Request for Stadium Soil Stabilization

Closed State & local contract opportunity Posted

Solicitation number
RFP-MID-180000002465-1
State
Michigan
Responses due

Opportunity facts

Jurisdiction
NIGP code
UNSPSC codes

Updated .

About this opportunity

Midland Public Schools, located in Michigan, has issued a Request for Proposal (RFP) for a Stadium Soil Stabilization project, with Barton Malow Company serving as the construction manager for bid package 18-101. The procurement seeks a contractor to perform comprehensive soil stabilization services for a stadium facility, with specific technical requirements detailed in the solicitation. A mandatory pre-bid meeting is scheduled for May 9th at 11:00am at the Midland Public Schools Administration Building, located at 600 E. Carpenter St in Midland, Michigan. Sealed bids must be hand-delivered to Mr. Robert Cooper at the same address by May 21st at 10:00am, with an immediate public bid opening to follow. Prospective bidders can obtain additional specifications and project information by emailing Adam Zdrojewski at Barton Malow Company or by accessing a provided Google Forms link. The Board of Education retains significant discretionary rights, including the ability to reject any or all bids, award contracts to non-lowest bidders, accept alternative proposals, and waive procedural irregularities. No fax submissions will be accepted.

The solicitation does not explicitly specify set-aside designations, disadvantaged enterprise requirements, or specific vendor restrictions. No incumbent vendor information is provided within the available documentation. Similarly, the RFP does not outline precise budget parameters, award values, or contract duration specifics. The document indicates that potential bidders should be prepared to demonstrate technical capabilities in soil stabilization methodologies and have experience with stadium infrastructure projects. While financial thresholds are not detailed, interested contractors should be prepared to submit comprehensive technical and cost proposals that meet the project's engineering specifications. The Board of Education's reserved rights suggest a flexible procurement approach that prioritizes technical competence and project feasibility over strict lowest-bid criteria. Interested contractors should carefully review the complete bid package and be prepared to submit detailed technical proposals demonstrating their capacity to execute the stadium soil stabilization project effectively.

Files

File Type Posted
Soil Stabilizatoin.docx DOCX document

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity