Replacement of PPC Deck Beams on SN 060-6113 carrying Pebble Creek Drive over Black Creek

Closed State & local contract opportunity Posted

Solicitation number
97908
State
Illinois
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Illinois Department of Transportation is soliciting competitive sealed bids for replacement of precast prestressed concrete deck beams on State Route 060-6113 carrying Pebble Creek Drive over Black Creek in the City of Alton, Kane County, with bids due September 18, 2026 at 12:00 p.m. via the iCX-Integrated Contractors Exchange system.

The scope encompasses superstructure removal, pavement removal, installation of new PPC deck beams, concrete wearing surface, asphalt pavement, curb and gutter, drainage structures and storm sewers, stage construction traffic control, and incidental work. The work extends approximately 140 feet (0.0265 miles) beginning on the east side of the bridge and progressing west. The project is funded through IDOT Construction Funds and includes federal-aid requirements; bidders must comply with Army Corps of Engineers Nationwide Permit No. 14 and federal environmental compliance obligations. Contract completion is April 30, 2027, with liquidated damages applicable for non-compliance.

Bidders must provide certifications including EEO documentation, labor compliance certifications, and DBE participation reporting. The contract specifications address detailed requirements for materials testing, quality assurance and quality control, worker safety protocols, concrete and asphalt specifications, temporary traffic signals, temporary concrete barriers, construction layout stakes, and shop drawings for precast deck beams. Compliance with current Standard Specifications for Road and Bridge Construction and the Manual on Uniform Traffic Control Devices is required.

The contract will be awarded to the lowest responsive and responsible bidder meeting conformity with established terms and conditions. IDOT reserves the right to reject any or all proposals and re-advertise.

Opportunity text

The proposed work consists of superstructure removal, pavement removal, new PPC deck beams, concrete wearing surface, asphalt pavement, curb & gutter, installation of new drainage structures and storm sewers, stage construction traffic control, and all incidental and collateral work necessary to complete the project as shown on the plans and as described therein. Location: This project is located along Pebble Creek Drive in the northeast corner of the City of Alton at its crossing of Black Creek. The work will begin on the east side of the bridge and move west approximately 140 feet. The gross/net length of the improvements is 140.0 feet (0.0265 miles).

Files

File Type Posted
ILDOT 97908-087.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors