About this opportunity
Vance Air Force Base in Enid, Oklahoma is soliciting bids for repair and installation of natural gas pipeline infrastructure across the base under XTLF 21-1031, with proposals due August 25, 2026 and mandatory pre-bid conference and site visit required before bidding.
The scope spans eight independent construction zones (XTLF 21-1031PA through XTLF 21-1031PH) involving installation of polyethylene pipe for natural gas transmission, all required fittings, valves, casings, and meters throughout the base. Work includes pavement repairs related to trenching, soding of disturbed areas, and comprehensive testing. The project must comply with 49 CFR 192 and NFPA 58 standards. Each zone is a complete and useable area that can be completed independently of other zones.
Contractors must provide a qualified superintendent with minimum three years of relevant experience on-site at all times and submit a Baseline Construction Schedule in Network Analysis Schedule format within 30 calendar days of contract award and prior to work initiation. Contractors bear all costs for construction sampling, testing by licensed Oklahoma laboratories, material procurement, equipment, temporary facilities, utility coordination (requiring 21 days advance notice for service interruptions), contaminated soil management, and project cleanup and restoration. Work is restricted to standard hours of 0700 to 1645 on weekdays. Contractors must obtain dig permits, burn permits, and portable sanitation units and implement Foreign Object Debris prevention measures. Certified testing laboratory reports must be submitted within 24 hours of test completion. Full compliance with OSHA standards, Air Force regulations, and federal, state, and local safety requirements is mandatory.
The specifications document (XTLF_21_1031_Repair_Natural_Gas_Specifications.pdf) was prepared by the Civil Engineering Design Branch at Vance AFB in October 2025 and sets detailed technical requirements across general provisions, earthwork, utilities, natural gas piping, and distribution pipelines. No contract value, funding source, or incumbent is identified in available materials.
Opportunity text
237120 - Oil and Gas Pipeline and Related Structures Construction. The work includes the installation of new polyethyelene pipe for natural gas transmission throughout Vance Air Base. Construction documents show eight different zones of construction. Each zone is a complete and useable area and can be completed without any other zone being completed. Project will also install all required fittings, valves, casings and meters as well as any other incidental related work, including, but not limited to pavement repairs related to trenching, sodding of disturbed areas and required testing.
Files
| File | Type | Posted |
|---|---|---|
| XTLF_21-1031_Repair_Natural_Gas_Specifications.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity