About this opportunity
The Illinois Department of Transportation, Division of Aeronautics, is requesting electronic bids for work zone traffic control and protection services for replacement of airport perimeter fencing at Logan County Airport in Lincoln, with bids due June 12, 2026 at 12:00 p.m. via the iCX (Integrated Contractors Exchange) system.
The scope consists of furnishing, installation, maintenance, relocation, and removal of work zone traffic control and protection in accordance with FAA Advisory Circular 150/5370-2 (current issue). Work includes placement of temporary erosion control measures; removal of existing Class E fence and gates; installation of proposed Class E fence and gates; sweepers for pavement cleaning; flaggers and radio equipment for traffic control; and provision, set-up, operation, maintenance, and removal of lighted runway closure markers as shown in the Phasing Plan and Special Provisions. The contractor must be responsible for proper location, installation, and arrangement of all traffic control devices per the Plans.
Contract time is 51 calendar days for the base bid plus 4 additional calendar days for Additive Alternate #1. Award will be made within 90 calendar days to the lowest responsive and responsible bidder on the basis of lowest aggregate amount across base and additive alternates. The DBE participation goal is 0.0%. The contractor must perform at least 51 percent of contract work with its own organization and maintain a competent superintendent or foreman employed by the contractor. Illinois Prevailing Wage Act compliance is required. Liquidated damages apply for failure to complete work within contract time, ranging from $475 to $9,525 daily depending on original contract amount. All work shall be performed in accordance with the Illinois Standard Specifications for Construction of Airports (April 1, 2012 edition), Special Provisions (April 24, 2026), and Construction Plans (April 17, 2026). No pre-bid conference is scheduled. Prior to notice to proceed, the contractor must submit a pre-construction safety plan meeting FAA requirements and a construction phasing plan for approval by the airport manager and IDOT.
Opportunity text
This work shall consist of the furnishing, installation, maintenance, relocation, and removal of work zone traffic control and protection, and will be in accordance to the Plans, Plan details, and the guidelines specified in FAA Advisory Circular 150/5370-2 (current issue). The item shall also include the provision of: sweepers for pavement cleaning, flaggers and radio equipment for traffic control, and provision, set-up, operation, maintenance, and removal of lighted runway closure markers, as shown in the Phasing Plan and as specified in the Special Provisions. The Contractor shall be responsible for the proper location, installation, and arrangement of all traffic control devices as shown in the Plans.