Request for Qualifications: Thornton Justice Center Chillers Replacement
Closed State & local contract opportunity Posted
- Solicitation number
- 25-105A
- State
- Colorado
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 95120000 Permanent buildings and structures
- 73120000 Metal and mineral industries
- 40100000 Heating and ventilation and air circulation
- 73110000 Wood and paper industries
- 73000000 Industrial Production and Manufacturing Services
- 40000000 Distribution and Conditioning Systems and Equipment and Components
- 73160000 Machinery and transport equipment manufacture
- 73170000 Manufacture of electrical goods and precision instruments
- Point of contact
-
- Adam Reiner adam.reiner@thorntonco.gov (303) 538-7641
Opportunity details come from bidnetdirect.com. Updated .
About this opportunity
The City of Thornton, located in Adams County, Colorado, has issued a Request for Qualifications (RFQ) for the Thornton Justice Center Chillers Replacement project (Project No. 25-105A), seeking to prequalify mechanical contractors for a comprehensive chiller system replacement. The project involves removing existing air-cooled condensing units and chillers at the Thornton Justice Center (9551 Civic Center Drive) and installing new water-cooled chillers with two potential equipment configurations: Option 1 featuring 320 tons of modular chillers using R-454B refrigerant, or Option 2 with 294 tons of water-cooled chillers using R-513A refrigerant. Contractors must submit comprehensive qualifications by 5:00 PM on August 29, 2025, demonstrating business history, financial resources, safety records, project experience, and workforce capabilities. Evaluation criteria will include technical experience, safety programs, municipal agency collaboration, and overall contractor qualifications. Key requirements include maintaining a three-year average Experience Modification Rating (EMR) of no greater than 1.0, providing detailed project references, and proving technical competence through representative project examples from the provided permit drawing set.
There are no specific set-aside designations mentioned for disadvantaged enterprises in the RFQ documents. Contractors must demonstrate a minimum bonding capacity of $2 million and the ability to bond projects at 100% of construction value. While no incumbent vendors are identified, the project requires integration with existing electrical infrastructure, with plans to reuse existing electrical panels and circuit breakers with minor modifications. Contractors interested in participating must request the RFQ in Word format by emailing adam.reiner@ThorntonCO.gov. The project is designed to comply with 2024 International Mechanical Code, International Energy Conservation Code, and ASHRAE standards, with a focus on maintaining the Justice Center's operational continuity during the replacement process. Although no specific award value or budget range is explicitly stated, the complexity of the chiller replacement and associated infrastructure work suggests a significant municipal investment in modernizing the facility's cooling systems.
Opportunity text
This project consists of removing the existing chillers and condensing units at the Thornton Justice Center (9551 Civic Center Drive), and replacing them with a new modular chiller. A Permit Drawing Set is included (under separate cover) and to be used as the basis of representative project examples to be submitted by the Respondent. Thornton is not seeking fixed cost bids at this time. All prequalified contractors will be invited to bid on the project in a future solicitation. Contractors may request a copy of this RFQ in a Word document for ease of filling this form out. To request a copy in Word send your request to adam.reiner@ThorntonCO.gov.
Files
| File | Type | Posted |
|---|---|---|
| 25-105A Permit Dwgs 7-11-25.pdf | ||
| 25-105A RFQ 8-7-25.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity