Remer Sewer Rehabilitation- Phase 1
Closed State & local contract opportunity Posted
- Solicitation number
- PE-66249-NONST-2025-000000041
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 89030 Manholes, And Manhole Covers, Frames, Grates, Rings, Yokes, Etc.
- 91219 Clearing And Grubbing Services
- 91242 Drilling And Boring Services, Horizontal Directional (Hdd And Hdb)
- 91244 Excavation Services
- 91340 Construction, Pipeline
- 91356 Construction, Utility/Underground Projects
- 98815 Fence Installation, Maintenance And Repair
- UNSPSC codes
- 72141502 Land pre-construction assessment service
- 72141504 Timber removal service
- 72141126 Underground utilities construction service
- 72154027 Posthole digging service
- 30121721 Drainage earth and sand barrel
- 72141503 Rock removal service
- 73151801 Sheeting services
- 72141110 Oil and gas branch line construction service
- 95121641 Pumping station
- 30121713 Manhole cover
Show all 27
- 30121714 Manhole box
- 72141505 Earthmoving service
- 73151802 Slitting services
- 95121800 Utility buildings and structures
- 72141112 Natural gas compressor station construction service
- 95121803 Nuclear power station
- 95121802 Substation
- 95121801 Radar station
- 72154013 Fence construction service
- 72154069 Fencing and railing service
- 30121605 Manhole frames with covers
- 72141500 Land preparation services
- 72141124 Pipe laying service
- 95121640 Pipeline
- 72141111 Gas main construction service
- 72141114 Pipeline wrapping service
- 72141113 Oil and gas pipeline construction service
- Point of contact
-
- Chelsea Nevels cnevels@valdostacity.com (229) 259-3530
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Valdosta is seeking sealed bids for the Remer Sewer Rehabilitation - Phase 1 project, a comprehensive sanitary sewer infrastructure improvement initiative located in Liberty County, Georgia. The procurement opportunity involves repairing and replacing approximately 610 linear feet of sanitary sewer trunkline/main, with a comprehensive scope of work that includes initial condition survey and video documentation, site clearing, bypass pumping, and cleaning of an existing 18" concrete sewer pipe. Contractors will be responsible for installing PVC/HDPE liners, performing grouting procedures, repairing manholes, and installing manhole lining. Additional project requirements include implementing erosion and sedimentation control measures and establishing permanent groundcover. Sealed bids will be received at the City Engineer's office, located in the City Hall Annex Building at 300 N. Lee Street, Valdosta, with a strict submission deadline of 10:20 AM local time on Thursday, April 10, 2025. Prospective bidders will need to demonstrate technical capabilities in municipal infrastructure rehabilitation and provide comprehensive documentation of their proposed approach to the project.
While specific set-aside designations or disadvantaged enterprise requirements are not explicitly detailed in the provided documentation, potential bidders should be prepared to meet standard municipal contracting qualifications. The project appears to be a targeted infrastructure improvement initiative focusing on critical sewer system rehabilitation. Given the technical nature of the work, contractors will likely need specialized experience in municipal utility infrastructure, particularly in sewer line rehabilitation techniques including liner installation and manhole repair. Although a specific budget range is not disclosed, municipal infrastructure projects of this scale typically represent significant capital investments, potentially ranging from $500,000 to $1.5 million depending on complexity and specific rehabilitation requirements. Interested contractors should carefully review the attached bid document (RemerSewerRehabPhase1_ContractBid (1).pdf) for comprehensive details on submission requirements, technical specifications, and evaluation criteria.
Opportunity text
Sealed bids will be received by the City of Valdosta at the office of the City Engineer, City Hall Annex Building, 300 N. Lee Street, Valdosta, Georgia, until 10:20 AM, Local Time, on Thursday, April 10, 2025 for repairing/replacing approximately 610 linear feet of sanitary sewer trunkline/main including related work. The work consists of initial condition survey and video records, clearing, bypass pumping, cleaning of existing 18" concrete sewer pipe, installation of PVC/HDPE liners, grouting, repair manholes and installation of manhole lining, erosion & sedimentation control measures, permanent grassing/groundcover and all related work.
Files
| File | Type | Posted |
|---|---|---|
| RemerSewerRehabPhase1_ContractBid (1).pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity