Request for LGI Sound Systems

Closed State & local contract opportunity Posted

Solicitation number
RFP FHP 180000000580 2
State
Michigan
Responses due

Opportunity facts

Jurisdictions
NIGP code

Updated .

About this opportunity

Forest Hills Public Schools issued a Request for Proposal on December 29, 2017, for the design, supply, and installation of Large Group Instruction (LGI) sound systems across sixteen school buildings located in Kent County and Grand Rapids, Michigan. The procurement encompasses sound system equipment, installation, integration, training, and warranty services for three high schools, three middle schools, two 5-6 grade schools, and eight elementary schools. Specific installations are required in gymnasiums, cafeterias/multi-purpose rooms, media centers (at middle, 5-6, and elementary levels), and one mobile presentation cart per building, with some schools requiring multiple gymnasium systems. The vendor must provide a complete turnkey solution including all equipment, cabling, installation, testing, training, and a minimum three-year manufacturer warranty on materials and workmanship, with optional extended warranty pricing for years four and five submitted separately. A mandatory pre-bid walkthrough was held on January 10, 2018, from 1:00 PM to 4:00 PM ET at Collins Elementary, and proposals were due on January 24, 2018, at 2:00 PM ET at the Forest Hills Public Schools Administration Building (6590 Cascade Road SE, Grand Rapids, MI 49546). All proposals must include a signed original, bound printed copies, unbound copies, and electronic files on USB drive, with pricing valid for a minimum of 120 calendar days. The District scheduled a Board award for April 16, 2018, with implementation commencing in June 2018 and completion required by August 1, 2018, prior to the start of the school year. Addendum #1, dated January 19, 2018, clarified that sound damping solutions (wall panels, absorbers, diffusors, ceiling and floor treatments) are required alternates with vendors expected to provide pricing for both basic and enhanced solutions.

The District requires a 5% bid bond or cashier's check and may require performance and payment bonds equal to the total purchase price for projects exceeding $50,000 involving building alterations. Vendors must comply with Michigan school safety legislation and Iran economic sanctions requirements, with penalties of up to $250,000 or twice the contract amount for false certifications; however, the RFP documentation does not identify any specific set-aside designations for disadvantaged enterprises or restrictions limiting responses to particular vendor classifications. No incumbent vendors or current contractors were listed in the procurement documents, and the sound systems are specified as standalone installations not integrated with existing paging or assisted listening systems. The District will provide access to scissor lifts for high-work areas and may adjust purchase quantities upward or downward by 25% without altering unit prices, reserving the right to reject any or all proposals, award to multiple vendors, or select specific equipment from various proposals based on best interests. The exact budget or award value was not disclosed in the available documentation; however, the scope of work across sixteen buildings with multiple systems per location suggests a substantial contract value likely exceeding the $50,000 threshold for performance bond requirements.

Files

File Type Posted
FHPS LGI Sound System Addm 1.pdf PDF
FHPS LGI Sound System RFP.pdf PDF
FHPS LGI Sound System RFP-APP A.xls XLS spreadsheet

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity