The Illinois Department of Transportation is requesting electronic bids for resurfacing and reconstruction at five locations along IL 127 and Old IL 13 in Murphysboro and Carbondale, with bids due September 18, 2026 at 12:00 p.m. through the iCX system. DBE participation requirements apply.

The scope spans HMA overlay work at Locations 1, 2, and 5 (surface removal, binder and surface courses, shoulders, ADA ramp improvements, pavement markings, and reflective markers); full pavement replacement at Location 3 from the Big Muddy River Bridge to the Shomaker Drive intersection (including earth excavation, PCC pavement, curb and gutter, sidewalk, and storm sewer); and intersection reconstruction at Location 4 (PCC pavement, shoulders, sidewalk, storm sewer, and lighting). The Shomaker Drive intersection may be closed for up to 30 consecutive days. The contractor must maintain at least one lane of traffic throughout construction and coordinate with concurrent Contract No. 78985 (bridge slope repair). Work includes traffic control, detour signage, nine changeable message signs, reflective crack control treatment, and profile diamond grinding for concrete pavement.

Utility coordination is required with Ameren Illinois (gas and electric), City of Carbondale water and sewer, Egyptian Electric Cooperative, and multiple communications providers. The contract is funded through Federal-aid construction funds (STP-0H7D(932)) and is awarded to the lowest responsive and responsible bidder. Special provisions cover concrete quality control, asphalt material cost adjustments, and Federal-Aid construction contract compliance.

Opportunity text

For locations 1, 2, and 5, this project is a standard HMA overlay. The project involves HMA surface removal, HMA binder course, HMA surface course, HMA shoulders, ADA ramp improvements, pavement markings, and raised reflective pavement markers, etc. For location 3, the project is a pavement replacement job from the Big Muddy River to the intersection of IL 127/Old IL 13 with Shomaker Drive. Location 4 includes intersection reconstruction. These locations will include earth ex, PCC pavement, PCC shoulder, curb and gutter, PCC sidewalk, storm sewer, lighting, etc. Locations: This project has five locations. Location 1 is Old 13 (Murphysboro Road) from approx. 50 before Tower Road to New IL 13 in Carbondale. Location 2 is IL 127/Old 13 from Old Brick Road to the east end of the Big Muddy River Bridge. Location 3 is from the west end of the Big Muddy River Bridge to the intersection of IL 127/Old IL 13 with Shomaker Drive in Murphysboro. Location 4 is the intersection of IL 127/Old IL 13 with Shomaker Drive in Murphysboro. Location 5 is IL 127/Old IL 13 from Shomaker Drive to IL 149 in Murphysboro.