Illinois Department of Transportation is requesting bids on resurfacing work on US 67 at the median crossover 0.2 miles north of the Greene County line under Contract No. 72E85, Section 83RS-2, with electronic bids due July 31, 2026 at 12:00 p.m. prevailing time through the iCX-Integrated Contractors Exchange system and public bid opening immediately thereafter. The project is located in Sangamon County, District 6.

The work consists of smart overlay and all necessary traffic control. At least one lane must remain open to traffic at all times during construction. The contractor must coordinate with District 6 Bureau of Operations at least 72 hours in advance of beginning work and three weeks prior to implementing any traffic control measures.

A DBE participation goal of 0.00% has been established for this contract. Contractors must submit a DBE Utilization Plan and applicable participation statements as part of their bid.

The contract incorporates the Standard Specifications for Road and Bridge Construction adopted January 1, 2022 (revised January 1, 2026), the Manual on Uniform Traffic Control Devices, and the Manual of Test Procedures for Materials. Specifications include detailed supplemental provisions covering hot-mix asphalt, portland cement concrete, traffic control, and equipment requirements. Contractors must comply with federal and state certifications and prevailing wage requirements for state contracts.

The contract will be awarded to the lowest responsive and responsible bidder in conformity with departmental terms and conditions. The project is funded with construction funds from the Federal-Aid Highway Program.

Opportunity text

This work consists of, but not limited to, smart overlay and all the necessary traffic control. Location: This project is located on US 67, 0.2 miles north of the Greene Co. line.

Files

File Type Posted
ildot 72E85-053.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors