Request for Bids For Septic System Installation Related to the 2021 Community Development Block Grant- Neighborhood Revitalization (CDBG-NR) Project

Open State & local contract opportunity Posted

Solicitation number
471-11092026
State
North Carolina
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from evp.nc.gov. Updated .

About this opportunity

Wayne County, North Carolina is soliciting sealed bids for a turnkey residential septic system installation at 1715 Old Mount Olive Highway in Dudley, funded under the 2021 Community Development Block Grant-Neighborhood Revitalization (CDBG-NR) project, with bids due December 1, 2026 at 2:00 p.m. No set-aside applies. The county encourages submissions from small, minority-owned, women-owned, and veteran-owned businesses, as well as Historically Underutilized Businesses and Section 3 business concerns. Bidders must hold an NC Onsite Wastewater Installer Certificate.

The work is a Type III residential system with a single effluent pump, two 1,000-gallon tanks, an effluent pumping system, and a horizontal panel block drainfield within an approved sand-fill mound area. The contractor must remove the existing septic tank, backfill it with clean sand, and seed and straw all disturbed areas. Pricing must cover labor, materials, equipment, transportation, supervision, excavation, disposal, inspections, permits, insurance, and incidental work. The contractor must also confirm proper operation of the pump, controls, and alarms after separately contracted plumbing and electrical connections. All work must conform to Wayne County Environmental Health Improvement Permit EH-IMPROV-2609-03103 and federal CDBG requirements, including Section 109, Executive Order 11246, Title VI of the Civil Rights Act of 1964, the Anti-Kickback Act, E-Verify, and the Contract Work Hours and Safety Standards Act.

The contract is funded entirely by $750,000 in federal 2021 CDBG-NR grant funds. The installation must finish by January 31, 2027, after house demolition under a separate contract and before delivery of the replacement modular house. Payment is Net 30 following invoice receipt, with 90 percent paid after Environmental Health approval and the final 10 percent paid after pump operation is demonstrated.

Bid submissions require at least three references from similar projects, a notarized E-Verify affidavit, a Responder's Certification Form, a Non-Collusion Affidavit, and a debarment and suspension certification. Contractors must carry workers' compensation with $1,000,000 employers' liability, $1,000,000 per occurrence commercial general liability, and $1,000,000 each accident commercial auto liability, naming Wayne County as additional insured. Sealed bids go to the Wayne County Courthouse, Finance Department, 224-226 East Walnut Street, 4th Floor, Goldsboro, NC 27530.

Opportunity text

Project Location: 1715 Old Mount Olive Hwy, Dudley, Wayne County, NC 28333 Project Type: Residential septic system replacement Reference Document: Wayne County Environmental Health Improvement Permit EH-IMPROV-2609-03103 Wayne County intends to demolish an existing owner-occupied house and replace it with a new modular house built to the NC State Building Code. Proposals are being received for the septic system that is to be replaced as part of this housing process. Attached is the Septic System Improvements Permit issued by the Wayne County Environmental Health Dept that includes all installation requirements. (See Attachment A) New septic system shall be installed in accordance with Permit. System will be a Type III residential septic system with single effluent pump, two 1,000-gallon tanks, an effluent pumping system, and a horizontal panel block drainfield constructed within an approved sand-fill mound area. Existing septic tank to be removed and backfilled with clean sand. Seed and straw all disturbed areas after completion. Septic system to be installed after existing house is demolished (separate contract) and before new modular house is delivered (separate contract). Plumber for new home installer will connect under separate contract the waste line from house to new septic tank. Electrician for new home installer will install under separate contract electrical wire from new house service panel to septic system pump control panel. Septic system Contractor to insure proper operation of pump, controls and alarms after plumbing and electric connections are made. Proposal for septic system replacement to be turnkey and include all costs of installation of new septic system, including labor, materials, equipment, transportation, supervision, excavation, disposal, inspections, permits, insurance, and incidental work necessary to provide a complete and operational septic system. All work shall conform to the Wayne County Environmental Health permit and the subsequently issued Authorization to Construct. Contractor shall coordinate all required inspections with the Wayne County Environmental Health Dept. Septic system Contractor shall provide copies of invoices and proof of payment for any suppliers or subcontractors that perform any work at job site. Partial payment of 90% of septic system contract to be made after completion and approval of installed septic system by the Wayne County Environmental Health Dept. Final payment of 10% will be made after plumbing and electrical connections have been made from the new house to the new septic system, and septic system Contractor has demonstrated proper operation of pump system. Award of septic system installation bid is anticipated in December 2026. Demolition of the existing house is projected to be completed by the end of December 2026 under a separate contract. Installation of replacement septic system is to be completed by the end of January 2027.

Files

File Type Posted
WAYNE COUNTY 2021 CDBG-NR SEPTIC SYSTEM RFB.docx DOCX document

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors