, provide critical updates and modifications to the original bid specifications, including changes to demolition requirements, unit installations, and condensing unit layouts. Contractors must carefully review all technical documentation, including specification updates for unit masonry, building insulation, and electrical system modifications.

Files

File Type Posted
Final_RFB_785_2500000269_3_SO_FORM.PDF PDF
Addendum Three.pdf PDF
Addendum One .pdf PDF
Final_RFB_785_2500000269_1_SO_FORM.PDF PDF
Final_RFB_785_2500000269_4_SO_FORM.PDF PDF
Addenum Two .pdf PDF
Final_RFB_785_2500000269_2_SO_FORM.PDF PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity