Repair work at two inshore artificial reef sites
Cancelled State & local contract opportunity Posted
- Solicitation number
- 46200-DNR0000332
- State
- Georgia
- Responses due
Opportunity facts
- UNSPSC codes
- 78131707 Floating production storage and offloading facilities service
- 78182002 Coastal and transoceanic water vessel salvage and refloating service
- 78182000 Water transport vessel maintenance and repair services
- 40142600 Marine loading arm
- 40142601 LNG hydrocarbon liquid marine loading arm
- 40142602 Oil or Lpg or chemical rail/road tanker loading arm and gantry
- 78131706 Floating production system operation service
- 78182001 Inland water vessel salvage and refloating service
- Point of contact
-
- Lisa Morgan lisa_morgan@dnr.state.ga.us (404) 656-1788
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The Georgia Department of Natural Resources issued an RFQ on March 26, 2014 for repair work at two inshore artificial reef sites, with bids due April 9, 2014. The solicitation was cancelled on April 17, 2014 with no stated rationale.
The scope comprised replacement of two wooden pilings at the Timmons River site with concrete pilings (estimated 30 to 45 feet) to be installed at high tide with a minimum 15-foot height above water, and replacement of one sign at the Four Mile Island site, also at high tide. GADNR was to provide signage, wooden framing, and reference photographs. Award was to be made to the lowest responsive and responsible bidder meeting specifications. No contract value, incumbent, or evaluation criteria were disclosed. Questions were to be submitted in writing to Lisa Morgan at lisa_morgan@dnr.state.ga.us.
Opportunity text
REPAIR WORK AT TWO INSHORE ARTIFICIAL REEF SITES. 1. The replacement of 2 wooden pilings at the Timmons River site with 2 concrete pilings, work to be conducted at high tide. See attached photographs of previous wooden pilings being replaced by barge, crane, and pile driver. The pilings need to sit a minimum of 15¿ out of the water at high tide. I assume that two 30¿ to 45¿ concrete piling will be needed to complete this task. GADNR will provide signage and wooden framing that you would also need to attach to each piling. 2. The replacement of one sign at the Four Mile Island site, work to be conducted at high tide. GADNR will provide the sign and wooden frame, see attached photographs. AWARD SHALL BE MADE TO THE LOWEST RESPONSIVE AND RESPONSIBLE BIDDER MEETING SPECIFICATIONS. Please read the eRFQ Instructions for help in navigating through the system, preparing your bid, and downloading and uploading attachments. You must select the VIEW/ADD COMMENTS AND ATTACHMENTS link to view the attachments. To open attachments, hold down the control key and click on the icon beside the attachment. Continue to hold down the control key until a new window opens with a prompt to open the attachment. Click on open. Questions regarding the registration process or navigating through the system can be directed to the Help Desk at procurementhelp@doas.ga.gov or by calling 404-657-6000. All other questions concerning this RFQ must be submitted in writing via email to Lisa_morgan@dnr.state.ga.us. No questions other than written will be accepted. No response other than written will be binding upon the state. It is the Bidder's responsibility to review this RFQ on a regular basis dureing the solicitation period for answers to related questions submitted and for any addenda that may be posted.