Request for Proposals Structured Cabling

Open State & local contract opportunity Posted

Solicitation number
RFP SLKS 270000000322 1
State
Michigan
Responses due

Opportunity facts

Jurisdiction
NIGP code

Updated .

About this opportunity

South Lake Schools (Macomb County, Michigan) is soliciting sealed bids for structured cabling across five school buildings under an FY2027 Request for Proposals, with bids due December 18, 2026 at 9:00 a.m. The project is entirely conditional on written E-Rate funding approval from the Universal Service Administrative Company (USAC), and the District may reduce quantities or cancel if full funding is not received. No set-aside or local-vendor preference is stated.

Scope covers Category 6e unshielded twisted pair cabling with 111 data drops: Avalon Elementary School (18), Elmwood Elementary School (23), Koepsell Early Childhood Center (7), South Lake High School (38), and South Lake Middle School (25). Every material must be itemized with manufacturer part number, unit cost, and quantity, and generic miscellaneous or contingency line items are prohibited. Required deliverables include 100% cable testing with certified equipment, a three-year warranty covering workmanship, components, and performance, and as-built documentation in paper and electronic formats, preferably Microsoft Visio. Workforce requirements include prevailing wage compliance under Michigan Public Act 10 of 2023, criminal background checks under Michigan's School Safety Legislation, picture identification, and sign-in and sign-out at each facility.

Bidders must submit a 5% bid bond or cashier's check of the total base bid if the bid exceeds $31,321.00, plus performance and labor/material payment bonds equal to 100% of the contract amount. Sales tax must be excluded from bids because the District is exempt from federal excise and state sales taxes. The project is funded through the Universal Service Fund under the FY2027 E-Rate program, with invoices not dated or paid before July 1, 2027.

The District will award to the most cost-effective proposal, considering price, product quality, service, delivery, vendor reliability, and experience in educational environments. It reserves the right to split the project among vendors and to modify specifications through written change orders.

The Intent to Bid Form and mandatory facilities walkthrough were due November 20, 2026, at 2:00 p.m., and both precede this summary date. The District anticipates contract execution and implementation schedule approval by January 24, 2027, installation beginning July 1, 2027, and completion by September 30, 2027.

Files

File Type Posted
Appendix F Schedule.pdf PDF
RFPSC South Lake FY27 (1).pdf PDF
FY27 Appendix C.xlsx XLSX spreadsheet