Reverse Osmosis Plant Elements (Membranes)
Open State & local contract opportunity Posted
- Solicitation number
- 27-13-0-2027/NJP
- State
- Florida
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Nancy Palka purchasingmanager@fpua.com (772) 466-1600
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Fort Pierce Utilities Authority is requesting proposals for replacement elements for its Reverse Osmosis Water Treatment Plant, with proposals due October 30, 2026 at 11:00 a.m. EDT. The scope is limited to two standardized DuPont Filmtec membrane elements — the XLE-440 Element and the NF90-400/34i Element — with no substitutions permitted.
Bidders must provide documentation verifying their understanding of the requested products, such as quotes or product specification confirmations. No pre-bid conference is scheduled. The solicitation was broadcast on October 12, 2026 and distributed through DemandStar and the St. Lucie News Tribune. Ten planholders have registered, including Environmental Equipment Services, H2O Innovation, Harrington Industrial Plastics, Hazen and Sawyer, and Dodge Data. eBidding is not available; bids must be submitted in hard copy or through conventional means. A bid bond is not required.
No specific contract value, term, renewal options, or set-aside provisions are stated in the available documentation. The incumbent contractor is not identified.
Opportunity text
Fort Pierce Utilities Authority (FPUA) is accepting proposals for the purchase and delivery of replacement elements for FPUAs Reverse Osmosis (RO) Water Treatment Plant.
Files
| File | Type | Posted |
|---|---|---|
| OpenBids-DemandStar.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity